-
1
-
-
84871784659
-
The south Asiatic monsoon and flood hazards in the Indus river basin, Pakistan
-
Akthar S. 2011. The south Asiatic monsoon and flood hazards in the Indus river basin, Pakistan. J. Basic Appl. Sci. 7: 101-115.
-
(2011)
J. Basic Appl. Sci.
, vol.7
, pp. 101-115
-
-
Akthar, S.1
-
2
-
-
70349363371
-
GSMaP passive, microwave precipitation retrieval algorithm: Algorithm description and validation
-
87A: -.
-
Aonashi K, Awaka J, Hirose M, Kozu T, Kubota T, Liu G, Shige S, Kida S, Seto S, Takahashi N, Takayabu YN. 2009. GSMaP passive, microwave precipitation retrieval algorithm: Algorithm description and validation. J. Meteor. Soc. Japan 87A: 119-136.
-
(2009)
J. Meteor. Soc. Japan
, pp. 119-136
-
-
Aonashi, K.1
Awaka, J.2
Hirose, M.3
Kozu, T.4
Kubota, T.5
Liu, G.6
Shige, S.7
Kida, S.8
Seto, S.9
Takahashi, N.10
Takayabu, Y.N.11
-
3
-
-
79953814612
-
The hot summer of 2010: redrawing the temperature record map of Europe
-
Barriopedro D, Fischer EM, Luterbacher J, Trigo RM, García-Herrera R. 2011. The hot summer of 2010: redrawing the temperature record map of Europe. Science 332: 220-224.
-
(2011)
Science
, vol.332
, pp. 220-224
-
-
Barriopedro, D.1
Fischer, E.M.2
Luterbacher, J.3
Trigo, R.M.4
García-Herrera, R.5
-
4
-
-
77955580034
-
The THORPEX Interactive Grand Global Ensemble
-
Bougeault P, Toth Z, Bishop C, Brown B, Burridge D, Chen DH, Ebert B, Fuentes M, Hamill TM, Mylne K, Nicolau J, Paccagnella T, Park YY, Parsons D, Raoult B, Schuster D, Dias PS, Swinbank R, Takeuchi Y, Tennant W, Wilson L, Worley S. 2010. The THORPEX Interactive Grand Global Ensemble. Bull. Am. Meteorol. Soc. 91: 1059-1072.
-
(2010)
Bull. Am. Meteorol. Soc.
, vol.91
, pp. 1059-1072
-
-
Bougeault, P.1
Toth, Z.2
Bishop, C.3
Brown, B.4
Burridge, D.5
Chen, D.H.6
Ebert, B.7
Fuentes, M.8
Hamill, T.M.9
Mylne, K.10
Nicolau, J.11
Paccagnella, T.12
Park, Y.Y.13
Parsons, D.14
Raoult, B.15
Schuster, D.16
Dias, P.S.17
Swinbank, R.18
Takeuchi, Y.19
Tennant, W.20
Wilson, L.21
Worley, S.22
more..
-
5
-
-
42549149903
-
The MOGREPS short-range ensemble prediction system
-
Bowler NE, Arribas A, Mylne KR, Robertson KB, Beare SE. 2008. The MOGREPS short-range ensemble prediction system. Q. J. R. Meteorol. Soc. 134: 703-722.
-
(2008)
Q. J. R. Meteorol. Soc.
, vol.134
, pp. 703-722
-
-
Bowler, N.E.1
Arribas, A.2
Mylne, K.R.3
Robertson, K.B.4
Beare, S.E.5
-
6
-
-
34250010344
-
The new ECMWF VAREPS (Variable Resolution Ensemble Prediction System)
-
Buizza R, Bidlot JR, Wedi N, Fuentes M, Hamrud M, Holt G, Vitart F. 2007. The new ECMWF VAREPS (Variable Resolution Ensemble Prediction System). Q. J. Roy. Meteorol. Soc. 133: 681-695.
-
(2007)
Q. J. Roy. Meteorol. Soc.
, vol.133
, pp. 681-695
-
-
Buizza, R.1
Bidlot, J.R.2
Wedi, N.3
Fuentes, M.4
Hamrud, M.5
Holt, G.6
Vitart, F.7
-
7
-
-
77955575342
-
Toward random sampling of model error in the Canadian ensemble prediction system
-
Charron M, Pellerin G, Spacek L, Houtekamer PL, Gagnon N, Mitchell HL, Michelin L. 2010. Toward random sampling of model error in the Canadian ensemble prediction system. Mon. Weather Rev. 138: 1877-1901.
