메뉴 건너뛰기




Volumn 6, Issue 4, 2014, Pages

Mutation particle swarm optimization algorithm for solving the optimal operation model of thermal power plants

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; ELECTRIC INDUSTRY; GENETIC ALGORITHMS; INTEGER PROGRAMMING; STOCHASTIC SYSTEMS; THERMOELECTRIC POWER PLANTS;

EID: 84928654954     PISSN: 19417012     EISSN: None     Source Type: Journal    
DOI: 10.1063/1.4892517     Document Type: Article
Times cited : (7)

References (41)
  • 3
    • 77952839988 scopus 로고    scopus 로고
    • Short-term scheduling of hydrothermal power system considering environmental protection and time-of-use price
    • H. Dong and C. X. Guo, " Short-term scheduling of hydrothermal power system considering environmental protection and time-of-use price," Power Syst. Technol. 33 (14), 78-83 (2009).
    • (2009) Power Syst. Technol. , vol.33 , Issue.14 , pp. 78-83
    • Dong, H.1    Guo, C.X.2
  • 4
    • 84938165404 scopus 로고
    • Generation unit commitment by dynamic programming
    • 10.1109/TPAS.1966.291679
    • P. G. Lowery, " Generation unit commitment by dynamic programming," IEEE Trans. Power Syst. 85 (5), 422-426 (1966). 10.1109/TPAS.1966.291679
    • (1966) IEEE Trans. Power Syst. , vol.85 , Issue.5 , pp. 422-426
    • Lowery, P.G.1
  • 5
    • 0016978198 scopus 로고
    • Optimal short-term thermal unit commitment
    • 10.1109/T-PAS.1976.32228
    • C. K. Pang and H. C. Chen, " Optimal short-term thermal unit commitment," IEEE Trans. Power Appar. Syst. 95 (4), 1336-1346 (1976). 10.1109/T-PAS.1976.32228
    • (1976) IEEE Trans. Power Appar. Syst. , vol.95 , Issue.4 , pp. 1336-1346
    • Pang, C.K.1    Chen, H.C.2
  • 6
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
    • 10.1109/59.466524
    • S. J. Wang, M. Shahidehpour, D. S. Kirschen, and S. Mokhtar, " Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation," IEEE Trans. Power Syst. 10 (3), 1294-1301 (1995). 10.1109/59.466524
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, M.2    Kirschen, D.S.3    Mokhtar, S.4
  • 7
    • 0033896265 scopus 로고    scopus 로고
    • Lambda of Lagrangian relaxation solution to unit commitment problem
    • DOI 10.1049/ip-gtd:20000173
    • A. G. Bakiritzis and D. E. Zoumas, " Lamda of Lagrangian relaxation solution to unit commitment problem," IET Generation Transmission Distribution 147 (2), 131-136 (2000). 10.1049/ip-gtd:20000173 (Pubitemid 30563893)
    • (2000) IEE Proceedings: Generation, Transmission and Distribution , vol.147 , Issue.2 , pp. 131-136
    • Bakirtzis, A.G.1    Zoumas, C.E.2
  • 9
    • 84886085924 scopus 로고    scopus 로고
    • Tight and compact MILP formulation for the thermal unit commitment problem
    • 10.1109/TPWRS.2013.2251373
    • G. Morales-Espana, J. M. Latorre, and A. Ramos, " Tight and compact MILP formulation for the thermal unit commitment problem," IEEE Trans. Power Syst. 28, 4897 (2013). 10.1109/TPWRS.2013.2251373
    • (2013) IEEE Trans. Power Syst. , vol.28 , pp. 4897
    • Morales-Espana, G.1    Latorre, J.M.2    Ramos, A.3
  • 10
    • 32144455377 scopus 로고    scopus 로고
    • Security-constrained optimal generation scheduling in large-scale power systems
    • DOI 10.1109/TPWRS.2005.860942
    • M. Carrin and J. M. Arroyo, " A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem," IEEE Trans. Power Syst. 21 (1), 321-332 (2006). 10.1109/TPWRS.2005.860942 (Pubitemid 43204730)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.1 , pp. 321-332
    • Martinez-Crespo, J.1    Usaola, J.2    Fernandez, J.L.3
