메뉴 건너뛰기




Volumn 34, Issue 9, 2014, Pages 1683-1692

Quantifying construction and demolition waste: An analytical review

Author keywords

Construction and demolition waste; Quantification methodology; Review

Indexed keywords

CLASSIFICATION (OF INFORMATION); DECISION TREES; DEMOLITION; REVIEWS;

EID: 84905591201     PISSN: 0956053X     EISSN: 18792456     Source Type: Journal    
DOI: 10.1016/j.wasman.2014.05.010     Document Type: Article
Times cited : (289)

References (70)
  • 1
    • 84857278851 scopus 로고    scopus 로고
    • A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory
    • Al-Sari M.I., Al-Khatib I.A., Avraamides M., Fatta-Kassinos D. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory. Waste Manage. Res. 2012, 30(2):122-136.
    • (2012) Waste Manage. Res. , vol.30 , Issue.2 , pp. 122-136
    • Al-Sari, M.I.1    Al-Khatib, I.A.2    Avraamides, M.3    Fatta-Kassinos, D.4
  • 2
    • 80054853534 scopus 로고    scopus 로고
    • A web-based Decision Support System for the optimal management of construction and demolition waste
    • Banias G., Achillas C., Vlachokostas C., Moussiopoulos N., Papaioannou I. A web-based Decision Support System for the optimal management of construction and demolition waste. Waste Manage. (Oxford) 2011, 31(12):2497-2502.
    • (2011) Waste Manage. (Oxford) , vol.31 , Issue.12 , pp. 2497-2502
    • Banias, G.1    Achillas, C.2    Vlachokostas, C.3    Moussiopoulos, N.4    Papaioannou, I.5
  • 3
    • 33744941582 scopus 로고    scopus 로고
    • A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia
    • Begum R.A., Siwar C., Pereira J.J., Jaafar A.H. A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resour. Conserv. Recycl. 2006, 48(1):86-98.
    • (2006) Resour. Conserv. Recycl. , vol.48 , Issue.1 , pp. 86-98
    • Begum, R.A.1    Siwar, C.2    Pereira, J.J.3    Jaafar, A.H.4
  • 4
    • 35548989352 scopus 로고    scopus 로고
    • Modelling municipal solid waste generation: a review
    • Beigl P., Lebersorger S., Salhofer S. Modelling municipal solid waste generation: a review. Waste Manage. (Oxford) 2008, 28(1):200-214.
    • (2008) Waste Manage. (Oxford) , vol.28 , Issue.1 , pp. 200-214
    • Beigl, P.1    Lebersorger, S.2    Salhofer, S.3
  • 5
    • 34548361341 scopus 로고    scopus 로고
    • Projection of construction and demolition waste in Norway
    • Bergsdal H., Bohne R.A., Brattebo H. Projection of construction and demolition waste in Norway. J. Ind. Ecol. 2007, 11(3):27-39.
    • (2007) J. Ind. Ecol. , vol.11 , Issue.3 , pp. 27-39
    • Bergsdal, H.1    Bohne, R.A.2    Brattebo, H.3
  • 6
    • 0030406151 scopus 로고    scopus 로고
    • Construction waste: quantification and source evaluation
    • Bossink B.A.G., Brouwers H.J.H. Construction waste: quantification and source evaluation. J. Constr. Eng. Manage. 1996, 122(1):55-60.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 55-60
    • Bossink, B.A.G.1    Brouwers, H.J.H.2
  • 8
    • 84881229920 scopus 로고    scopus 로고
    • A BIM-based system for demolition and renovation waste estimation and planning
    • Cheng J.C.P., Ma L.Y.H. A BIM-based system for demolition and renovation waste estimation and planning. Waste Manage. (Oxford) 2013, 33(6):1539-1551.
    • (2013) Waste Manage. (Oxford) , vol.33 , Issue.6 , pp. 1539-1551
    • Cheng, J.C.P.1    Ma, L.Y.H.2
  • 9
    • 77957754015 scopus 로고    scopus 로고
    • Estimating construction and demolition debris generation using a materials flow analysis approach
    • Cochran K.M., Townsend T.G. Estimating construction and demolition debris generation using a materials flow analysis approach. Waste Manage. (Oxford) 2010, 30(11):2247-2254.
    • (2010) Waste Manage. (Oxford) , vol.30 , Issue.11 , pp. 2247-2254
    • Cochran, K.M.1    Townsend, T.G.2
  • 10
    • 34247491058 scopus 로고    scopus 로고
    • Estimation of regional building-related C&D debris generation and composition: case study for Florida, US
