메뉴 건너뛰기




Volumn 155, Issue , 2014, Pages 324-329

A note on "optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment"

Author keywords

Inventory; Non instantaneous deterioration; Stock dependent demand; Trade credit

Indexed keywords

PROFITABILITY;

EID: 84906216071     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2013.12.017     Document Type: Article
Times cited : (71)

References (17)
  • 1
    • 84906092636 scopus 로고    scopus 로고
    • Retailer's economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity
    • In press
    • Chen, S.-C., Cárdenas-Barrón, L.E., Teng, J.-T., 2013a.Retailer's economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity. Int. J. Prod. Econ., In press, 〈http://dx.doi.org/10.1016/j.ijpe.2013.05.032〉
    • (2013) Int. J. Prod. Econ.
    • Chen, S.-C.1    Cárdenas-Barrón, L.E.2    Teng, J.-T.3
  • 2
    • 84900495643 scopus 로고    scopus 로고
    • Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credits
    • In press
    • Chen, S.-C., Teng, J.-T., Skouri, K., 2013b. Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credits. Int. J. Prod. Econ., In press, 〈http://dx.doi.org/ 10.1016/j.ijpe.2013.07.024〉.
    • (2013) Int. J. Prod. Econ.
    • Chen, S.-C.1    Teng, J.-T.2    Skouri, K.3
  • 3
    • 84877921105 scopus 로고    scopus 로고
    • Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments
    • M.-S. Chern, Q. Pan, J.-T. Teng, Y.-L. Chan, and S.-C. Chen Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments Int. J. Prod. Econ. 144 1 2013 397 404
    • (2013) Int. J. Prod. Econ. , vol.144 , Issue.1 , pp. 397-404
    • Chern, M.-S.1    Pan, Q.2    Teng, J.-T.3    Chan, Y.-L.4    Chen, S.-C.5
  • 4
    • 0000356787 scopus 로고
    • How many parts to make at once
    • and 152
    • F.W. Harris How many parts to make at once Factory Mag. Manage. 10 2 1913 135 136 and 152
    • (1913) Factory Mag. Manage. , vol.10 , Issue.2 , pp. 135-136
    • Harris, F.W.1
  • 5
    • 84862778675 scopus 로고    scopus 로고
    • A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items
    • Y.-J. Lin, L.-Y. Ouyang, and Y.-F. Dang A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items Appl. Math. Comput. 218 14 2012 7498 7514
    • (2012) Appl. Math. Comput. , vol.218 , Issue.14 , pp. 7498-7514
    • Lin, Y.-J.1    Ouyang, L.-Y.2    Dang, Y.-F.3
  • 6
    • 84855982935 scopus 로고    scopus 로고
    • Inventory ordering policies of delayed deteriorating items under permissible delay in payments
    • A. Musa, and B. Sani Inventory ordering policies of delayed deteriorating items under permissible delay in payments Int. J. Prod. Econ. 136 1 2012 75 83
    • (2012) Int. J. Prod. Econ. , vol.136 , Issue.1 , pp. 75-83
    • Musa, A.1    Sani, B.2
  • 7
    • 84878831877 scopus 로고    scopus 로고
    • Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging
    • L.-Y. Ouyang, and C.-T. Chang Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging Int. J. Prod. Econ. 144 2 2013 610 617
    • (2013) Int. J. Prod. Econ. , vol.144 , Issue.2 , pp. 610-617
    • Ouyang, L.-Y.1    Chang, C.-T.2
  • 8
    • 84859435231 scopus 로고    scopus 로고
    • An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production
    • B. Sarkar An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production Appl. Math. Comput. 218 17 2012 8295 8308
    • (2012) Appl. Math. Comput. , vol.218 , Issue.17 , pp. 8295-8308
    • Sarkar, B.1
  • 9
    • 84880572147 scopus 로고    scopus 로고
    • A review of trade credit literature: Opportunity for research in operations
    • D. Seifert, R.W. Seifert, and M. Protopappa-Sieke A review of trade credit literature: opportunity for research in operations Eur. J. Oper. Res. 231 2 2013 245 256
    • (2013) Eur. J. Oper. Res. , vol.231 , Issue.2 , pp. 245-256
    • Seifert, D.1    Seifert, R.W.2    Protopappa-Sieke, M.3
  • 10
    • 84885175764 scopus 로고    scopus 로고
    • Optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment
    • H.N. Soni Optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment Int. J. Prod. Econ. 146 1 2013 259 268
    • (2013) Int. J. Prod. Econ. , vol.146 , Issue.1 , pp. 259-268
    • Soni, H.N.1
  • 11
    • 85027934014 scopus 로고    scopus 로고
    • Seller's optimal credit period and replenishment time in a supply chain with up-stream and down-stream trade credits
    • J.-T. Teng, and K.-R. Lou Seller's optimal credit period and replenishment time in a supply chain with up-stream and down-stream trade credits J. Global Optim. 53 3 2012 417 430
    • (2012) J. Global Optim. , vol.53 , Issue.3 , pp. 417-430
    • Teng, J.-T.1    Lou, K.-R.2
  • 12
    • 84901711193 scopus 로고    scopus 로고
    • Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs
    • In press
    • Teng, J.-T., Lou, K.-R., Wang, L., 2013. Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs. Int. J. Prod. Econ., In press, 〈http://dx.doi.org/10. 1016/j.ijpe.2013.10.012〉.
    • (2013) Int. J. Prod. Econ.
    • Teng, J.-T.1    Lou, K.-R.2    Wang, L.3
  • 13
    • 80052543129 scopus 로고    scopus 로고
    • Economic order quantity model with trade credit financing and non-decreasing demand
    • J.-T. Teng, J. Min, and Q. Pan Economic order quantity model with trade credit financing and non-decreasing demand Omega 40 3 2012 328 335
    • (2012) Omega , vol.40 , Issue.3 , pp. 328-335
    • Teng, J.-T.1    Min, J.2    Pan, Q.3
  • 14
    • 84864747147 scopus 로고    scopus 로고
    • Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits
    • A. Thangam Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits Int. J. Prod. Econ. 139 2 2012 459 472
    • (2012) Int. J. Prod. Econ. , vol.139 , Issue.2 , pp. 459-472
    • Thangam, A.1
  • 15
    • 84867483334 scopus 로고    scopus 로고
    • Determination of production run time and warranty length under system maintenance and trade credits
    • Y.-C. Tsao Determination of production run time and warranty length under system maintenance and trade credits Int. J. Syst. Sci. 43 12 2012 2351 2360
    • (2012) Int. J. Syst. Sci. , vol.43 , Issue.12 , pp. 2351-2360
    • Tsao, Y.-C.1
  • 16
    • 84883826373 scopus 로고    scopus 로고
    • Seller's optimal credit period and cycle time in a supply chain for deteriorating items with maximum lifetime
    • W.-C. Wang, J.-T. Teng, and K.-R. Lou Seller's optimal credit period and cycle time in a supply chain for deteriorating items with maximum lifetime Eur. J. Oper. Res. 232 2 2014 315 321
    • (2014) Eur. J. Oper. Res. , vol.232 , Issue.2 , pp. 315-321
    • Wang, W.-C.1    Teng, J.-T.2    Lou, K.-R.3
  • 17
    • 84877581623 scopus 로고    scopus 로고
    • A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits
    • J.C-P. Yu A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits Int. J. Prod. Econ. 143 2 2013 403 409
    • (2013) Int. J. Prod. Econ. , vol.143 , Issue.2 , pp. 403-409
    • Yu, J.C.-P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.