  • 12
    • 28244436239 scopus 로고    scopus 로고
    • Unit commitment with primary frequency regulation constraints
    • DOI 10.1109/TPWRS.2005.857011
    • J. F. Restrepo and F. D. Galiana, " Unit commitment with primary frequency regulation constraints," IEEE Trans. Power Syst. 20 (4), 1836-1842 (2005). 10.1109/TPWRS.2005.857011 (Pubitemid 41700536)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 1836-1842
    • Restrepo, J.F.1    Galiana, F.D.2
  • 13
    • 63449111241 scopus 로고    scopus 로고
    • A new decomposition approach for the thermal unit commitment problem
    • 10.1016/j.apenergy.2009.01.022
    • T. Niknam, A. Khodaei, and F. Fallahi, " A new decomposition approach for the thermal unit commitment problem," Appl. Energy 86, 1667-1674 (2009). 10.1016/j.apenergy.2009.01.022
    • (2009) Appl. Energy , vol.86 , pp. 1667-1674
    • Niknam, T.1    Khodaei, A.2    Fallahi, F.3
  • 14
    • 84859431811 scopus 로고    scopus 로고
    • A new approach based on benders decomposition for unit commitment problem
    • S. Rahimi, T. Niknam, and F. Fallahi, " A new approach based on benders decomposition for unit commitment problem," World Appl. Sci. J. 6 (12), 1665-1672 (2009); PDF online at idosi.org/wasj/wasj6(12)/14.pdf.
    • (2009) World Appl. Sci. J. , vol.6 , Issue.12
    • Rahimi, S.1    Niknam, T.2    Fallahi, F.3
  • 15
    • 67650551279 scopus 로고    scopus 로고
    • Improved algorithm of evolutionary programming and its application research on optimization of ordering plan
    • 10.1016/S1874-8651(10)60055-5
    • W. Yong, Z. Gang, and Z. Bei qian, " Improved algorithm of evolutionary programming and its application research on optimization of ordering plan," Syst. Eng.-Theor. Pract. 29 (6), 172-177 (2009). 10.1016/S1874-8651(10)60055-5
    • (2009) Syst. Eng.-Theor. Pract. , vol.29 , Issue.6 , pp. 172-177
    • Yong, W.1    Gang, Z.2    Qian, Z.B.3
  • 16
    • 77950576550 scopus 로고    scopus 로고
    • Study on optimal scheduling model of NSGA-II algorithm for system of hydro and thermal power plants
    • Z. Zhigang and M. Guangwen, " Study on optimal scheduling model of NSGA-II algorithm for system of hydro and thermal power plants," J. Hydroelectr. Eng. 29 (1), 213-218 (2010).
    • (2010) J. Hydroelectr. Eng. , vol.29 , Issue.1 , pp. 213-218
    • Zhigang, Z.1    Guangwen, M.2
  • 18
    • 1442264390 scopus 로고    scopus 로고
    • Unit commitment by enhanced adaptive Lagrangian relaxation
    • 10.1109/TPWRS.2003.820707
    • W. Ongsakul and N. Petcharaks, " Unit commitment by enhanced adaptive Lagrangian relaxation," IEEE Trans. Power Syst. 19 (1), 620-628 (2004). 10.1109/TPWRS.2003.820707
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.1 , pp. 620-628
    • Ongsakul, W.1    Petcharaks, N.2
  • 20
    • 0033222003 scopus 로고    scopus 로고
    • Evolutionary programming solution to the unit commitment problem
    • DOI 10.1109/59.801925
    • K. A. Juste, H. Kita, and E. Tanaka, " An evolutionary programming to the unit commitment problem," IEEE Trans. Power Syst. 14, 1452-1459 (1999). 10.1109/59.801925 (Pubitemid 32082808)
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.4 , pp. 1452-1459
    • Juste, K.A.1    Kita, H.2    Tanaka, E.3    Hasegawa, J.4
  • 21
    • 0030082551 scopus 로고    scopus 로고
    • The ant system: Optimization by a colony of cooperating agents
    • M. Dorigo, V. Maniezzo, and A. Colorni, " The ant system: Optimization by a colony of cooperating agents," IEEE Trans. Power Syst. Man, and Cyber.-Part B 26 (1), 1-13 (1996).
