메뉴 건너뛰기




Volumn 85, Issue , 2015, Pages 206-215

Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment

Author keywords

Fuzzy environment; Job deterioration; Learning effect; Multi objective branch and bound; Parallel machine scheduling

Indexed keywords

ALGORITHMS; BRANCH AND BOUND METHOD; BUSINESS MACHINES; COMPUTER PROGRAMMING; DETERIORATION; FUNCTIONS; FUZZY SETS; JOB SHOP SCHEDULING; MACHINERY; PARETO PRINCIPLE; PROBLEM SOLVING; SCHEDULING ALGORITHMS;

EID: 84927136298     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2015.03.022     Document Type: Article
Times cited : (43)

References (35)
  • 1
    • 79955062127 scopus 로고    scopus 로고
    • A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity
    • T. Al-Khamis, and R. M'Hallah A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity Computers & Operations Research 38 2011 1747 1759
    • (2011) Computers & Operations Research , vol.38 , pp. 1747-1759
    • Al-Khamis, T.1    M'Hallah, R.2
  • 4
    • 84859210627 scopus 로고    scopus 로고
    • Sequence-dependent group scheduling problem on unrelated-parallel machines
    • M.A. Bozorgirad, and R. Logendran Sequence-dependent group scheduling problem on unrelated-parallel machines Expert Systems with Applications 39 2012 9021 9030
    • (2012) Expert Systems with Applications , vol.39 , pp. 9021-9030
    • Bozorgirad, M.A.1    Logendran, R.2
  • 5
    • 79952619013 scopus 로고    scopus 로고
    • Unrelated parallel-machine scheduling with deteriorating maintenance activities
    • T.E. Cheng, C.-J. Hsu, and D.-L. Yang Unrelated parallel-machine scheduling with deteriorating maintenance activities Computers & Industrial Engineering 60 2011 602 605
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 602-605
    • Cheng, T.E.1    Hsu, C.-J.2    Yang, D.-L.3
  • 6
    • 84863465903 scopus 로고    scopus 로고
    • Scheduling on parallel identical machines with job-rejection and position-dependent processing times
    • E. Gerstl, and G. Mosheiov Scheduling on parallel identical machines with job-rejection and position-dependent processing times Information Processing Letters 112 2012 743 747
    • (2012) Information Processing Letters , vol.112 , pp. 743-747
    • Gerstl, E.1    Mosheiov, G.2
  • 7
    • 63449108993 scopus 로고    scopus 로고
    • A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
    • A.H. Gharehgozli, R. Tavakkoli-Moghaddam, and N. Zaerpour A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates Robotics and Computer-Integrated Manufacturing 25 2009 853 859
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , pp. 853-859
    • Gharehgozli, A.H.1    Tavakkoli-Moghaddam, R.2    Zaerpour, N.3
  • 9
    • 38149101038 scopus 로고    scopus 로고
    • Parallel-machine scheduling with simple linear deterioration to minimize total completion time
    • M. Ji, and T.C.E. Cheng Parallel-machine scheduling with simple linear deterioration to minimize total completion time European Journal of Operational Research 188 2008 342 347
    • (2008) European Journal of Operational Research , vol.188 , pp. 342-347
    • Ji, M.1    Cheng, T.C.E.2
  • 10
    • 68249107269 scopus 로고    scopus 로고
    • Parallel-machine scheduling of simple linear deteriorating jobs
    • M. Ji, and T.E. Cheng Parallel-machine scheduling of simple linear deteriorating jobs Theoretical Computer Science 410 2009 3761 3768
    • (2009) Theoretical Computer Science , vol.410 , pp. 3761-3768
    • Ji, M.1    Cheng, T.E.2
  • 13
    • 84868194146 scopus 로고    scopus 로고
    • Uniform parallel-machine scheduling to minimize makespan with position-based learning curves
    • W.-C. Lee, M.-C. Chuang, and W.-C. Yeh Uniform parallel-machine scheduling to minimize makespan with position-based learning curves Computers & Industrial Engineering 63 2012 813 818
    • (2012) Computers & Industrial Engineering , vol.63 , pp. 813-818
    • Lee, W.-C.1    Chuang, M.-C.2    Yeh, W.-C.3
  • 14
    • 34548502246 scopus 로고    scopus 로고
    • Parallel machine scheduling with machine availability and eligibility constraints
    • L.W. Liao, and G.J. Sheen Parallel machine scheduling with machine availability and eligibility constraints European Journal of Operation Research 184 2008 458 467
    • (2008) European Journal of Operation Research , vol.184 , pp. 458-467
    • Liao, L.W.1    Sheen, G.J.2
  • 15
    • 84885955994 scopus 로고    scopus 로고
    • Parallel-machine scheduling with past-sequence-dependent delivery times and learning effect
    • M. Liu Parallel-machine scheduling with past-sequence-dependent delivery times and learning effect Applied Mathematical Modelling 37 2013 9630 9633
    • (2013) Applied Mathematical Modelling , vol.37 , pp. 9630-9633
    • Liu, M.1
  • 16
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • B. Liu, and Y.-K. Liu Expected value of fuzzy variable and fuzzy expected value models IEEE Transactions on Fuzzy Systems 10 2002 445 450
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , pp. 445-450
    • Liu, B.1    Liu, Y.-K.2
  • 17
    • 84881166353 scopus 로고    scopus 로고
    • Approximation algorithms for parallel machine scheduling with linear deterioration
    • M. Liu, F. Zheng, S. Wang, and Y. Xu Approximation algorithms for parallel machine scheduling with linear deterioration Theoretical Computer Science 497 2013 108 111
    • (2013) Theoretical Computer Science , vol.497 , pp. 108-111
    • Liu, M.1    Zheng, F.2    Wang, S.3    Xu, Y.4
  • 18
    • 75449111796 scopus 로고    scopus 로고
    • Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
    • M.M. Mazdeh, F. Zaerpour, A. Zareei, and A. Hajinezhad Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs Applied Mathematical Modelling 34 2010 1498 1510
    • (2010) Applied Mathematical Modelling , vol.34 , pp. 1498-1510
    • Mazdeh, M.M.1    Zaerpour, F.2    Zareei, A.3    Hajinezhad, A.4
  • 20
    • 4944222768 scopus 로고    scopus 로고
    • Parallel machine scheduling models with fuzzy processing times
    • J. Peng, and B. Liu Parallel machine scheduling models with fuzzy processing times Information Sciences 166 2004 49 66
    • (2004) Information Sciences , vol.166 , pp. 49-66
    • Peng, J.1    Liu, B.2
  • 22
    • 84880571440 scopus 로고    scopus 로고
    • New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria
    • D. Prot, O. Bellenguez-Morineau, and C. Lahlou New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria European Journal of Operational Research 231 2013 282 287
    • (2013) European Journal of Operational Research , vol.231 , pp. 282-287
    • Prot, D.1    Bellenguez-Morineau, O.2    Lahlou, C.3
  • 23
    • 84875943901 scopus 로고    scopus 로고
    • An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem
    • F.J. Rodriguez, M. Lozano, C. Blum, and C. GarcI'a-MartI'nez An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem Computers & Operations Research 40 2013 1829 1841
    • (2013) Computers & Operations Research , vol.40 , pp. 1829-1841
    • Rodriguez, F.J.1    Lozano, M.2    Blum, C.3    Garci'A-Marti'Nez, C.4
  • 24
    • 84876178172 scopus 로고    scopus 로고
    • Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects
    • A.J. Ruiz-Torres, G. Paletta, and E. Pe'rez Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects Computers & Operations Research 40 2013 2051 2061
    • (2013) Computers & Operations Research , vol.40 , pp. 2051-2061
    • Ruiz-Torres, A.J.1    Paletta, G.2    Pe'Rez, E.3
  • 25
    • 79955087599 scopus 로고    scopus 로고
    • Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness
    • I. SarIçiçek, and C. Çelik Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness Applied Mathematical Modelling 35 2011 4117 4126
    • (2011) Applied Mathematical Modelling , vol.35 , pp. 4117-4126
    • Sariçiçek, I.1    Çelik, C.2
  • 26
    • 84872600678 scopus 로고    scopus 로고
    • Parallel-machine scheduling with non-simultaneous machine available time
    • L. Shen, D. Wang, and X.-Y. Wang Parallel-machine scheduling with non-simultaneous machine available time Applied Mathematical Modelling 37 2013 5227 5232
    • (2013) Applied Mathematical Modelling , vol.37 , pp. 5227-5232
    • Shen, L.1    Wang, D.2    Wang, X.-Y.3
  • 27
    • 58549092975 scopus 로고    scopus 로고
    • Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration
    • M.D. Toksari, and E. Güner Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration Computers & Operations Research 36 2009 2394 2417
    • (2009) Computers & Operations Research , vol.36 , pp. 2394-2417
    • Toksari M.D.Uner E, G.1
  • 28
    • 77950593573 scopus 로고    scopus 로고
    • Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems
    • Y. Unlu, and S.J. Mason Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems Computers & Industrial Engineering 58 2010 785 800
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 785-800
    • Unlu, Y.1    Mason, S.J.2
  • 29
    • 79952187971 scopus 로고    scopus 로고
    • A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
    • E. Vallada, and R. Ruiz A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times European Journal of Operational Research 211 2011 612 622
    • (2011) European Journal of Operational Research , vol.211 , pp. 612-622
    • Vallada, E.1    Ruiz, R.2
  • 30
    • 84901942137 scopus 로고    scopus 로고
    • Parallel machines scheduling with simple linear job deterioration and non-simultaneous machine available times
    • X.-Y. Wang, Z. Zhou, P. Ji, and J.-B. Wang Parallel machines scheduling with simple linear job deterioration and non-simultaneous machine available times Computers & Industrial Engineering 74 2014 88 91
    • (2014) Computers & Industrial Engineering , vol.74 , pp. 88-91
    • Wang, X.-Y.1    Zhou, Z.2    Ji, P.3    Wang, J.-B.4
  • 31
    • 84875949933 scopus 로고    scopus 로고
    • Unrelated parallel-machine scheduling problems with multiple rate-modifying activities
    • D.-L. Yang, and S.-J. Yang Unrelated parallel-machine scheduling problems with multiple rate-modifying activities Information Sciences 235 2013 280 286
    • (2013) Information Sciences , vol.235 , pp. 280-286
    • Yang, D.-L.1    Yang, S.-J.2
  • 32
    • 84927142084 scopus 로고    scopus 로고
    • Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
    • W.-C. Yeh, P.-J. Lai, W.-C. Lee, and M.-C. Chuang Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects Information Sciences 2013
    • (2013) Information Sciences
    • Yeh, W.-C.1    Lai, P.-J.2    Lee, W.-C.3    Chuang, M.-C.4
  • 34
    • 84884852675 scopus 로고    scopus 로고
    • Parallel-machine scheduling with deteriorating jobs, rejection and a fixed non-availability interval
    • M. Zhang, and C. Luo Parallel-machine scheduling with deteriorating jobs, rejection and a fixed non-availability interval Applied Mathematics and Computation 224 2013 405 411
    • (2013) Applied Mathematics and Computation , vol.224 , pp. 405-411
    • Zhang, M.1    Luo, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.