    • Cochran K., Townsend T., Reinhart D., Heck H. Estimation of regional building-related C&D debris generation and composition: case study for Florida, US. Waste Manage. 2007, 27(7):921-931.
    • (2007) Waste Manage. , vol.27 , Issue.7 , pp. 921-931
    • Cochran, K.1    Townsend, T.2    Reinhart, D.3    Heck, H.4
  • 11
    • 80052371360 scopus 로고    scopus 로고
    • Distribution of materials in construction and demolition waste in Portugal
    • Coelho A., de Brito J. Distribution of materials in construction and demolition waste in Portugal. Waste Manage. Res. 2011, 29(8):843-853.
    • (2011) Waste Manage. Res. , vol.29 , Issue.8 , pp. 843-853
    • Coelho, A.1    de Brito, J.2
  • 12
    • 79959909758 scopus 로고    scopus 로고
    • Generation of construction and demolition waste in Portugal
    • Coelho A., de Brito J. Generation of construction and demolition waste in Portugal. Waste Manage. Res. 2011, 29(7):739-750.
    • (2011) Waste Manage. Res. , vol.29 , Issue.7 , pp. 739-750
    • Coelho, A.1    de Brito, J.2
  • 14
    • 80053359811 scopus 로고    scopus 로고
    • Construction and demolition waste generation and management in Lisbon (Portugal)
    • De Melo A.B., Goncalves A.F., Martins I.M. Construction and demolition waste generation and management in Lisbon (Portugal). Resour. Conserv. Recycl. 2011, 55(12):1252-1264.
    • (2011) Resour. Conserv. Recycl. , vol.55 , Issue.12 , pp. 1252-1264
    • De Melo, A.B.1    Goncalves, A.F.2    Martins, I.M.3
  • 15
  • 16
    • 84876213332 scopus 로고    scopus 로고
    • EPD, (accessed 08.12.12).
    • EPD, 2012. Construction Waste. (accessed 08.12.12). http://www.epd.gov.hk/epd/misc/cdm/introduction.htm#.
    • (2012) Construction Waste
  • 17
    • 84905570426 scopus 로고    scopus 로고
    • EPD, (accessed 07.02.14).
    • EPD, 2014. Hong Kong Waste Treatment and Disposal Statistics. (accessed 07.02.14). http://www.epd.gov.hk/epd/english/environmentinhk/waste/data/stat_treat.html.
    • (2014) Hong Kong Waste Treatment and Disposal Statistics
  • 19
    • 1842699306 scopus 로고    scopus 로고
    • Material waste in building industry: main causes and prevention
    • Formoso C.T., Soibelman L., Claudia, Isatto E.L. Material waste in building industry: main causes and prevention. J. Constr. Eng. Manage. 2002, 128(4):316-325.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 316-325
    • Formoso, C.T.1    Soibelman, L.2    Claudia3    Isatto, E.L.4
  • 20
    • 0028497885 scopus 로고
    • Source Evaluation of Solid Waste in Building Construction
    • Gavilan R.M., Bernold L.E. Source Evaluation of Solid Waste in Building Construction. J. Constr. Eng. Manage. 1994, 120(3):536-552.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.3 , pp. 536-552
    • Gavilan, R.M.1    Bernold, L.E.2
  • 21
    • 39749181110 scopus 로고    scopus 로고
    • Managing construction waste on-site through system dynamics modelling: the case of Hong Kong
    • Hao J.L., Hill M.J., Shen L.Y. Managing construction waste on-site through system dynamics modelling: the case of Hong Kong. Eng. Constr. Architec. Manage. 2008, 15(2):103-113.
    • (2008) Eng. Constr. Architec. Manage. , vol.15 , Issue.2 , pp. 103-113
    • Hao, J.L.1    Hill, M.J.2    Shen, L.Y.3
  • 22
    • 34548825121 scopus 로고    scopus 로고
    • Where will large amounts of materials accumulated within the economy go? - a material flow analysis of construction minerals for Japan
    • Hashimoto S., Tanikawa H., Moriguchi Y. Where will large amounts of materials accumulated within the economy go? - a material flow analysis of construction minerals for Japan. Waste Manage. (Oxford) 2007, 27(12):1725-1738.
    • (2007) Waste Manage. (Oxford) , vol.27 , Issue.12 , pp. 1725-1738
    • Hashimoto, S.1    Tanikawa, H.2    Moriguchi, Y.3
  • 23
    • 69949189218 scopus 로고    scopus 로고
    • Framework for estimating potential wastes and secondary resources accumulated within an economy - a case study of construction minerals in Japan