    • (1996) IEEE Trans. Power Syst. , vol.26 , Issue.1 , pp. 1-13
    • Dorigo, M.1    Maniezzo, V.2    Colorni, A.3
  • 23
    • 0035451122 scopus 로고    scopus 로고
    • Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches
    • DOI 10.1109/60.937211, PII S0885896901073399
    • S. Huang, " Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches," IEEE Trans. Energy Convers. 16, 296-301 (2001). 10.1109/60.937211 (Pubitemid 32780124)
    • (2001) IEEE Transactions on Energy Conversion , vol.16 , Issue.3 , pp. 296-301
    • Huang, S.-J.1
  • 24
    • 79959753985 scopus 로고    scopus 로고
    • Multi-objective economic scheduling for hydrothermal power systems based on genetic algorithm and data envelopment analysis
    • W. Jiekang, T. Litao, H. Huan et al., " Multi-objective economic scheduling for hydrothermal power systems based on genetic algorithm and data envelopment analysis," Power Syst. Technol. 35 (5), 76-81 (2011); available online at http://www.dwjs.com.cn/EN/Y2011/V35/I5/76.
    • (2011) Power Syst. Technol. , vol.35 , Issue.5
    • Jiekang, W.1    Litao, T.2    Huan, H.3
  • 25
    • 61749090411 scopus 로고    scopus 로고
    • Modeling high level system design and unit commitment for a micro grid
    • 10.1016/j.apenergy.2008.09.006
    • A. D. Hawkes and M. A. Leach, " Modeling high level system design and unit commitment for a micro grid," Appl. Energy 86, 1253-1265 (2009). 10.1016/j.apenergy.2008.09.006
    • (2009) Appl. Energy , vol.86 , pp. 1253-1265
    • Hawkes, A.D.1    Leach, M.A.2
  • 26
    • 2542640865 scopus 로고    scopus 로고
    • A solution to the unit commitment problem using integer coded genetic algorithm
    • 10.1109/TPWRS.2003.821625
    • I. G. Damousis, A. G. Bakirtzis, and P. S. Do kopoulos, " A solution to the unit commitment problem using integer coded genetic algorithm," IEEE Trans. Power Syst. 19 (2), 1165-1172 (2004). 10.1109/TPWRS.2003.821625
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.2 , pp. 1165-1172
    • Damousis, I.G.1    Bakirtzis, A.G.2    Kopoulos, P.S.D.3
  • 28
    • 0034186815 scopus 로고    scopus 로고
    • Unit commitment by Lagrangian relaxation and genetic algorithms
    • 10.1109/59.867163
    • C. P. Cheng, C. W. Liu, and G. C. Liu, " Unit commitment by Lagrangian relaxation and genetic algorithms," IEEE Trans. Power Syst. 15 (2), 707-714 (2000). 10.1109/59.867163
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.2 , pp. 707-714
    • Cheng, C.P.1    Liu, C.W.2    Liu, G.C.3
  • 29
    • 33748094080 scopus 로고    scopus 로고
    • Obturator hematoma after the transobturator suburethral tape procedure
    • DOI 10.1016/j.epsr.2005.10.005, PII 0000625020060900100005, SUPPL.
