메뉴 건너뛰기




Volumn 27, Issue 6, 2014, Pages 3067-3080

Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment

Author keywords

fuzzy set theory; graded mean integration representation method; Lot sizing; rework process; signed distance method; single stage production system

Indexed keywords

COST FUNCTIONS; COSTS; FUZZY SET THEORY; FUZZY SETS;

EID: 84915747405     PISSN: 10641246     EISSN: 18758967     Source Type: Journal    
DOI: 10.3233/IFS-141264     Document Type: Article
Times cited : (27)

References (31)
  • 1
    • 84856821514 scopus 로고    scopus 로고
    • Solving fully fuzzy mathematical programming model ofEOQproblem with a direct approach based on fuzzy ranking and PSO
    • A. Baykasoglu and T. Gocken. Solving fully fuzzy mathematical programming model ofEOQproblem with a direct approach based on fuzzy ranking and PSO. Journal of Intelligent & Fuzzy Systems 22 (2011), 237-251.
    • (2011) Journal of Intelligent & Fuzzy Systems , vol.22 , pp. 237-251
    • Baykasoglu, A.1    Gocken, T.2
  • 2
    • 0032592055 scopus 로고    scopus 로고
    • Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number
    • S.-C. Chang. Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number. Fuzzy Sets and Systems 107 (1999), 37-57.
    • (1999) Fuzzy Sets and Systems , vol.107 , pp. 37-57
    • Chang, S.-C.1
  • 5
    • 84872732426 scopus 로고    scopus 로고
    • Amulti-stage production-inventory model with learning and forgetting effects, rework and scrap
    • C.H. Glock and M.Y. Jaber, Amulti-stage production-inventory model with learning and forgetting effects, rework and scrap. Computers & Industrial Engineering 64 (2013), 708-720.
    • (2013) Computers & Industrial Engineering , vol.64 , pp. 708-720
    • Glck, C.H.1    Jaber, M.Y.2
  • 9
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A. Jamal, B.R. Sarker and S. Mondal. Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering 47 (2004), 77-89.
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.1    Sarker, B.R.2    Mondal, S.3
  • 11
  • 13
    • 0037121504 scopus 로고    scopus 로고
    • Fuzzy models for singleperiod inventory problem
    • L. Li, S.N. Kabadi and K. Nair. Fuzzy models for singleperiod inventory problem. Fuzzy Sets and Systems 132 (2002), 273-289.
    • (2002) Fuzzy Sets and Systems , vol.132 , pp. 273-289
    • Li, L.1    Kabadi, S.N.2    Nair, K.3
  • 14
    • 84912532892 scopus 로고    scopus 로고
    • Fuzzy economic order quantity model with imperfect items, shortages and inspection errors
    • J. Liu and H. Zheng. Fuzzy economic order quantity model with imperfect items, shortages and inspection errors. Systems Engineering Procedia 4 (2012), 282-289.
    • (2012) Systems Engineering Procedia , vol.4 , pp. 282-289
    • Liu, J.1    Zheng, H.2
  • 15
    • 84869105181 scopus 로고    scopus 로고
    • Fuzzy inventory models for items with imperfect quality and shortage backordering under crisp and fuzzy decision variables
    • G.C. Mahata and A. Goswami. Fuzzy inventory models for items with imperfect quality and shortage backordering under crisp and fuzzy decision variables. Computers & Industrial Engineering 64 (2013), 190-199.
    • (2013) Computers & Industrial Engineering , vol.64 , pp. 190-199
    • Mahata, G.C.1    Goswami, A.2
  • 16
    • 0037209903 scopus 로고    scopus 로고
    • Multi-item fuzzy EOQ models using genetic algorithm
    • S. Mondal and M. Maiti. Multi-item fuzzy EOQ models using genetic algorithm. Computers & Industrial Engineering 44 (2003), 105-117.
    • (2003) Computers & Industrial Engineering , vol.44 , pp. 105-117
    • Mondal, S.1    Maiti, M.2
  • 17
    • 0023594008 scopus 로고
    • Fuzzy-set theoretic interpretation of economic order quantity, Systems, Man and Cybernetics
    • K.S. Park. Fuzzy-set theoretic interpretation of economic order quantity, Systems, Man and Cybernetics. IEEE Transactions on 17 (1987), 1082-1084.
    • (1987) IEEE Transactions on , vol.17 , pp. 1082-1084
    • Park, K.S.1
  • 18
    • 0022613610 scopus 로고
    • Optimal lot sizing process quality improvement and setup cost reduction
    • E.L. Porteus. Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research 34 (1986), 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 19
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes, IIE Transactions 18 (1986), 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 21
    • 84901622120 scopus 로고    scopus 로고
    • A fuzzified version of the economic production quantity (EPQ) model with backorders and rework for a single-stage system
    • E. Shekarian, M.Y. Jaber, N. Kazemi and E. Ehsani. A fuzzified version of the economic production quantity (EPQ) model with backorders and rework for a single-stage system. European Journal of Industrial Engineering 8 (2014), 291-324.
    • (2014) European Journal of Industrial Engineering , vol.8 , pp. 291-324
    • Shekarian, E.1    Jaber, M.Y.2    Kazemi, N.3    Ehsani, E.4
  • 22
    • 0037740269 scopus 로고
    • The most economical production lot
    • E. Taft. The most economical production lot, The Iron Age 101 (1918), 1410-1412.
    • (1918) The Iron Age , vol.101 , pp. 1410-1412
    • Taft, E.1
  • 23
    • 0032203962 scopus 로고    scopus 로고
    • Analysis of production systems when run length influences product quality
    • T. Urban. Analysis of production systems when run length influences product quality. International Journal of Production Research 36 (1998), 3085-3094.
    • (1998) International Journal of Production Research , vol.36 , pp. 3085-3094
    • Urban, T.1
  • 26
    • 0037449245 scopus 로고    scopus 로고
    • Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance
    • J.-S.Yao and J. Chiang. Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance. European Journal of Operational Research 148 (2003), 401-409.
    • (2003) European Journal of Operational Research , vol.148 , pp. 401-409
    • Yao, J.-S.1    Chiang, J.2
  • 27
    • 0001675272 scopus 로고    scopus 로고
    • Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set
    • J.-S. Yao and J.-S. Su, Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set. European Journal of Operational Research 124 (2000), 390-408.
    • (2000) European Journal of Operational Research , vol.124 , pp. 390-408
    • Yao, J.-S.1    Su, J.-S.2
  • 28
    • 0000903516 scopus 로고    scopus 로고
    • Ranking fuzzy numbers based on decomposition principle and signed distance
    • J.-S. Yao and K.Wu, Ranking fuzzy numbers based on decomposition principle and signed distance. Fuzzy Sets and Systems 116 (2000), 275-288.
    • (2000) Fuzzy Sets and Systems , vol.116 , pp. 275-288
    • Yao, J.-S.1    Wu, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.