메뉴 건너뛰기




Volumn 85, Issue , 2015, Pages 196-205

Lot sizing and job shop scheduling with compressible process times: A cut and branch approach

Author keywords

Cutting planes; Job shop; Lot sizing; Process compressibility; Scheduling

Indexed keywords

INTEGER PROGRAMMING; OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 84927128098     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2015.03.020     Document Type: Article
Times cited : (26)

References (20)
  • 1
    • 0022234268 scopus 로고
    • Simultaneous lot sizing and sequencing for multistage production systems
    • P. Afentakis Simultaneous lot sizing and sequencing for multistage production systems IIE Transactions 17 1985 327 331
    • (1985) IIE Transactions , vol.17 , pp. 327-331
    • Afentakis, P.1
  • 3
  • 4
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
    • B. Franck, K. Neumann, and C. Schwindt A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods OR Spektrum 19 1997 77 85
    • (1997) OR Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 5
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • M.G. Ierapetritou, and C.A. Floudas Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes Industrial Engineering and Chemical Research 37 1998 4360 4374
    • (1998) Industrial Engineering and Chemical Research , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • B. Karimi, S.M.T. Fatemi Ghomi, and J.M. Wilson The capacitated lot sizing problem: A review of models and algorithms Omega 31 2003 365 378
    • (2003) Omega , vol.31 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 8
    • 79953222174 scopus 로고    scopus 로고
    • A multi-objective production smoothing model with compressible operating times
    • M. Karimi-Nasab, and M.B. Aryanezhad A multi-objective production smoothing model with compressible operating times Applied Mathematical Modelling 35 2011 3596 3610
    • (2011) Applied Mathematical Modelling , vol.35 , pp. 3596-3610
    • Karimi-Nasab, M.1    Aryanezhad, M.B.2
  • 9
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • J.U. Kim, and Y.D. Kim Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Computers & Operations Research 23 1996 857 868
    • (1996) Computers & Operations Research , vol.23 , pp. 857-868
    • Kim, J.U.1    Kim, Y.D.2
  • 11
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • C.T. Maravelias, and C. Sung Integration of production planning and scheduling: Overview, challenges and opportunities Computers and Chemical Engineering 33 2009 1919 1930
    • (2009) Computers and Chemical Engineering , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 12
    • 0036507655 scopus 로고    scopus 로고
    • Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons
    • L.K. Nozick, M.A. Turnquist, C.R. Lawton, G.F. List, D.A. Jones, and S.T. Wright Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons Production Planning & Control 13 2002 187 198
    • (2002) Production Planning & Control , vol.13 , pp. 187-198
    • Nozick, L.K.1    Turnquist, M.A.2    Lawton, C.R.3    List, G.F.4    Jones, D.A.5    Wright, S.T.6
  • 13
    • 0035546154 scopus 로고    scopus 로고
    • The finite horizon economic lot sizing problem in job shops: The multiple cycle approach
    • J. Ouenniche, and J.W.M. Bertrand The finite horizon economic lot sizing problem in job shops: The multiple cycle approach International Journal of Production Economics 74 2001 49 61
    • (2001) International Journal of Production Economics , vol.74 , pp. 49-61
    • Ouenniche, J.1    Bertrand, J.W.M.2
  • 14
    • 72049116023 scopus 로고    scopus 로고
    • Capacitated lot sizing with linked lots for general product structures in job shops
    • C. Oztürk, and A.M. Ornek Capacitated lot sizing with linked lots for general product structures in job shops Computers & Industrial Engineering 58 2010 151 164
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 151-164
    • Oztürk, C.1    Ornek, A.M.2
  • 16
    • 84974861854 scopus 로고
    • Integrated scheduling with batching and lot sizing: A review of algorithms and complexity
    • C.N. Potts, and L.N. van Wassenhove Integrated scheduling with batching and lot sizing: A review of algorithms and complexity The Journal of the Operational Research Society 43 1992 395 406
    • (1992) The Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 17
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • C. Schwindt, and N. Trautmann Batch scheduling in process industries: An application of resource-constrained project scheduling OR Spektrum 22 2000 501 524
    • (2000) OR Spektrum , vol.22 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 19
    • 69649103114 scopus 로고    scopus 로고
    • A resource-constrained assembly job shop scheduling problem with lot streaming technique
    • T.C. Wong, F.T.S. Chan, and L.Y. Chan A resource-constrained assembly job shop scheduling problem with lot streaming technique Computers & Industrial Engineering 57 2009 983 995
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 983-995
    • Wong, T.C.1    Chan, F.T.S.2    Chan, L.Y.3
  • 20
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • X. Zhu, and W.E. Wilhelm Scheduling and lot sizing with sequence-dependent setup: A literature review IIE Transactions 38 2006 987 1007
    • (2006) IIE Transactions , vol.38 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.