    • L. Sun, Y. Zhang, and C. Jiang, " A matrix real-coded genetic algorithm to the unit commitment problem," Electr. Power Syst. Res. 76, 716-728 (2006). 10.1016/j.epsr.2005.10.005 (Pubitemid 44306399)
    • (2006) Obstetrics and Gynecology , vol.108 , pp. 716-718
    • Sun, M.-J.1    Chen, G.-D.2    Lin, K.-C.3
  • 30
    • 33947688232 scopus 로고    scopus 로고
    • A floating-point genetic algorithm for solving the unit commitment problem
    • 10.1016/j.ejor.2005.10.071
    • C. Dang and M. Li, " A floating-point genetic algorithm for solving the unit commitment problem," Eur. J. Oper. Res. 181 (4), 1370-1395 (2006). 10.1016/j.ejor.2005.10.071
    • (2006) Eur. J. Oper. Res. , vol.181 , Issue.4 , pp. 1370-1395
    • Dang, C.1    Li, M.2
  • 31
    • 0036497198 scopus 로고    scopus 로고
    • A seeded memetic algorithm for large unit commitment problems
    • DOI 10.1023/A:1017960507177
    • J. Valenzuela and A. Smith, " A seeded mimetic algorithm for large unit commitment problems," J. Heuristics 8 (2), 173-195 (2002). 10.1023/A:1017960507177 (Pubitemid 34249457)
    • (2002) Journal of Heuristics , vol.8 , Issue.2 , pp. 173-195
    • Valenzuela, J.1    Smith, A.E.2
  • 32
    • 31344459621 scopus 로고    scopus 로고
    • Emerging solution of large-scale unit commitment problem by Stochastic Priority List
    • DOI 10.1016/j.epsr.2005.07.002, PII S0378779605001975
    • T. Senjyu, T. Miyagi, and A. Y. Saber, " Emerging solution of large-scale unit commitment problem by stochastic priority list," Electr. Power Syst. Res. 76, 283-292 (2006). 10.1016/j.epsr.2005.07.002 (Pubitemid 43144638)
    • (2006) Electric Power Systems Research , vol.76 , Issue.5 , pp. 283-292
    • Senjyu, T.1    Miyagi, T.2    Saber, A.Y.3    Urasaki, N.4    Funabashi, T.5
  • 33
    • 0038519486 scopus 로고    scopus 로고
    • A fast technique for unit commitment problem by extended priority list
    • 10.1109/TPWRS.2003.811000
    • T. Senjyu, K. Shimabukuro, K. Uezato, and T. Funabashi, " A fast technique for unit commitment problem by extended priority list," IEEE Trans. Power Syst. 18 (2), 882-888 (2003). 10.1109/TPWRS.2003.811000
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.2 , pp. 882-888
    • Senjyu, T.1    Shimabukuro, K.2    Uezato, K.3    Funabashi, T.4
  • 34
    • 20444464059 scopus 로고    scopus 로고
    • A priority list-based evolutionary algorithm to solve large scale unit commitment problem
    • 2004 International Conference on Power System Technology, POWERCON 2004
    • D. Srinivasan and J. Chazelas, " A priority list-based evolutionary algorithm to solve large scale unit commitment problem," in International Conference on Power System Technology (2004), Vol. 90, pp. 1746-1751. (Pubitemid 40821638)
    • (2004) 2004 International Conference on Power System Technology, POWERCON 2004 , vol.2 , pp. 1746-1751
    • Srinivasan, D.1    Chazelas, J.2
  • 35
    • 0036881676 scopus 로고    scopus 로고
    • An optimizing method based on autonomous animals: Fish-swarm algorithm
    • L. Xiaolei, S. Zhijiang, and Q. Jixin, " An optimizing method based on autonomous animals: fish-swarm algorithm," Syst. Eng.-Theor. Pract. 22 (11), 32-38 (2002) 10.3321/j.issn:1000-6788.2002.11.007.