    • Hashimoto S., Tanikawa H., Moriguchi Y. Framework for estimating potential wastes and secondary resources accumulated within an economy - a case study of construction minerals in Japan. Waste Manage. (Oxford) 2009, 29(11):2859-2866.
    • (2009) Waste Manage. (Oxford) , vol.29 , Issue.11 , pp. 2859-2866
    • Hashimoto, S.1    Tanikawa, H.2    Moriguchi, Y.3
  • 25
    • 84881297414 scopus 로고    scopus 로고
    • Potentials for cascading of recovered wood from building deconstruction - a case study for south-east Germany
    • Hoglmeier K., Weber-Blaschke G., Richter K. Potentials for cascading of recovered wood from building deconstruction - a case study for south-east Germany. Resour. Conserv. Recycl. 2013, 78:81-91.
    • (2013) Resour. Conserv. Recycl. , vol.78 , pp. 81-91
    • Hoglmeier, K.1    Weber-Blaschke, G.2    Richter, K.3
  • 26
    • 0036524543 scopus 로고    scopus 로고
    • Modeling materials flow of waste concrete from construction and demolition wastes in Taiwan
    • Hsiao T.Y., Huang Y.T., Yu Y.H., Wernick I.K. Modeling materials flow of waste concrete from construction and demolition wastes in Taiwan. Resources Policy 2002, 28(1-2):39-47.
    • (2002) Resources Policy , vol.28 , Issue.1-2 , pp. 39-47
    • Hsiao, T.Y.1    Huang, Y.T.2    Yu, Y.H.3    Wernick, I.K.4
  • 27
    • 77955853247 scopus 로고    scopus 로고
    • Input, stocks and output flows of urban residential building system in Beijing city, China from 1949 to 2008
    • Hu D., You F., Zhao Y.H., Yuan Y., Liu T.X., Cao A.X., Wang Z., Zhang J.L. Input, stocks and output flows of urban residential building system in Beijing city, China from 1949 to 2008. Resour. Conserv. Recycl. 2010, 54(12):1177-1188.
    • (2010) Resour. Conserv. Recycl. , vol.54 , Issue.12 , pp. 1177-1188
    • Hu, D.1    You, F.2    Zhao, Y.H.3    Yuan, Y.4    Liu, T.X.5    Cao, A.X.6    Wang, Z.7    Zhang, J.L.8
  • 28
    • 55549143657 scopus 로고    scopus 로고
    • Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong
    • Jaillon L., Poon C.S., Chiang Y.H. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Manage. (Oxford) 2009, 29(1):309-320.
    • (2009) Waste Manage. (Oxford) , vol.29 , Issue.1 , pp. 309-320
    • Jaillon, L.1    Poon, C.S.2    Chiang, Y.H.3
  • 29
    • 9644252862 scopus 로고    scopus 로고
    • Environmental management of construction and demolition waste in Kuwait
    • Kartam N., Al-Mutairi N., Al-Ghusain I., Al-Humoud J. Environmental management of construction and demolition waste in Kuwait. Waste Manage. (Oxford) 2004, 24(10):1049-1059.
    • (2004) Waste Manage. (Oxford) , vol.24 , Issue.10 , pp. 1049-1059
    • Kartam, N.1    Al-Mutairi, N.2    Al-Ghusain, I.3    Al-Humoud, J.4
  • 30
    • 78649814971 scopus 로고    scopus 로고
    • A novel methodology to estimate the evolution of construction waste in construction sites
    • Katz A., Baum H. A novel methodology to estimate the evolution of construction waste in construction sites. Waste Manage. (Oxford) 2011, 31(2):353-358.
    • (2011) Waste Manage. (Oxford) , vol.31 , Issue.2 , pp. 353-358
    • Katz, A.1    Baum, H.2
  • 31
    • 58849142122 scopus 로고    scopus 로고
    • The development of construction waste production indicators for the Irish construction industry
    • Zamorano, M., Brebbia, C.A., Kungolos, A., Popov, V., Itoh, H. (Eds.), Waste Management and the Environment Iv.
    • Kelly, M., Hanahoe, J., 2008. The development of construction waste production indicators for the Irish construction industry, in: Zamorano, M., Brebbia, C.A., Kungolos, A., Popov, V., Itoh, H. (Eds.), Waste Management and the Environment Iv, pp. 499-508.
    • (2008) , pp. 499-508
    • Kelly, M.1    Hanahoe, J.2
  • 32
    • 56349148222 scopus 로고    scopus 로고
    • Estimation of construction waste generation and management in Thailand
    • Kofoworola O.F., Gheewala S.H. Estimation of construction waste generation and management in Thailand. Waste Manage. (Oxford) 2009, 29(2):731-738.
    • (2009) Waste Manage. (Oxford) , vol.29 , Issue.2 , pp. 731-738
    • Kofoworola, O.F.1    Gheewala, S.H.2
  • 35
