-
1
-
-
78650284666
-
Decision support system for optimizing reservoir operations using ensemble streamflow predictions
-
Alemu ET, Palmer RN, Polebitski A, Meaker B (2011) Decision support system for optimizing reservoir operations using ensemble streamflow predictions. J Water Resour Plan Manage 137:72–82
-
(2011)
J Water Resour Plan Manage
, vol.137
, pp. 72-82
-
-
Alemu, E.T.1
Palmer, R.N.2
Polebitski, A.3
Meaker, B.4
-
2
-
-
33645841331
-
A probabilistic modeling system for assessing flood risks
-
Apel H, Thieken AH, Merz B, Blöschl G (2006) A probabilistic modeling system for assessing flood risks. Nat Hazards 38(1–2):79–100
-
(2006)
Nat Hazards
, vol.38
, Issue.1-2
, pp. 79-100
-
-
Apel, H.1
Thieken, A.H.2
Merz, B.3
Blöschl, G.4
-
3
-
-
0027009437
-
The future of distributed models: model calibration and uncertainty prediction
-
Beven K, Binley A (1992) The future of distributed models: model calibration and uncertainty prediction. Hydrol Process 6:279–298
-
(1992)
Hydrol Process
, vol.6
, pp. 279-298
-
-
Beven, K.1
Binley, A.2
-
4
-
-
69349101904
-
Ensemble flood forecasting: a review
-
Cloke HL, Pappenberger F (2009) Ensemble flood forecasting: a review. J Hydrol 375(3–4):613–626
-
(2009)
J Hydrol
, vol.375
, Issue.3-4
, pp. 613-626
-
-
Cloke, H.L.1
Pappenberger, F.2
-
5
-
-
0021640840
-
A stochastic optimization model for real–time operation of reservoirs using uncertain forecasts
-
Datta B, Houck MH (1984) A stochastic optimization model for real–time operation of reservoirs using uncertain forecasts. Water Resour Res 20(8):1039–1046
-
(1984)
Water Resour Res
, vol.20
, Issue.8
, pp. 1039-1046
-
-
Datta, B.1
Houck, M.H.2
-
6
-
-
0002032211
-
Scenario optimization
-
Dembo RS (1991) Scenario optimization. Ann Oper Res 30(1):63–80
-
(1991)
Ann Oper Res
, vol.30
, Issue.1
, pp. 63-80
-
-
Dembo, R.S.1
-
7
-
-
0035425838
-
Reservoir optimization using sampling SDP with ensemble streamflow prediction (ESP) forecasts
-
Faber BA, Stedinger JR (2001) Reservoir optimization using sampling SDP with ensemble streamflow prediction (ESP) forecasts. J Hydrol 249(1–4):113–133
-
(2001)
J Hydrol
, vol.249
, Issue.1-4
, pp. 113-133
-
-
Faber, B.A.1
Stedinger, J.R.2
-
8
-
-
10244229638
-
Reservoir flood forecasting and control system in China
-
Guo SL, Zhang HG, Chen H, Peng DZ, Liu P, Pang B (2004) Reservoir flood forecasting and control system in China. Hydrol Sci J 49(6):959–972
-
(2004)
Hydrol Sci J
, vol.49
, Issue.6
, pp. 959-972
-
-
Guo, S.L.1
Zhang, H.G.2
Chen, H.3
Peng, D.Z.4
Liu, P.5
Pang, B.6
-
9
-
-
0038563932
-
An adaptive Metropolis algorithm
-
Haario H, Saksman E, Tamminen J (2001) An adaptive Metropolis algorithm. Bernoulli 7(2):223–242
-
(2001)
Bernoulli
, vol.7
, Issue.2
, pp. 223-242
-
-
Haario, H.1
Saksman, E.2
Tamminen, J.3
-
10
-
-
0024453279
-
The determination of flood control volumes in a multireservoir system
-
Kelman J, Damazio JM, Marien JL, Da Costa JP (1989) The determination of flood control volumes in a multireservoir system. Water Resour Res 25(3):337–344
-
(1989)
Water Resour Res
, vol.25
, Issue.3
, pp. 337-344
-
-
Kelman, J.1
Damazio, J.M.2
Marien, J.L.3
Da Costa, J.P.4
-
11
-
-
0025198209
-
Sampling stochastic dynamic programming applied to reservoir operation
-
Kelman J, Stedinger JR, Cooper LA, Hsu E, Yuan S (1990) Sampling stochastic dynamic programming applied to reservoir operation. Water Resour Res 26(3):447–454
-
(1990)
Water Resour Res
, vol.26
, Issue.3
, pp. 447-454
-
-
Kelman, J.1
Stedinger, J.R.2
Cooper, L.A.3
Hsu, E.4
Yuan, S.5
-
12
-
-
34547138953
-
Risk analysis for dam overtopping–Feitsui reservoir as a case study
-
