메뉴 건너뛰기




Volumn 9780203968918, Issue , 2006, Pages 12-29

Foundations of concurrent engineering

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING; INDUSTRIAL ENGINEERING;

EID: 84919518659     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.4324/9780203968918     Document Type: Chapter
Times cited : (8)

References (58)
  • 1
    • 0000372381 scopus 로고
    • A concurrent engineering methodology using analogies to just-in-time concepts
    • Adachi, T., Enkawa, T. and Shih, L. C. (1995), 'A concurrent engineering methodology using analogies to just-in-time concepts', International Journal of Production Research, Vol. 33, No. 3, pp. 587-609.
    • (1995) International Journal of Production Research , vol.33 , Issue.3 , pp. 587-609
    • Adachi, T.1    Enkawa, T.2    Shih, L.C.3
  • 2
    • 0009401497 scopus 로고
    • From project to process management in engineering: managerial and methodological challenges
    • in Dasu, S. and Eastman, C. (eds), Kluwer Academic Publishers, Norwell
    • Adler, P., Mandelbaum, A., Nguyen, V. and Schwerer, E. (1994), 'From project to process management in engineering: managerial and methodological challenges', in Dasu, S. and Eastman, C. (eds), Management of Design, Kluwer Academic Publishers, Norwell, pp. 61-82.
    • (1994) Management of Design , pp. 61-82
    • Adler, P.1    Mandelbaum, A.2    Nguyen, V.3    Schwerer, E.4
  • 3
  • 4
    • 0004008765 scopus 로고
    • (ed.), Productivity Press, Cambridge, MA
    • Akao, Yoji (ed.) (1990), Quality Function Deployment, Productivity Press, Cambridge, MA, 369 p.
    • (1990) Quality Function Deployment , pp. 369
    • Akao, Y.1
  • 5
    • 84889144113 scopus 로고
    • Managing design for continuous improvement in a system job shop
    • Ashton, J. A. (1992), 'Managing design for continuous improvement in a system job shop', Manufacturing Review, Vol. 5, No. 3, pp. 149-157.
    • (1992) Manufacturing Review , vol.5 , Issue.3 , pp. 149-157
    • Ashton, J.A.1
  • 6
    • 8844252280 scopus 로고
    • How to reduce lead-time in R & D: the application of logistic thinking on the "one-of-a-kind" -business
    • in Hirsch, B. E. and Thoben, K.-D. (eds), Elsevier Science, Amsterdam
    • Augustin, S. and Ruffer, J. (1992), 'How to reduce lead-time in R & D: the application of logistic thinking on the "one-of-a-kind" -business', in Hirsch, B. E. and Thoben, K.-D. (eds), 'One-of-a-kind Production': New Approaches, Elsevier Science, Amsterdam, pp. 255-262.
    • (1992) 'One-of-a-kind Production': New Approaches , pp. 255-262
    • Augustin, S.1    Ruffer, J.2
  • 7
    • 84993044173 scopus 로고    scopus 로고
    • Managing work flow on design projects: a case study
    • Ballard, G. (2002), 'Managing work flow on design projects: a case study', Engineering Construction and Architectural Management, Vol. 9, No. 3, pp. 284-291.
    • (2002) Engineering Construction and Architectural Management , vol.9 , Issue.3 , pp. 284-291
    • Ballard, G.1
  • 8
    • 13944251405 scopus 로고    scopus 로고
    • On the agenda of design management research
    • Guaruja, Sao Paulo, Brazil, 13-15 August, available at, January 2005
    • Ballard, G. and Koskela, L. (1998), 'On the agenda of design management research', 6th Annual Conference of the International Group for Lean Construction, Guaruja, Sao Paulo, Brazil, 13-15 August (available at: http://www.ce.berkeley.edu/~tommelein/IGLC-6/index.html, January 2005).
    • (1998) 6th Annual Conference of the International Group for Lean Construction
    • Ballard, G.1    Koskela, L.2
  • 11
    • 8844221973 scopus 로고
    • Implementation projects: decisions and expenditures
    • in Heim, J. and Compton, W. (eds), National Academy Press, Washington, DC
    • Bowen, H. (1992), 'Implementation projects: decisions and expenditures', in Heim, J. and Compton, W. (eds), Manufacturing Systems: Foundations of World-Class Practice, National Academy Press, Washington, DC, pp. 93-99.
    • (1992) Manufacturing Systems: Foundations of World-Class Practice , pp. 93-99
    • Bowen, H.1
  • 15
    • 84919532920 scopus 로고
    • Quality Function Deployment, Addison-Wesley, Reading
    • Cohen, L. (1995), Quality Function Deployment, Addison-Wesley, Reading, 348 p.
    • (1995) , pp. 348
    • Cohen, L.1
  • 17
