메뉴 건너뛰기




Volumn , Issue , 2014, Pages 82-91

Effort estimation in Agile Software Development: A systematic literature review

Author keywords

Agile software development; Effort estimation; Systematic literature review

Indexed keywords

COMPUTER APPLICATIONS; COMPUTER PROGRAMMING;

EID: 84905666395     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1145/2639490.2639503     Document Type: Conference Paper
Times cited : (198)

References (57)
  • 1
    • 33845788381 scopus 로고    scopus 로고
    • A systematic review of software development cost estimation studies
    • Jan
    • Jorgensen, M. and Shepperd, M. A Systematic Review of Software Development Cost Estimation Studies. Software Engineering, IEEE Transactions on, 33, 1(Jan.2007), 33-53.
    • (2007) Software Engineering, IEEE Transactions on , vol.33 , Issue.1 , pp. 33-53
    • Jorgensen, M.1    Shepperd, M.2
  • 2
    • 0034557951 scopus 로고    scopus 로고
    • Software development cost estimation approaches-A survey
    • Nov
    • Boehm, B., Abts, C. and Chulani, S. Software development cost estimation approaches-A survey. Ann. Softw. Eng., 10, 1-4 (Nov. 2000), 177-205.
    • (2000) Ann. Softw. Eng , vol.10 , Issue.1-4 , pp. 177-205
    • Boehm, B.1    Abts, C.2    Chulani, S.3
  • 4
    • 0141838535 scopus 로고    scopus 로고
    • A review of studies on expert estimation of software development effort
    • Feb
    • Jorgensen, M. A review of studies on expert estimation of software development effort. J. Syst. Softw., 70, 1-2 (Feb. 2004), 37-60.
    • (2004) J. Syst. Softw , vol.70 , Issue.1-2 , pp. 37-60
    • Jorgensen, M.1
  • 5
    • 80055086827 scopus 로고    scopus 로고
    • Systematic literature review of machine learning based software development effort estimation models
    • Jan
    • Wen, J., Li, S., Lin, Z., Hu, Y. and Huang, C. Systematic literature review of machine learning based software development effort estimation models. Inf. Softw. Technol., 54, 1 (Jan. 2012), 41-59.
    • (2012) Inf. Softw. Technol , vol.54 , Issue.1 , pp. 41-59
    • Wen, J.1    Li, S.2    Lin, Z.3    Hu, Y.4    Huang, C.5
  • 9
    • 34548122445 scopus 로고    scopus 로고
    • Planning poker or how to avoid analysis paralysis while release planning
    • Grenning, J. Planning poker or how to avoid analysis paralysis while release planning. Hawthorn Woods: Renaissance Software Consulting, 3(2002).
    • (2002) Hawthorn Woods: Renaissance Software Consulting , vol.3
    • Grenning, J.1
  • 10
    • 34247603633 scopus 로고    scopus 로고
    • An empirical study of using planning poker for user story estimation
    • Minneapolis, MN
    • Haugen, N. C. An empirical study of using planning poker for user story estimation. In Agile Conference (Minneapolis, MN, 2006). 23-31.
    • (2006) Agile Conference , pp. 23-31
    • Haugen, N.C.1
  • 12
    • 53949103548 scopus 로고    scopus 로고
    • Using planning poker for combining expert estimates in software projects
    • Dec
    • Moløkken-Østvold, K., Haugen, N. C. and Benestad, H. C. Using planning poker for combining expert estimates in software projects. Journal of Systems and Software, 81, 12 (Dec. 2008), 2106-2117.
    • (2008) Journal of Systems and Software , vol.81 , Issue.12 , pp. 2106-2117
    • Moløkken-Østvold, K.1    Haugen, N.C.2    Benestad, H.C.3
  • 13
    • 84863099260 scopus 로고    scopus 로고
    • On using planning poker for estimating user stories
    • Sep
    • Mahnič, V. and Hovelja, T. On using planning poker for estimating user stories. Journal of Systems and Software, 85, 9 (Sep. 2012), 2086-2095.
    • (2012) Journal of Systems and Software , vol.85 , Issue.9 , pp. 2086-2095
    • Mahnič, V.1    Hovelja, T.2
  • 15
    • 84898951497 scopus 로고    scopus 로고
    • Efficiency factor and risk factor based user case point test effort estimation model compatible with agile software development
    • Yogyakarta, Indonesia
    • Parvez, A. W. M. M. Efficiency factor and risk factor based user case point test effort estimation model compatible with agile software development. In Proceedings of International Conference on Information Technology and Electrical Engineering (Yogyakarta, Indonesia, 2013).113-118.
    • (2013) Proceedings of International Conference on Information Technology and Electrical Engineering , pp. 113-118
    • Parvez, A.W.M.M.1
  • 16
  • 17
    • 44649189162 scopus 로고    scopus 로고
    • Empirical studies of agile software development: A systematic review
    • Aug
    • Dybå, T. and Dingsøyr, T. Empirical studies of agile software development: A systematic review. Information and Software Technology, 50, 9-10 (Aug. 2008), 833-859.
    • (2008) Information and Software Technology , vol.50 , Issue.9-10 , pp. 833-859
    • Dybå, T.1    Dingsøyr, T.2
  • 19
    • 84867499567 scopus 로고    scopus 로고
    • Global software engineering and agile practices: A systematic review
    • Oct