Kuo JT, Yen BC, Hsu YC, Lin HF (2007) Risk analysis for dam overtopping–Feitsui reservoir as a case study. J Hydraul Eng 133(8):955–963
-
(2007)
J Hydraul Eng
, vol.133
, Issue.8
, pp. 955-963
-
-
Kuo, J.T.1
Yen, B.C.2
Hsu, Y.C.3
Lin, H.F.4
-
13
-
-
1842686887
-
Optimal operation of multi–reservoir systems: state-of-the-art review
-
Labadie J (2004) Optimal operation of multi–reservoir systems: state-of-the-art review. J Water Resour Plan Manage 130(2):93–111
-
(2004)
J Water Resour Plan Manage
, vol.130
, Issue.2
, pp. 93-111
-
-
Labadie, J.1
-
14
-
-
77956191833
-
Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty
-
Li X, Guo SL, Liu P, Chen GY (2010) Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. J Hydrol 391(1–2):124–132
-
(2010)
J Hydrol
, vol.391
, Issue.1-2
, pp. 124-132
-
-
Li, X.1
Guo, S.L.2
Liu, P.3
Chen, G.Y.4
-
15
-
-
0026613412
-
River flow forecasting. Part 4. Applications of linear modelling techniques for flow routing on large catchments
-
Liang GC, Kachroo RK, Kang W, Yu XZ (1992) River flow forecasting. Part 4. Applications of linear modelling techniques for flow routing on large catchments. J Hydrol 133(1–2):99–140
-
(1992)
J Hydrol
, vol.133
, Issue.1-2
, pp. 99-140
-
-
Liang, G.C.1
Kachroo, R.K.2
Kang, W.3
Yu, X.Z.4
-
16
-
-
84897538527
-
Multi-site evaluation to reduce parameter uncertainty in a conceptual hydrological modeling within the GLUE framework
-
Lin K, Liu P, He Y, Guo S (2014) Multi-site evaluation to reduce parameter uncertainty in a conceptual hydrological modeling within the GLUE framework. J Hydroinformatics 16(1):60–73
-
(2014)
J Hydroinformatics
, vol.16
, Issue.1
, pp. 60-73
-
-
Lin, K.1
Liu, P.2
He, Y.3
Guo, S.4
-
17
-
-
36648998731
-
Uncertainty in hydrologic modeling: toward an integrated data assimilation framework
-
Liu Y, Gupta HV (2007) Uncertainty in hydrologic modeling: toward an integrated data assimilation framework. Water Resour Res 43:W07401. doi:10.1029/2006WR005756
-
(2007)
Water Resour Res
, vol.43
, pp. W07401
-
-
Liu, Y.1
Gupta, H.V.2
-
18
-
-
80051698341
-
Deriving multiple near–optimal solutions to deterministic reservoir operation problems
-
Liu P, Cai XM, Guo SL (2011) Deriving multiple near–optimal solutions to deterministic reservoir operation problems. Water Resour Res 47(8):W08506. doi:10.1029/2011WR010998
-
(2011)
Water Resour Res
, vol.47
, Issue.8
, pp. W08506
-
-
Liu, P.1
Cai, X.M.2
Guo, S.L.3
-
19
-
-
33845656550
-
-
UNESCO, Paris: 680 pp
-
Loucks DP, van Beek E, Stedinger JR, Dijkman JPM, Villars MT (2005) Water resources systems planning and management: an introduction to methods, models, and applications. UNESCO, Paris 680 pp
-
(2005)
Water resources systems planning and management: an introduction to methods, models, and applications
-
-
Loucks, D.P.1
van Beek, E.2
Stedinger, J.R.3
Dijkman, J.P.M.4
Villars, M.T.5
-
20
-
-
0021639049
-
Controllability conditions for reservoir flood control systems with applications
-
Marien JL (1984) Controllability conditions for reservoir flood control systems with applications. Water Resour Res 20(11):1477–1488
-
(1984)
Water Resour Res
, vol.20
, Issue.11
, pp. 1477-1488
-
-
Marien, J.L.1
-
21
-
-
0028667178
-
Building flood control rule curves for multipurpose multireservoir systems using controllability conditions
-
Marien JL, Damazio JM, Costa FS (1994) Building flood control rule curves for multipurpose multireservoir systems using controllability conditions. Water Resour Res 30(4):1135–1144
-
(1994)
Water Resour Res
, vol.30
, Issue.4
, pp. 1135-1144
-
-
Marien, J.L.1
Damazio, J.M.2
Costa, F.S.3
-
22
-
-
1642295818
-
A comparative study of Markov chain Monte Carlo methods for conceptual rainfall-runoff modeling