    • 0001906688 scopus 로고
    • The rework cycle: benchmarks for the project manager
    • Cooper, K. (1993), 'The rework cycle: benchmarks for the project manager', Project Management Journal, Vol. XXIV, March, pp. 17-21.
    • (1993) Project Management Journal , vol.24 , Issue.MARCH , pp. 17-21
    • Cooper, K.1
  • 18
    • 0002485389 scopus 로고    scopus 로고
    • How Microsoft makes large teams work like small teams
    • Fall
    • Cusumano, M. (1997), 'How Microsoft makes large teams work like small teams', Sloan Management Review, Fall, pp. 9-20.
    • (1997) Sloan Management Review , pp. 9-20
    • Cusumano, M.1
  • 19
    • 84919532919 scopus 로고
    • (eds), Kluwer Academic Publishers, Norwell, MA
    • Dasu, S. and Eastman, C. (eds) (1994), Management of Design, Kluwer Academic Publishers, Norwell, MA, 277 p.
    • (1994) Management of Design , pp. 277
    • Dasu, S.1    Eastman, C.2
  • 21
    • 0010486846 scopus 로고    scopus 로고
    • The penetration of information technologies into civil and structural engineering design: state-of-the-art and directions toward the future
    • in Kumar, B. and Retik, A. (eds), Civil Comp Press, Edinburgh
    • Fenves, S. J. (1996), 'The penetration of information technologies into civil and structural engineering design: state-of-the-art and directions toward the future', in Kumar, B. and Retik, A. (eds), Information Representation and Delivery in Civil and Structural Engineering Design, Civil Comp Press, Edinburgh, pp. 1-5.
    • (1996) Information Representation and Delivery in Civil and Structural Engineering Design , pp. 1-5
    • Fenves, S.J.1
  • 23
    • 0004000345 scopus 로고
    • Van Nostrand Reinhold, New York
    • Fowler, T. (1990), Value Analysis in Design, Van Nostrand Reinhold, New York, 302 p.
    • (1990) Value Analysis in Design , pp. 302
    • Fowler, T.1
  • 25
    • 85056051967 scopus 로고    scopus 로고
    • Group decision support for value management
    • in Langford, D. A. and Retik, A. (eds), E & FN Spon, London
    • Green, S. D. and Simister, S. J. (1996), 'Group decision support for value management', in Langford, D. A. and Retik, A. (eds), The Organization and Management of Construction. Volume 2, E & FN Spon, London, pp. 529-540.
    • (1996) The Organization and Management of Construction , vol.2 , pp. 529-540
    • Green, S.D.1    Simister, S.J.2
  • 28
    • 0003160633 scopus 로고
    • Principles of concurrent engineering
    • in Parsaei, H. R. and Sullivan, W. G. (eds), Chapman & Hall, London
    • Jo, H. H., Parsaei, H. R. and Sullivan, W. R. (1993), 'Principles of concurrent engineering', in Parsaei, H. R. and Sullivan, W. G. (eds), Concurrent Engineering, Chapman & Hall, London, pp. 3-23.
    • (1993) Concurrent Engineering , pp. 3-23
    • Jo, H.H.1    Parsaei, H.R.2    Sullivan, W.R.3
  • 29
    • 0000022219 scopus 로고    scopus 로고
    • Interdepartmental integration: a definition with implications for product development performance
    • Kahn, K. B. (1996), 'Interdepartmental integration: a definition with implications for product development performance', Journal of Product Innovation Management, Vol. 13, No. 2, pp. 137-151.
    • (1996) Journal of Product Innovation Management , vol.13 , Issue.2 , pp. 137-151
    • Kahn, K.B.1
  • 30
    • 0003656231 scopus 로고
    • Application of the New Production Philosophy to Construction
    • Center for Integrated Facilities Engineering (CIFE), Stanford University
    • Koskela, L. (1992), Application of the New Production Philosophy to Construction, Technical Report; 72, Center for Integrated Facilities Engineering (CIFE), Stanford University, 75 p.
    • (1992) Technical Report , pp. 75
    • Koskela, L.1
  • 32
    • 0013198772 scopus 로고    scopus 로고
    • The underlying theory of project management is obsolete
    • in Slevin, D. P., Cleland, D. I. and Pinto, J. K. (eds), Project Management Institute
    • Koskela, L. and Howell, G. (2002), 'The underlying theory of project management is obsolete', in Slevin, D. P., Cleland, D. I. and Pinto, J. K. (eds), Proceedings of PMI Research Conference, Project Management Institute, pp. 293-301.
    • (2002) Proceedings of PMI Research Conference , pp. 293-301
    • Koskela, L.1    Howell, G.2
  • 36
    • 0343373605 scopus 로고
