메뉴 건너뛰기




Volumn 37, Issue , 2015, Pages 521-532

A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling

Author keywords

Genetic algorithm; Multi objective optimization; Process planning and scheduling; Remanufacturing

Indexed keywords

ALGORITHMS; EMISSION CONTROL; ENERGY CONSERVATION; GENETIC ALGORITHMS; INTELLIGENT SYSTEMS; MONTE CARLO METHODS; OPTIMIZATION; PARETO PRINCIPLE; PROCESS PLANNING; PRODUCTION CONTROL; SCHEDULING;

EID: 84941907815     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2015.08.051     Document Type: Article
Times cited : (64)

References (27)
  • 1
    • 84904346289 scopus 로고    scopus 로고
    • The carbon subsidy analysis in remanufacturing closed-loop supply chain
    • J. Li, W. Du, F. Yang, and G. Hua The carbon subsidy analysis in remanufacturing closed-loop supply chain Sustainability 6 6 2014 3861 3877
    • (2014) Sustainability , vol.6 , Issue.6 , pp. 3861-3877
    • Li, J.1    Du, W.2    Yang, F.3    Hua, G.4
  • 2
    • 84899649394 scopus 로고    scopus 로고
    • Product remanufacturing: a real options approach
    • W. Shi, and K.J. Min Product remanufacturing: a real options approach IEEE Trans. Eng. Manag. 61 2 2014 237 250
    • (2014) IEEE Trans. Eng. Manag. , vol.61 , Issue.2 , pp. 237-250
    • Shi, W.1    Min, K.J.2
  • 3
    • 84921044718 scopus 로고    scopus 로고
    • Remanufacturing, third-party competition, and consumers' perceived value of new products
    • V.V. Agrawal, A. Atasu, and K. Van Ittersum Remanufacturing, third-party competition, and consumers' perceived value of new products Manag. Sci. 61 1 2015 60 72
    • (2015) Manag. Sci. , vol.61 , Issue.1 , pp. 60-72
    • Agrawal, V.V.1    Atasu, A.2    Van Ittersum, K.3
  • 4
    • 84901940552 scopus 로고    scopus 로고
    • Supply chain-based barriers for truck-engine remanufacturing in China
    • Q. Zhu, J. Sarkis, and K.-h. Lai Supply chain-based barriers for truck-engine remanufacturing in China Transp. Res. Part E: Logist. Transp. Rev. 68 2014 103 117
    • (2014) Transp. Res. Part E: Logist. Transp. Rev. , vol.68 , pp. 103-117
    • Zhu, Q.1    Sarkis, J.2    Lai, K.-H.3
  • 5
    • 84929172361 scopus 로고    scopus 로고
    • Optimal pricing for new and remanufactured products
    • J.D. Abbey, J.D. Blackburn, and V.D.R. Guide Optimal pricing for new and remanufactured products J. Oper. Manag. 36 2015 130 146
    • (2015) J. Oper. Manag. , vol.36 , pp. 130-146
    • Abbey, J.D.1    Blackburn, J.D.2    Guide, V.D.R.3
  • 6
    • 84926348362 scopus 로고    scopus 로고
    • Retail services and pricing decisions in a closed-loop supply chain with remanufacturing
    • Z.-Z. Zhang, Z.-J. Wang, and L.-W. Liu Retail services and pricing decisions in a closed-loop supply chain with remanufacturing Sustainability 7 3 2015 2373 2396
    • (2015) Sustainability , vol.7 , Issue.3 , pp. 2373-2396
    • Zhang, Z.-Z.1    Wang, Z.-J.2    Liu, L.-W.3
  • 7
    • 84887812623 scopus 로고    scopus 로고
    • A flexibly structured lot sizing heuristic for a static remanufacturing system
    • T. Schulz, and G. Voigt A flexibly structured lot sizing heuristic for a static remanufacturing system Omega - Int. J. Manag. Sci. 44 2014 21 31
    • (2014) Omega - Int. J. Manag. Sci. , vol.44 , pp. 21-31
    • Schulz, T.1    Voigt, G.2
  • 9
    • 84912096624 scopus 로고    scopus 로고
    • A case-based reasoning method for remanufacturing process planning
    • F. Zhou, Z. Jiang, H. Zhang, and Y. Wang A case-based reasoning method for remanufacturing process planning Discrete Dyn. Nat. Soc. 2014 10.1155/2014/168631
    • (2014) Discrete Dyn. Nat. Soc.
    • Zhou, F.1    Jiang, Z.2    Zhang, H.3    Wang, Y.4
  • 11
    • 84884410191 scopus 로고    scopus 로고
    • A swarm intelligence approach to flexible job-shop scheduling problem with no-wait constraint in remanufacturing
    • S. Sundar, P.N. Suganthan, and T.J. Chua A swarm intelligence approach to flexible job-shop scheduling problem with no-wait constraint in remanufacturing Lect. Notes Comput. Sci. 7895 2013 593 602
    • (2013) Lect. Notes Comput. Sci. , vol.7895 , pp. 593-602
    • Sundar, S.1    Suganthan, P.N.2    Chua, T.J.3
  • 13
    • 84882450695 scopus 로고    scopus 로고
    • A systematic literature review of remanufacturing scheduling
    • S.D. Morgan, and R.J. Gagnon A systematic literature review of remanufacturing scheduling Int. J. Prod. Res. 51 16 2013 4853 4879
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.16 , pp. 4853-4879
    • Morgan, S.D.1    Gagnon, R.J.2
  • 14
    • 84878315723 scopus 로고    scopus 로고
    • A neuro-fuzzy model for a new hybrid integrated process planning and scheduling system