-
Marshall L, Nott D, Sharma A (2004) A comparative study of Markov chain Monte Carlo methods for conceptual rainfall-runoff modeling. Water Resour Res 40(2):W02501. doi:10.1029/2003WR002378
-
(2004)
Water Resour Res
, vol.40
, Issue.2
, pp. W02501
-
-
Marshall, L.1
Nott, D.2
Sharma, A.3
-
23
-
-
0014776873
-
River flow forecasting through conceptual models
-
Nash JE, Sutcliffe J (1970) River flow forecasting through conceptual models. J Hydrol 10:282–290
-
(1970)
J Hydrol
, vol.10
, pp. 282-290
-
-
Nash, J.E.1
Sutcliffe, J.2
-
24
-
-
0035534934
-
Chance-constrained optimal control for multireservoir system optimization and risk analysis
-
Ouarda TBMJ, Labadie JW (2001) Chance-constrained optimal control for multireservoir system optimization and risk analysis. Stoch Env Res Risk Assess 15(3):185–204
-
(2001)
Stoch Env Res Risk Assess
, vol.15
, Issue.3
, pp. 185-204
-
-
Ouarda, T.B.M.J.1
Labadie, J.W.2
-
25
-
-
33745445005
-
Ignorance is bliss: or seven reasons not to use uncertainty analysis
-
Pappenberger F, Beven KJ (2006) Ignorance is bliss: or seven reasons not to use uncertainty analysis. Water Resour Res 42(5):W05302. doi:10.1029/2005WR004820
-
(2006)
Water Resour Res
, vol.42
, Issue.5
, pp. W05302
-
-
Pappenberger, F.1
Beven, K.J.2
-
26
-
-
27644532560
-
Cascading model uncertainty from medium range weather forecasts (10 days) through a rainfall-runoff model to flood inundation predictions within the European flood forecasting system (EFFS)
-
Pappenberger F, Beven KJ, Hunter NM, Bates PD, Gouweleeuw BT, Thielen J, de Roo APJ (2005) Cascading model uncertainty from medium range weather forecasts (10 days) through a rainfall-runoff model to flood inundation predictions within the European flood forecasting system (EFFS). Hydrol Earth Syst Sci 9:381–393
-
(2005)
Hydrol Earth Syst Sci
, vol.9
, pp. 381-393
-
-
Pappenberger, F.1
Beven, K.J.2
Hunter, N.M.3
Bates, P.D.4
Gouweleeuw, B.T.5
Thielen, J.6
de Roo, A.P.J.7
-
27
-
-
72149096776
-
Real-time management of a multipurpose water reservoir with a heteroscedastic inflow model
-
Pianosi F, Soncini-Sessa R (2009) Real-time management of a multipurpose water reservoir with a heteroscedastic inflow model. Water Resour Res 45(10):W10430. doi:10.1029/2008WR007335
-
(2009)
Water Resour Res
, vol.45
, Issue.10
, pp. W10430
-
-
Pianosi, F.1
Soncini-Sessa, R.2
-
28
-
-
0036784363
-
Flood risk and flood management
-
Plate EJ (2002) Flood risk and flood management. J Hydrol 267(1–2):2–11
-
(2002)
J Hydrol
, vol.267
, Issue.1-2
, pp. 2-11
-
-
Plate, E.J.1
-
29
-
-
0026103174
-
Stochastic modelling of reservoir operations
-
Reznicek K, Cheng TCE (1991) Stochastic modelling of reservoir operations. Eur J Oper Res 50(3):235–248
-
(1991)
Eur J Oper Res
, vol.50
, Issue.3
, pp. 235-248
-
-
Reznicek, K.1
Cheng, T.C.E.2
-
30
-
-
0019228352
-
Reliability programing in reservoir management: 1. Single multipurpose reservoir
-
Simonovic SP, Marino MA (1980) Reliability programing in reservoir management: 1. Single multipurpose reservoir. Water Resour Res 16(5):844–848
-
(1980)
Water Resour Res
, vol.16
, Issue.5
, pp. 844-848
-
-
Simonovic, S.P.1
Marino, M.A.2
-
31
-
-
68949104874
-
Bayesian methods in hydrologic modeling: a study of recent advancements in Markov chain Monte Carlo techniques
-
Smith TJ, Marshall LA (2008) Bayesian methods in hydrologic modeling: a study of recent advancements in Markov chain Monte Carlo techniques. Water Resour Res 44(12):W00B05. doi:10.1029/2007WR006705
-
(2008)
Water Resour Res
, vol.44
, Issue.12
, pp. W00B05
-
-
Smith, T.J.1
Marshall, L.A.2
-
32
-
-
0030217641
-