    • (2002) Syst. Eng.-Theor. Pract. , vol.22 , Issue.11
    • Xiaolei, L.1    Zhijiang, S.2    Jixin, Q.3
  • 36
    • 77950549475 scopus 로고    scopus 로고
    • Short-term electricity price prediction based on resilient adaptive artificial fish school algorithm and back propagation neural network hybrid algorithm
    • S. Biao, L. Yu Xia, Y. Xin hua et al., " Short-term electricity price prediction based on resilient adaptive artificial fish school algorithm and back propagation neural network hybrid algorithm," J. Hydroelectr. Eng. 29 (1), 106-114 (2010).
    • (2010) J. Hydroelectr. Eng. , vol.29 , Issue.1 , pp. 106-114
    • Biao, S.1    Xia, L.Y.2    Hua, Y.X.3
  • 37
    • 78649256034 scopus 로고    scopus 로고
    • Multi-objective optimal dispatch of cascade hydropower stations based on shuffled particle swarm operation algorithm
    • Z. Jian zhong, L. Ying hai, X. Ge et al., " Multi-objective optimal dispatch of cascade hydropower stations based on shuffled particle swarm operation algorithm," J. Hydroelectr. Eng. 41 (10), 1212-1219 (2010).
    • (2010) J. Hydroelectr. Eng. , vol.41 , Issue.10 , pp. 1212-1219
    • Zhong, Z.J.1    Hai, L.Y.2    Ge, X.3
  • 38
    • 33745683834 scopus 로고    scopus 로고
    • An improved particle swarm optimization algorithm for unit commitment
    • 10.1016/j.ijepes.2006.02.011
    • B. Zhao, C. X. Guo, B. R. Bai, and Y. J. Cao, " An improved particle swarm optimization algorithm for unit commitment," Elect. Power Energy Syst. 28, 482-490 (2006). 10.1016/j.ijepes.2006.02.011
    • (2006) Elect. Power Energy Syst. , vol.28 , pp. 482-490
    • Zhao, B.1    Guo, C.X.2    Bai, B.R.3    Cao, Y.J.4
  • 39
    • 33746484868 scopus 로고
    • Scheduling electric power generators using particle swarm optimization combined with the Lagrangian relaxation method
    • H. H. Balci and J. F. Valenzuela, " Scheduling electric power generators using particle swarm optimization combined with the Lagrangian relaxation method," Int. J. Appl. Math. Comput. Sci. 14 (3), 411-421 (1989); PDF available online at matwbn.icm.edu.pl/ksiazki/amc/amc14/amc14310. pdf.
    • (1989) Int. J. Appl. Math. Comput. Sci. , vol.14 , Issue.3
    • Balci, H.H.1    Valenzuela, J.F.2
  • 40
    • 78651567968 scopus 로고    scopus 로고
    • Short-term electricity price forecast model based on adaptive variable coefficients particle swarm optimizer and radial basis function neural network hybrid algorithm
    • S. Biao, L. Yu. Xia, Y. Xin hua et al., " Short-term electricity price forecast model based on adaptive variable coefficients particle swarm optimizer and radial basis function neural network hybrid algorithm," Power Syst. Technol. 34 (1), 98-106 (2010).
    • (2010) Power Syst. Technol. , vol.34 , Issue.1 , pp. 98-106
    • Biao, S.1    Xia, L.Yu.2    Hua, Y.X.3
  • 41
    • 79960034762 scopus 로고    scopus 로고
    • Short-term load prediction based on dynamic adjustment ant colony system and back propagation neural network hybrid algorithm
    • S. Biao, L. Yu xia, Y. Xin hua et al., " Short-term load prediction based on dynamic adjustment ant colony system and back propagation neural network hybrid algorithm," J. Hydroelectr. Eng. 30 (3), 5-9 (2011).
    • (2011) J. Hydroelectr. Eng. , vol.30 , Issue.3 , pp. 5-9
    • Biao, S.1    Xia, L.Y.2    Hua, Y.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.