    • A. Seker, S. Erol, and R. Botsali A neuro-fuzzy model for a new hybrid integrated process planning and scheduling system Expert Syst. Appl. 40 13 2013 5341 5351
    • (2013) Expert Syst. Appl. , vol.40 , Issue.13 , pp. 5341-5351
    • Seker, A.1    Erol, S.2    Botsali, R.3
  • 15
    • 84880249745 scopus 로고    scopus 로고
    • A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem
    • L. Zhang, L. Gao, and X. Li A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem Int. J. Prod. Res. 51 12 2013 3516 3531
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3516-3531
    • Zhang, L.1    Gao, L.2    Li, X.3
  • 16
    • 84922262786 scopus 로고    scopus 로고
    • Multi-objective process planning and scheduling using controlled elitist non-dominated sorting genetic algorithm
    • P. Mohapatra, A. Nayak, S.K. Kumar, and M.K. Tiwari Multi-objective process planning and scheduling using controlled elitist non-dominated sorting genetic algorithm Int. J. Prod. Res. 53 6 2015 1712 1735
    • (2015) Int. J. Prod. Res. , vol.53 , Issue.6 , pp. 1712-1735
    • Mohapatra, P.1    Nayak, A.2    Kumar, S.K.3    Tiwari, M.K.4
  • 17
    • 84897653626 scopus 로고    scopus 로고
    • Integration of process planning and job shop scheduling with stochastic processing time
    • M. Haddadzade, M.R. Razfar, and M.H.F. Zarandi Integration of process planning and job shop scheduling with stochastic processing time Int. J. Adv. Manuf. Technol. 71 1-4 2014 241 252
    • (2014) Int. J. Adv. Manuf. Technol. , vol.71 , Issue.1-4 , pp. 241-252
    • Haddadzade, M.1    Razfar, M.R.2    Zarandi, M.H.F.3
  • 18
    • 84906327432 scopus 로고    scopus 로고
    • A graph-based ant colony optimization approach for integrated process planning and scheduling
    • J. Wang, X. Fan, C. Zhang, and S. Wan A graph-based ant colony optimization approach for integrated process planning and scheduling Chin. J. Chem. Eng. 22 7 2014 748 753
    • (2014) Chin. J. Chem. Eng. , vol.22 , Issue.7 , pp. 748-753
    • Wang, J.1    Fan, X.2    Zhang, C.3    Wan, S.4
  • 19
    • 84898029881 scopus 로고    scopus 로고
    • A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems
    • A. Bensmaine, M. Dahane, and L. Benyoucef A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems Int. J. Prod. Res. 52 12 2014 3583 3594
    • (2014) Int. J. Prod. Res. , vol.52 , Issue.12 , pp. 3583-3594
    • Bensmaine, A.1    Dahane, M.2    Benyoucef, L.3
  • 20
    • 84876531277 scopus 로고    scopus 로고
    • An approach for integration of process planning and scheduling
    • R.K. Phanden, A. Jain, and R. Verma An approach for integration of process planning and scheduling Int. J. Comput. Integr. Manuf. 26 4 2013 284 302
    • (2013) Int. J. Comput. Integr. Manuf. , vol.26 , Issue.4 , pp. 284-302
    • Phanden, R.K.1    Jain, A.2    Verma, R.3
  • 21
    • 0000131281 scopus 로고
    • Algorithms for solving production-scheduling problems
    • B. Giffler, and G.L. Thompson Algorithms for solving production-scheduling problems Oper. Res. 8 4 1960 487 503
    • (1960) Oper. Res. , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 23
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multiobjective genetic algorithm: NSGA-II IEEE Trans. Evol. Comput. 6 2 2002 182 197
    • (2002) IEEE Trans. Evol. Comput. , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 25
    • 0033318858 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach
    • E. Zitzler, and L. Thiele Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach IEEE Trans. Evol. Comput. 3 4 1999 257 271
    • (1999) IEEE Trans. Evol. Comput. , vol.3 , Issue.4 , pp. 257-271
    • Zitzler, E.1    Thiele, L.2
  • 26
    • 28244475963 scopus 로고    scopus 로고
    • Evolving better population distribution and exploration in evolutionary multi-objective optimization
    • K.C. Tan, C.K. Goh, Y.J. Yang, and T.H. Lee Evolving better population distribution and exploration in evolutionary multi-objective optimization Eur. J. Oper. Res. 171 2 2006 463 495
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.2 , pp. 463-495
    • Tan, K.C.1    Goh, C.K.2    Yang, Y.J.3    Lee, T.H.4
  • 27
    • 77649318858 scopus 로고    scopus 로고
    • Optimal budget allocation for discrete-event simulation experiments
    • C.-H. Chen, E. Yücesan, L. Dai, and H.-C. Chen Optimal budget allocation for discrete-event simulation experiments IIE Trans. 42 1 2009 60 70
    • (2009) IIE Trans , vol.42 , Issue.1 , pp. 60-70
    • Chen, C.-H.1    Yücesan, E.2    Dai, L.3    Chen, H.-C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.