Reservoir operation for hydropower optimization: a chance-constrained approach
-
Sreenivasan KR, Vedula S (1996) Reservoir operation for hydropower optimization: a chance-constrained approach. Sadhana 21(4):503–510
-
(1996)
Sadhana
, vol.21
, Issue.4
, pp. 503-510
-
-
Sreenivasan, K.R.1
Vedula, S.2
-
33
-
-
0019376844
-
Optimal risk-based design of flood levee systems
-
Tung YK, Mays LW (1981) Optimal risk-based design of flood levee systems. Water Resour Res 17(4):843–852
-
(1981)
Water Resour Res
, vol.17
, Issue.4
, pp. 843-852
-
-
Tung, Y.K.1
Mays, L.W.2
-
34
-
-
33645689883
-
Daily operation of reservoir subject to yearly probabilistic constraints
-
Turgeon A (2005) Daily operation of reservoir subject to yearly probabilistic constraints. J Water Resour Plan Manage 131(5):342–350
-
(2005)
J Water Resour Plan Manage
, vol.131
, Issue.5
, pp. 342-350
-
-
Turgeon, A.1
-
35
-
-
33847624077
-
Treatment of uncertainty using ensemble methods: comparison of sequential data assimilation and Bayesian model averaging
-
Vrugt JA, Robinson BA (2007) Treatment of uncertainty using ensemble methods: comparison of sequential data assimilation and Bayesian model averaging. Water Resour Res 43(1):W01411. doi:10.1029/2005WR004838
-
(2007)
Water Resour Res
, vol.43
, Issue.1
, pp. W01411
-
-
Vrugt, J.A.1
Robinson, B.A.2
-
36
-
-
1542757127
-
A shuffled complex evolution metropolis algorithm for optimization and uncertain assessment of hydrologic model parameters
-
Vrugt JA, Gupta HV, Bouten W, Sorooshian S (2003) A shuffled complex evolution metropolis algorithm for optimization and uncertain assessment of hydrologic model parameters. Water Resour Res 39(8):1201. doi:10.1029/2002WR001642,8
-
(2003)
Water Resour Res
, vol.39
, Issue.8
, pp. 1201
-
-
Vrugt, J.A.1
Gupta, H.V.2
Bouten, W.3
Sorooshian, S.4
-
37
-
-
84866035685
-
Uncertainty quantification in kinematic-wave models
-
Wang P, Tartakovsky DM (2012) Uncertainty quantification in kinematic-wave models. J Comput Phys 231(23):7868–7880
-
(2012)
J Comput Phys
, vol.231
, Issue.23
, pp. 7868-7880
-
-
Wang, P.1
Tartakovsky, D.M.2
-
38
-
-
1642433456
-
A scenario-based stochastic programming model for water supplies from the highland lakes
-
Watkins DW Jr, McKinney LS, Nielson SS, Martin QW (2000) A scenario-based stochastic programming model for water supplies from the highland lakes. Int Trans Oper Res 7(3):211–230
-
(2000)
Int Trans Oper Res
, vol.7
, Issue.3
, pp. 211-230
-
-
Watkins, D.W.1
McKinney, L.S.2
Nielson, S.S.3
Martin, Q.W.4
-
39
-
-
0027788414
-
Reservoir-system simulation and optimization models
-
Wurbs RA (1993) Reservoir-system simulation and optimization models. J Water Resour Plan Manage 119:445–472
-
(1993)
J Water Resour Plan Manage
, vol.119
, pp. 445-472
-
-
Wurbs, R.A.1
-
40
-
-
78649499938
-
Incorporating inflow uncertainty into risk assessment for reservoir operation
-
Xu ZX, Ito K, Liao S, Wang L (1997) Incorporating inflow uncertainty into risk assessment for reservoir operation. Stoch Hydrol Hydraul 11(5):433–448
-
(1997)
Stoch Hydrol Hydraul
, vol.11
, Issue.5
, pp. 433-448
-
-
Xu, Z.X.1
Ito, K.2
Liao, S.3
Wang, L.4
-
41
-
-
0022268780
-
Reservoir management and operations models: a state-of-the-art review
-
Yeh WWG (1985) Reservoir management and operations models: a state-of-the-art review. Water Resour Res 21(12):1797–1818
-
(1985)
Water Resour Res
, vol.21
, Issue.12
, pp. 1797-1818
-
-
Yeh, W.W.G.1
-
42
-
-
0026895285
-
The Xinanjiang model applied in China
-
Zhao RJ (1992) The Xinanjiang model applied in China. J Hydrol 135(1–4):371–381
-
(1992)
J Hydrol
, vol.135
, Issue.1-4
, pp. 371-381
-
-
Zhao, R.J.1
|