    • Jalali, S. and Wohlin, C. Global software engineering and agile practices: a systematic review. Journal of Software: Evolution and Process, 24, 6 (Oct. 2012), 643-659.
    • (2012) Journal of Software: Evolution and Process , vol.24 , Issue.6 , pp. 643-659
    • Jalali, S.1    Wohlin, C.2
  • 24
    • 79953724329 scopus 로고    scopus 로고
    • Using mapping studies as the basis for further research-A participant-observer case study
    • June
    • Kitchenham, B. A., Budgenb, D. and Pearl Brereton. Using mapping studies as the basis for further research-A participant-observer case study. Information and Software Technology, 53, 6 (June. 2011), 638-651.
    • (2011) Information and Software Technology , vol.53 , Issue.6 , pp. 638-651
    • Kitchenham, B.A.1    Budgenb, D.2    Brereton, P.3
  • 26
    • 65549122110 scopus 로고    scopus 로고
    • Incorporating vital factors in agile estimation through algorithmic method
    • Bhalerao, S. and Ingle, M. Incorporating Vital Factors in Agile Estimation through Algorithmic Method. IJCSA, 6, 1 (2009), 85-97.
    • (2009) IJCSA , vol.6 , Issue.1 , pp. 85-97
    • Bhalerao, S.1    Ingle, M.2
  • 28
  • 30
    • 80051498459 scopus 로고    scopus 로고
    • A case study on agile estimating and planning using scrum
    • Mahnic, V. A case study on agile estimating and planning using scrum. Electronics and Electrical Engineering, 111, 5 (2011).123-128.
    • (2011) Electronics and Electrical Engineering , vol.111 , Issue.5 , pp. 123-128
    • Mahnic, V.1
  • 37
    • 84905664971 scopus 로고    scopus 로고
    • An estimation method of iteration periods in xp project
    • Wang, X.-h. and Zhao, M. An estimation method of iteration periods in XP project. Journal of Computer Applications, 27, 5 (2007), 1248-1250.
    • (2007) Journal of Computer Applications , vol.27 , Issue.5 , pp. 1248-1250
    • Wang, X.-H.1    Zhao, M.2
  • 38
    • 84870378581 scopus 로고    scopus 로고
    • Estimating agile software project effort: An empirical study
    • Toronto, Canada
    • Cao, L. Estimating agile software project effort: An empirical study. In Proceedings of 14th Americas Conference on IS(Toronto, Canada, 2008).1907-1916.
    • (2008) Proceedings of 14th Americas Conference on IS , pp. 1907-1916
    • Cao, L.1
  • 40
    • 60449107898 scopus 로고    scopus 로고
    • Predicting project velocity in xp using a learning dynamic bayesian network model
    • Jan-Feb
    • Hearty, P., Fenton, N., Marquez, D. and Neil, M. Predicting Project Velocity in XP Using a Learning Dynamic Bayesian Network Model. Software Engineering, IEEE Transactions on, 35, 1 (Jan-Feb. 2009), 124-137.
    • (2009) Software Engineering, IEEE Transactions on , vol.35 , Issue.1 , pp. 124-137
    • Hearty, P.1    Fenton, N.2    Marquez, D.3    Neil, M.4
  • 45
    • 34247582998 scopus 로고    scopus 로고
    • Appropriate agile measurement: Using metrics and diagnostics to deliver business value
    • Minneapolis
    • Hartmann, D. and Dymond, R. Appropriate agile measurement: using metrics and diagnostics to deliver business value. In Proceedings of Agile Conference (Minneapolis, 2006).126-131.
    • (2006) Proceedings of Agile Conference , pp. 126-131
    • Hartmann, D.1    Dymond, R.2
  • 48
    • 0346896353 scopus 로고    scopus 로고
    • An empirical validation of object-oriented metrics in two different iterative software processes
    • Nov
    • Alshayeb, M. and Li, W. An Empirical Validation of Object-Oriented Metrics in Two Different Iterative Software Processes. IEEE Transactions on Software Engineering, 29, 11(Nov. 2003), 1043-1049.
    • (2003) IEEE Transactions on Software Engineering , vol.29 , Issue.11 , pp. 1043-1049
    • Alshayeb, M.1    Li, W.2
  • 50
    • 33847739411 scopus 로고    scopus 로고
    • Estimating in actual time [extreme programming]
    • Denver, Colorado
    • Hohman, M. M. Estimating in actual time [extreme programming]. In Proceedings of Agile Conference(Denver, Colorado,2005).132-138.
    • (2005) Proceedings of Agile Conference , pp. 132-138
    • Hohman, M.M.1
  • 51
  • 53
    • 84878708965 scopus 로고    scopus 로고
    • Agile estimation with monte carlo simulation
    • Limerick, Ireland
    • Zang, J. Agile estimation with monte carlo simulation. In Proceedings of XP 2008(Limerick, Ireland, 2008).172-179.
    • (2008) Proceedings of XP 2008 , pp. 172-179
    • Zang, J.1
  • 57
    • 67649403376 scopus 로고    scopus 로고
    • A critique of how we measure and interpret the accuracy of software development effort estimation
    • Information Processing Society of Japan (Nagoya
    • Jørgensen, Magne.A critique of how we measure and interpret the accuracy of software development effort estimation.In First International Workshop on Software Productivity Analysis and Cost Estimation. Information Processing Society of Japan (Nagoya. 2007),15-22.
    • (2007) First International Workshop on Software Productivity Analysis and Cost Estimation , pp. 15-22
    • Jørgensen, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.