    • Key characteristics for agile product development and manufacturing
    • in Barker, J. J. (ed.), Agility Forum Conference Proceedings
    • Lee, D. J., Thornton, A. C. and Cunningham, T. W. (1995), 'Key characteristics for agile product development and manufacturing', in Barker, J. J. (ed.), Creating the Agile Organization: Models, Metrics and Pilots, Agility Forum Conference Proceedings, Vol. 2, pp. 258-268.
    • (1995) Creating the Agile Organization: Models, Metrics and Pilots , vol.2 , pp. 258-268
    • Lee, D.J.1    Thornton, A.C.2    Cunningham, T.W.3
  • 38
    • 0008373094 scopus 로고
    • Methodik zum Entwickeln und Konstruieren technischer Systeme und Produkte
    • Richtlinie VDI 2221. VDI-Verlag, Düsseldorf
    • Methodik zum Entwickeln und Konstruieren technischer Systeme und Produkte. (1986), Richtlinie VDI 2221. VDI-Verlag, Düsseldorf, 35 p.
    • (1986) , pp. 35
  • 39
    • 84889114061 scopus 로고    scopus 로고
    • Modèles gestionnaires et régulations économiques de la conception
    • Du Management de Projet aux Nouvelles Rationalisations de la Conception, CNRS, Ecole Polytechnique
    • Midler, C. (1996), Modèles gestionnaires et régulations économiques de la conception. Cahiers du Centre de Recherche en Gestion No. 13, Du Management de Projet aux Nouvelles Rationalisations de la Conception, CNRS, Ecole Polytechnique, pp. 11-26.
    • (1996) Cahiers du Centre de Recherche en Gestion No. 13 , pp. 11-26
    • Midler, C.1
  • 42
    • 84993912313 scopus 로고
    • Expected development time reductions in the German mechanical engineering industry
    • Murmann, P. (1994), 'Expected development time reductions in the German mechanical engineering industry', Journal of Product Innovation Management, Vol. 11, pp. 236-252.
    • (1994) Journal of Product Innovation Management , vol.11 , pp. 236-252
    • Murmann, P.1
  • 43
    • 33749318408 scopus 로고    scopus 로고
    • Prentice Hall, Upper Saddle River, NJ
    • Prasad, B. (1996), Concurrent Engineering Fundamentals, Vol. 1, Prentice Hall, Upper Saddle River, NJ, 478 p.
    • (1996) Concurrent Engineering Fundamentals , vol.1 , pp. 478
    • Prasad, B.1
  • 45
    • 0343358547 scopus 로고
    • A redesign for engineering
    • May-June
    • Putnam, A. O. (1985), 'A redesign for engineering', Harvard Business Review, May-June, pp. 139-144.
    • (1985) Harvard Business Review , pp. 139-144
    • Putnam, A.O.1
  • 47
    • 12444335465 scopus 로고
    • Planning and control of concurrent engineering projects
    • Rolstadås, A. (1995), 'Planning and control of concurrent engineering projects', International Journal of Production Economics, Vol. 38, pp. 3-13.
    • (1995) International Journal of Production Economics , vol.38 , pp. 3-13
    • Rolstadås, A.1
  • 52
    • 0009319431 scopus 로고
    • Facing up to the engineering gap
    • Spring
    • Soderberg, L. G. (1989), 'Facing up to the engineering gap', The McKinsey Quarterly, Spring, pp. 2-18.
    • (1989) The McKinsey Quarterly , pp. 2-18
    • Soderberg, L.G.1
  • 53
    • 5744237650 scopus 로고
    • Design and operations of large systems
    • Suh, N. P. (1995), 'Design and operations of large systems', Journal of Manufacturing Systems, Vol. 14, No. 3, pp. 203-213.
    • (1995) Journal of Manufacturing Systems , vol.14 , Issue.3 , pp. 203-213
    • Suh, N.P.1
  • 57
    • 0002533915 scopus 로고
    • The second Toyota paradox: how delaying decisions can make better cars faster
    • Spring
    • Ward, A., Liker, J. K., Cristiano, J. J. and Sobek, D. K. II. (1995), 'The second Toyota paradox: how delaying decisions can make better cars faster', Sloan Management Review, Spring, pp. 43-61.
    • (1995) Sloan Management Review , pp. 43-61
    • Ward, A.1    Liker, J.K.2    Cristiano, J.J.3    Sobek II, D.K.4
  • 58
    • 0002689901 scopus 로고    scopus 로고
    • Synergy effects of sharing knowledge during cooperative product design
    • Yoshimura, M. and Yoshikawa, K. (1998), 'Synergy effects of sharing knowledge during cooperative product design', Concurrent Engineering: Research and Applications, Vol. 6, No. 1, pp. 7-14.
    • (1998) Concurrent Engineering: Research and Applications , vol.6 , Issue.1 , pp. 7-14
    • Yoshimura, M.1    Yoshikawa, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.