-
(2010)
Mon. Weather Rev.
, vol.138
, pp. 1877-1901
-
-
Charron, M.1
Pellerin, G.2
Spacek, L.3
Houtekamer, P.L.4
Gagnon, N.5
Mitchell, H.L.6
Michelin, L.7
-
9
-
-
79955446270
-
The ERA-interim reanalysis: configuration and performance of the data assimilation system
-
Dee DP, Uppala SM, Simmons AJ, Berrisford P, Poli P, Kobayashi S, Andrae U, Balmaseda MA, Balsamo G, Bauer P, Bechtold P, Beljaars ACM, van de Berg L, Bidlot J, Bormann N, Delsol C, Dragani R, Fuentes M, Geer AJ, Haimberger L, Healy SB, Hersbach H, Hólm EV, Isaksen L, Kållberg P, Köhler M, Matricardi M, McNally AP, Monge-Sanz BM, Morcrette JJ, Park BK, Peubey C, de Rosnay P, Tavolato C, Thépaut JN, Vitart F. 2011. The ERA-interim reanalysis: configuration and performance of the data assimilation system. Q. J. R. Meteorol. Soc. 137: 553-597.
-
(2011)
Q. J. R. Meteorol. Soc.
, vol.137
, pp. 553-597
-
-
Dee, D.P.1
Uppala, S.M.2
Simmons, A.J.3
Berrisford, P.4
Poli, P.5
Kobayashi, S.6
Andrae, U.7
Balmaseda, M.A.8
Balsamo, G.9
Bauer, P.10
Bechtold, P.11
Beljaars, A.C.M.12
van de Berg, L.13
Bidlot, J.14
Bormann, N.15
Delsol, C.16
Dragani, R.17
Fuentes, M.18
Geer, A.J.19
Haimberger, L.20
Healy, S.B.21
Hersbach, H.22
Hólm, E.V.23
Isaksen, L.24
Kållberg, P.25
Köhler, M.26
Matricardi, M.27
McNally, A.P.28
Monge-Sanz, B.M.29
Morcrette, J.J.30
Park, B.K.31
Peubey, C.32
de Rosnay, P.33
Tavolato, C.34
Thépaut, J.N.35
Vitart, F.36
more..
-
11
-
-
77955570957
-
TIGGE: comparison of the prediction of Northern Hemisphere extratropical cyclones by different ensemble prediction systems
-
Froude LSR. 2010. TIGGE: comparison of the prediction of Northern Hemisphere extratropical cyclones by different ensemble prediction systems. Weather Forecasting 25: 819-836.
-
(2010)
Weather Forecasting
, vol.25
, pp. 819-836
-
-
Froude, L.S.R.1
-
12
-
-
79959720711
-
TIGGE: comparison of the prediction of Southern Hemisphere extratropical cyclones by different ensemble prediction systems
-
Froude LSR. 2011. TIGGE: comparison of the prediction of Southern Hemisphere extratropical cyclones by different ensemble prediction systems. Weather Forecasting. 26: 388-398.
-
(2011)
Weather Forecasting.
, vol.26
, pp. 388-398
-
-
Froude, L.S.R.1
-
13
-
-
84864950358
-
A multiscale analysis of the extreme weather events over Western Russia and Northern Pakistan during July 2010
-
Galarneau TJ, Hamill TM, Dole RM, Perlwitz J. 2012. A multiscale analysis of the extreme weather events over Western Russia and Northern Pakistan during July 2010. Mon. Weather Rev. 140: 1639-1664.
-
(2012)
Mon. Weather Rev.
, vol.140
, pp. 1639-1664
-
-
Galarneau, T.J.1
Hamill, T.M.2
Dole, R.M.3
Perlwitz, J.4
-
14
-
-
79953179457
-
Russia counts environmental cost of wildfires
-
Gilbert N. 2010. Russia counts environmental cost of wildfires. Nat. News, DOI: 10.1038/news.2010.404.
