메뉴 건너뛰기




Volumn 25, Issue 5, 2014, Pages 1135-1152

Applying discrete event simulation to the design of a service delivery system in the aerospace industry: A case study

Author keywords

Aerospace industry; Service delivery systems; Service level agreement; Simulation

Indexed keywords

AEROSPACE INDUSTRY; CONTRACTS; INTELLIGENT SYSTEMS; MONTE CARLO METHODS;

EID: 84906949316     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0742-1     Document Type: Article
Times cited : (13)

References (38)
  • 2
    • 26844503523 scopus 로고    scopus 로고
    • Cross-training decisions in field services with three job types and server-job mismatch
    • 10.1111/j.00117315.2004.02642.x
    • Agnihothri, S. R., & Mishra, A. K. (2004). Cross-training decisions in field services with three job types and server-job mismatch. Decision Sciences, 35(2), 239-257.
    • (2004) Decision Sciences , vol.35 , Issue.2 , pp. 239-257
    • Agnihothri, S.R.1    Mishra, A.K.2
  • 3
    • 84858746230 scopus 로고    scopus 로고
    • Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice
    • 10.1016/j.omega.2011.06.008
    • Bacchetti, A., & Saccani, N. (2012). Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice. Omega, 40(6), 722-737.
    • (2012) Omega , vol.40 , Issue.6 , pp. 722-737
    • Bacchetti, A.1    Saccani, N.2
  • 8
    • 45849131685 scopus 로고    scopus 로고
    • A decision-making framework for managing maintenance spare parts
    • 10.1080/09537280802034471
    • Cavalieri, S., Garetti, M., Macchi, M., & Pinto, R. (2008). A decision-making framework for managing maintenance spare parts. Production Planning and Control, 19(4), 379-396.
    • (2008) Production Planning and Control , vol.19 , Issue.4 , pp. 379-396
    • Cavalieri, S.1    Garetti, M.2    Macchi, M.3    Pinto, R.4
  • 10
    • 84865250871 scopus 로고    scopus 로고
    • Evaluation models for service oriented process in spare parts management
    • doi: 10.1007/s10845-010-0486-0
    • Cheng, C. Y., & Prabhu, V. (2010). Evaluation models for service oriented process in spare parts management. Journal of Intelligent Manufacturing, 23(4), 1403-1417. doi: 10.1007/s10845-010-0486-0.
    • (2010) Journal of Intelligent Manufacturing , vol.23 , Issue.4 , pp. 1403-1417
    • Cheng, C.Y.1    Prabhu, V.2
  • 11
    • 79551538512 scopus 로고    scopus 로고
    • A general simulation framework for supply chain modeling: State of the art and case study
    • Cimino, A., Longo, F., & Mirabelli, G. (2010). A general simulation framework for supply chain modeling: State of the art and case study. International Journal of Computer Science Issue, 7(2), 1-9.
    • (2010) International Journal of Computer Science Issue , vol.7 , Issue.2 , pp. 1-9
    • Cimino, A.1    Longo, F.2    Mirabelli, G.3
  • 13
    • 84964188843 scopus 로고
    • The statistics of discrete event simulation
    • 10.1177/003754976801000406
    • Fishman, G. S., & Kiviat, P. J. (1968). The statistics of discrete event simulation. Simulation, 10(4), 185-195.
    • (1968) Simulation , vol.10 , Issue.4 , pp. 185-195
    • Fishman, G.S.1    Kiviat, P.J.2
  • 14
    • 84896689435 scopus 로고    scopus 로고
    • A simulation modeling framework for multiple-aisle automated storage and retrieval systems
    • doi: 10.1007/s10845-012-0686-x
    • Gagliardi, J. P., Renaud, J., & Ruiz, A. (2012). A simulation modeling framework for multiple-aisle automated storage and retrieval systems. Journal of Intelligent Manufacturing. doi: 10.1007/s10845-012-0686-x.
    • (2012) Journal of Intelligent Manufacturing
    • Gagliardi, J.P.1    Renaud, J.2    Ruiz, A.3
  • 15
    • 84865230142 scopus 로고    scopus 로고
    • An integrated modeling method for assessment of quality systems applied to aerospace manufacturing supply chains
    • doi: 10.1007/s10845-010-0447-7
    • Harun, K., & Cheng, K. (2010). An integrated modeling method for assessment of quality systems applied to aerospace manufacturing supply chains. Journal of Intelligent Manufacturing, 23(4), 1365-1378. doi: 10.1007/s10845-010-0447-7.
    • (2010) Journal of Intelligent Manufacturing , vol.23 , Issue.4 , pp. 1365-1378
    • Harun, K.1    Cheng, K.2
  • 17
    • 59049099709 scopus 로고    scopus 로고
    • Spare parts inventory control considering stochastic growth of an installed base
    • 10.1016/j.cie.2008.07.002
    • Jin, T., & Liao, H. (2009). Spare parts inventory control considering stochastic growth of an installed base. Computers & Industrial Engineering, 56(1), 452-460.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 452-460
    • Jin, T.1    Liao, H.2
  • 22
    • 80052808555 scopus 로고    scopus 로고
    • Advances of modeling and simulation in supply chain and industry
    • doi: 10.1177/0037549711418033
    • Longo, F. (2011). Advances of modeling and simulation in supply chain and industry. Simulation, 87(8), 651-656. doi: 10.1177/0037549711418033.
    • (2011) Simulation , vol.87 , Issue.8 , pp. 651-656
    • Longo, F.1
  • 23
    • 38849130019 scopus 로고    scopus 로고
    • An advanced supply chain management tool based on modeling and simulation
    • 10.1016/j.cie.2007.09.008
    • Longo, F., & Mirabelli, G. (2008). An advanced supply chain management tool based on modeling and simulation. Computers and Industrial Engineering, 54(3), 570-588.
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 570-588
    • Longo, F.1    Mirabelli, G.2
  • 24
    • 33846964204 scopus 로고    scopus 로고
    • Designing a support system for aerospace maintenance supply chains
    • 10.1108/17410380710722863
    • MacDonnell, M., & Clegg, B. (2007). Designing a support system for aerospace maintenance supply chains. Journal of Manufacturing Technology Management, 18(2), 139-152.
    • (2007) Journal of Manufacturing Technology Management , vol.18 , Issue.2 , pp. 139-152
    • MacDonnell, M.1    Clegg, B.2
  • 25
    • 69649105648 scopus 로고    scopus 로고
    • Improving the rigor of discrete-event simulation in logistics and supply chain research
    • doi: 10.1108/09600030910951692
    • Manuj, I., Mentzer, J. T., & Bowers, M. R. (2009). Improving the rigor of discrete-event simulation in logistics and supply chain research. International Journal of Physical Distribution & Logistics Management, 39(3), 172-201. doi: 10.1108/09600030910951692.
    • (2009) International Journal of Physical Distribution & Logistics Management , vol.39 , Issue.3 , pp. 172-201
    • Manuj, I.1    Mentzer, J.T.2    Bowers, M.R.3
  • 29
    • 18144421914 scopus 로고    scopus 로고
    • Customer-oriented improvement and evaluation of supply chain processes supported by simulation models
    • 10.1016/j.ijpe.2004.07.004
    • Reiner, G. (2005). Customer-oriented improvement and evaluation of supply chain processes supported by simulation models. International Journal of Production Economics, 96(3), 381-395.
    • (2005) International Journal of Production Economics , vol.96 , Issue.3 , pp. 381-395
    • Reiner, G.1
  • 31
    • 79951620428 scopus 로고    scopus 로고
    • Forecasting demand in the aerospace and defense industry
    • Safavi, A. (2005). Forecasting demand in the aerospace and defense industry. Journal of Business Forecasting, 24(1), 2-7.
    • (2005) Journal of Business Forecasting , vol.24 , Issue.1 , pp. 2-7
    • Safavi, A.1
  • 32
    • 84901410259 scopus 로고    scopus 로고
    • A model for integrating services and product EOL management in sustainable product service system (S-PSS)
    • doi: 10.1007/s10845-012-0694-x
    • Shokohyar, S., Mansour, S., & Karimi, B. (2012). A model for integrating services and product EOL management in sustainable product service system (S-PSS). Journal of Intelligent Manufacturing, 1-14. doi: 10.1007/s10845-012-0694-x.
    • (2012) Journal of Intelligent Manufacturing , pp. 1-14
    • Shokohyar, S.1    Mansour, S.2    Karimi, B.3
  • 33
    • 84993077818 scopus 로고    scopus 로고
    • Approximate dynamic programming for management of high value spare parts
    • 10.1108/17410380910929592
    • Simao, H., & Powell, W. (2009). Approximate dynamic programming for management of high value spare parts. Journal of Manufacturing Technology Management, 20(2), 147-160.
    • (2009) Journal of Manufacturing Technology Management , vol.20 , Issue.2 , pp. 147-160
    • Simao, H.1    Powell, W.2
  • 34
    • 84862212975 scopus 로고    scopus 로고
    • Physics-based modeling strategies for diagnostic and prognostic application in aerospace systems
    • 10.1007/s10845-009-0340-4
    • Stringer, D. B., Sheth, P. N., & Allaire, P. E. (2012). Physics-based modeling strategies for diagnostic and prognostic application in aerospace systems. Journal of Intelligent Manufacturing, 23(2), 155-162.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.2 , pp. 155-162
    • Stringer, D.B.1    Sheth, P.N.2    Allaire, P.E.3
  • 35
    • 0242302704 scopus 로고    scopus 로고
    • Simulation in the supply chain context: A survey
    • doi: 10.1016/s0166-3615(03)00104-0
    • Terzi, S., & Cavalieri, S. (2004). Simulation in the supply chain context: A survey. Computers in Industry, 53(1), 3-16. doi: 10.1016/s0166- 3615(03)00104-0.
    • (2004) Computers in Industry , vol.53 , Issue.1 , pp. 3-16
    • Terzi, S.1    Cavalieri, S.2
  • 36
    • 27744602885 scopus 로고    scopus 로고
    • A modeling framework for supply chain simulation: Opportunities for improved decision making
    • van der Zee, D. J., & van der Vorst, J. G. A. J. (2005). A modeling framework for supply chain simulation: Opportunities for improved decision making. Decision Sciences, 36(1), 65-95.
    • (2005) Decision Sciences , vol.36 , Issue.1 , pp. 65-95
    • Van Der Zee, D.J.1    Van Der Vorst, J.G.A.J.2
  • 37
    • 0036830721 scopus 로고    scopus 로고
    • Demand chain management theory constraints and development from global aerospace supply webs
    • 10.1016/S0272-6963(02)00035-9
    • Williams, T., Maull, R., & Ellis, B. (2002). Demand chain management theory constraints and development from global aerospace supply webs. Journal of Operations Management, 20, 691-706.
    • (2002) Journal of Operations Management , vol.20 , pp. 691-706
    • Williams, T.1    Maull, R.2    Ellis, B.3
  • 38
    • 84870931704 scopus 로고    scopus 로고
    • Modelling and simulation of dynamically integrated manufacturing systems
    • 10.1007/s10845-010-0494-0
    • Zhang, D., & Anosike, A. (2012). Modelling and simulation of dynamically integrated manufacturing systems. Journal of Intelligent Manufacturing, 23(6), 2367-2382.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.6 , pp. 2367-2382
    • Zhang, D.1    Anosike, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.