-
(2010)
Nat. News
-
-
Gilbert, N.1
-
15
-
-
84864847014
-
Comparing TIGGE multimodel forecasts with reforecast-calibrated ECMWF ensemble forecasts
-
Hagedorn R, Buizza R, Hamill TM, Leutbecher M, Palmer TN. 2012. Comparing TIGGE multimodel forecasts with reforecast-calibrated ECMWF ensemble forecasts. Q. J. R. Meteorol. Soc. 138: 1814-1827.
-
(2012)
Q. J. R. Meteorol. Soc.
, vol.138
, pp. 1814-1827
-
-
Hagedorn, R.1
Buizza, R.2
Hamill, T.M.3
Leutbecher, M.4
Palmer, T.N.5
-
16
-
-
84864843500
-
Verification of TIGGE Multimodel and ECMWF reforecast-calibrated probabilistic precipitation forecasts over the contiguous United States
-
Hamill TM. 2012. Verification of TIGGE Multimodel and ECMWF reforecast-calibrated probabilistic precipitation forecasts over the contiguous United States. Mon. Weather Rev. 140: 2232-2252.
-
(2012)
Mon. Weather Rev.
, vol.140
, pp. 2232-2252
-
-
Hamill, T.M.1
-
17
-
-
84887565416
-
NOAA's second-generation global medium-range ensemble reforecast data set
-
Hamill TM, Bates GT, Whitaker JS, Murray DR, Fiorino M, Galarneau TJ Jr, Zhu Y, Lapenta W. 2013. NOAA's second-generation global medium-range ensemble reforecast data set. Bull. Am. Meteorol. Soc., DOI: 10.1175/BAMS-D-12-00014.1.
-
(2013)
Bull. Am. Meteorol. Soc.
-
-
Hamill, T.M.1
Bates, G.T.2
Whitaker, J.S.3
Murray, D.R.4
Fiorino, M.5
Galarneau Jr, T.J.6
Zhu, Y.7
Lapenta, W.8
-
18
-
-
79960233490
-
Roles of European blocking and tropical-extratropical interaction in the 2010 Pakistan flooding
-
Hong CC, Hsu HH, Lin NH, Chiu H. 2011. Roles of European blocking and tropical-extratropical interaction in the 2010 Pakistan flooding. Geophys. Res. Lett. 38: L13806, DOI: 10.1029/2011GL047583.
-
(2011)
Geophys. Res. Lett.
, vol.38
, pp. L13806
-
-
Hong, C.C.1
Hsu, H.H.2
Lin, N.H.3
Chiu, H.4
-
21
-
-
69549108852
-
Medium-range multi-model ensemble combination and calibration
-
Johnson C, Swinbank R. 2009. Medium-range multi-model ensemble combination and calibration. Q. J. R. Meteorol. Soc. 135: 777-794.
-
(2009)
Q. J. R. Meteorol. Soc.
, vol.135
, pp. 777-794
-
-
Johnson, C.1
Swinbank, R.2
-
22
-
-
84863338044
-
The 2010 Pakistan Flood and Russian Heat Wave: teleconnection of hydrometeorological extremes
-
Lau WKM, Kim KM. 2012. The 2010 Pakistan Flood and Russian Heat Wave: teleconnection of hydrometeorological extremes. J. Hydrometeor. 13: 392-403.
-
(2012)
J. Hydrometeor.
, vol.13
, pp. 392-403
-
-
Lau, W.K.M.1
Kim, K.M.2
-
23
-
-
84886243921
-
The role of upper-level dynamics and surface processes for the Pakistan flood of July 2010
-
Martius O, Sodemann H, Joos H, Pfahl S, Winschall A, Croci-Maspoli M, Graf M, Madonna E, Mueller B, Schemm S, Sedláček J, Sprenger M, Wernli H. 2012. The role of upper-level dynamics and surface processes for the Pakistan flood of July 2010. Q. J. R. Meteorol. Soc., DOI: 10.1002/qj.2082.
-
(2012)
Q. J. R. Meteorol. Soc.
-
-
Martius, O.1
Sodemann, H.2
Joos, H.3
Pfahl, S.4
Winschall, A.5
Croci-Maspoli, M.6
Graf, M.7
Madonna, E.8
Mueller, B.9
Schemm, S.10
Sedláček, J.11
Sprenger, M.12
Wernli, H.13
-
24
-
-
79953218851
-
Blocking predictability in operational medium-range ensemble forecasts
-
Matsueda M. 2009. Blocking predictability in operational medium-range ensemble forecasts. SOLA 5: 113-116.
-
(2009)
SOLA
, vol.5
, pp. 113-116
-
-
Matsueda, M.1
-
25
-
-
79953175251
-
Predictability of Euro-Russian blocking in summer of 2010
-
Matsueda M. 2011. Predictability of Euro-Russian blocking in summer of 2010. Geophys. Res. Lett. 38: L06801, DOI: 10.1029/2010GL046557.
-
(2011)
Geophys. Res. Lett.
, vol.38
, pp. L06801
-
-
Matsueda, M.1
-
26
-
-
79957931906
-
Verification of medium-range MJO forecasts with TIGGE
-
Matsueda M, Endo H. 2011. Verification of medium-range MJO forecasts with TIGGE. Geophys. Res. Lett. 38: L11801, DOI: 10.1029/2011GL047480.
-
(2011)
Geophys. Res. Lett.
, vol.38
, pp. L11801
-
-
Matsueda, M.1
Endo, H.2
-
27
-
-
77955579598
-
Can MCGE outperform the ECMWF ensemble?
-
Matsueda M, Tanaka HL. 2008. Can MCGE outperform the ECMWF ensemble? SOLA 4: 77-80.
-
(2008)
SOLA
, vol.4
, pp. 77-80
-
-
Matsueda, M.1
Tanaka, H.L.2
-
28
-
-
79957933624
-
Predictability of an atmospheric blocking event that occurred on 15 December 2005
-
Matsueda M, Kyouda M, Toth Z, Tanaka HL, Tsuyuki T. 2011. Predictability of an atmospheric blocking event that occurred on 15 December 2005. Mon. Weather Rev. 139: 2455-2470.
-
(2011)
Mon. Weather Rev.
, vol.139
, pp. 2455-2470
-
-
Matsueda, M.1
Kyouda, M.2
Toth, Z.3
Tanaka, H.L.4
Tsuyuki, T.5
-
29
-
-
0000918735
-
A new vector partition of the probabilistic score
-
Murphy AH. 1973. A new vector partition of the probabilistic score. J. Appl. Meteorol. 12: 595-600.
-
(1973)
J. Appl. Meteorol.
, vol.12
, pp. 595-600
-
-
Murphy, A.H.1
-
30
-
-
58049132648
-
New dimensions in early flood warning across the globe using grand-ensemble weather predictions
-
Pappenberger F, Bartholmes J, Thielen J, Cloke HL, Buizza R, de Roo A. 2008. New dimensions in early flood warning across the globe using grand-ensemble weather predictions. Geophys. Res. Lett. 35: L10404, DOI: 10.1029/2008GL033837.
-
(2008)
Geophys. Res. Lett.
, vol.35
, pp. L10404
-
-
Pappenberger, F.1
Bartholmes, J.2
Thielen, J.3
Cloke, H.L.4
Buizza, R.5
de Roo, A.6
-
31
-
-
58049196895
-
TIGGE: preliminary results on comparing and combining ensembles
-
Park YY, Buizza R, Leutbecher M. 2008. TIGGE: preliminary results on comparing and combining ensembles. Q. J. R. Meteorol. Soc. 134: 2029-2050.
-
(2008)
Q. J. R. Meteorol. Soc.
, vol.134
, pp. 2029-2050
-
-
Park, Y.Y.1
Buizza, R.2
Leutbecher, M.3
-
33
-
-
84928585526
-
-
'THORPEX.' WMO-No. 978, Geneva.
-
WMO. 2005. 'THORPEX.' WMO-No. 978, Geneva.
-
(2005)
-
-
-
34
-
-
85027950954
-
On the relative benefits of a multi-centre grand ensemble for tropical cyclone track prediction in the western North Pacific
-
Yamaguchi M, Nakazawa T, Hoshino S. 2012. On the relative benefits of a multi-centre grand ensemble for tropical cyclone track prediction in the western North Pacific. Q. J. R. Meteorol. Soc. 138: 2019-2029.
-
(2012)
Q. J. R. Meteorol. Soc.
, vol.138
, pp. 2019-2029
-
-
Yamaguchi, M.1
Nakazawa, T.2
Hoshino, S.3
|