    • 75849117586 scopus 로고    scopus 로고
    • Estimation of the annual production and composition of C&D Debris in Galicia (Spain)
    • Lage I.M., Abella F.M., Herrero C.V., Ordonez J.L.P. Estimation of the annual production and composition of C&D Debris in Galicia (Spain). Waste Manage. (Oxford) 2010, 30(4):636-645.
    • (2010) Waste Manage. (Oxford) , vol.30 , Issue.4 , pp. 636-645
    • Lage, I.M.1    Abella, F.M.2    Herrero, C.V.3    Ordonez, J.L.P.4
  • 36
    • 46449104674 scopus 로고    scopus 로고
    • Composition and characteristics of construction waste generated by residential housing project
    • Lau H.H., Whyte A., Law P.L. Composition and characteristics of construction waste generated by residential housing project. Int. J. Environ. Res. 2008, 2(3):261-268.
    • (2008) Int. J. Environ. Res. , vol.2 , Issue.3 , pp. 261-268
    • Lau, H.H.1    Whyte, A.2    Law, P.L.3
  • 37
    • 84884503509 scopus 로고    scopus 로고
    • Web-based construction waste estimation system for building construction projects
    • Li Y., Zhang X. Web-based construction waste estimation system for building construction projects. Autom. Constr. 2013, 35:142-156.
    • (2013) Autom. Constr. , vol.35 , pp. 142-156
    • Li, Y.1    Zhang, X.2
  • 38
    • 84875467149 scopus 로고    scopus 로고
    • A model for estimating construction waste generation index for building project in China
    • Li J.R., Ding Z.K., Mi X.M., Wang J.Y. A model for estimating construction waste generation index for building project in China. Resour. Conserv. Recycl. 2013, 74:20-26.
    • (2013) Resour. Conserv. Recycl. , vol.74 , pp. 20-26
    • Li, J.R.1    Ding, Z.K.2    Mi, X.M.3    Wang, J.Y.4
  • 39
    • 79954726763 scopus 로고    scopus 로고
    • A model for quantifying construction waste in projects according to the European waste list
    • Llatas C. A model for quantifying construction waste in projects according to the European waste list. Waste Manage. (Oxford) 2011, 31(6):1261-1276.
    • (2011) Waste Manage. (Oxford) , vol.31 , Issue.6 , pp. 1261-1276
    • Llatas, C.1
  • 40
    • 84875708926 scopus 로고    scopus 로고
    • Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review
    • Lu W., Tam V.W.Y. Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review. Renew. Sustain. Energy Rev. 2013, 23:214-223.
    • (2013) Renew. Sustain. Energy Rev. , vol.23 , pp. 214-223
    • Lu, W.1    Tam, V.W.Y.2
  • 41
    • 79954674176 scopus 로고    scopus 로고
    • A framework for understanding waste management studies in construction
    • Lu W.S., Yuan H.P. A framework for understanding waste management studies in construction. Waste Manage. (Oxford) 2011, 31(6):1252-1260.
    • (2011) Waste Manage. (Oxford) , vol.31 , Issue.6 , pp. 1252-1260
    • Lu, W.S.1    Yuan, H.P.2
  • 42
    • 79951558224 scopus 로고    scopus 로고
    • An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China
    • Lu W.S., Yuan H.P., Li J.R., Hao J.J.L., Mi X.M., Ding Z.K. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. Waste Manage. 2011, 31(4):680-687.
    • (2011) Waste Manage. , vol.31 , Issue.4 , pp. 680-687
    • Lu, W.S.1    Yuan, H.P.2    Li, J.R.3    Hao, J.J.L.4    Mi, X.M.5    Ding, Z.K.6
  • 44
    • 78651400687 scopus 로고    scopus 로고
    • Quantification methods for construction waste generation at construction sites: a review
    • Masudi A.F., Hassan C.R.C., Mahmood N.Z., Mokhtar S.N., Sulaiman N.M. Quantification methods for construction waste generation at construction sites: a review. Adv. Mater. Res. 2011, 163-167:4564-4569.
    • (2011) Adv. Mater. Res. , pp. 4564-4569
    • Masudi, A.F.1    Hassan, C.R.C.2    Mahmood, N.Z.3    Mokhtar, S.N.4    Sulaiman, N.M.5
  • 45
    • 0027752456 scopus 로고
    • A forecast model of refuse tonnage with recapture and uncertainty bounds
    • McBean E.A., Fortin M.H.P. A forecast model of refuse tonnage with recapture and uncertainty bounds. Waste Manage. Res. 1993, 11(5):373-385.
    • (1993) Waste Manage. Res. , vol.11 , Issue.5 , pp. 373-385
    • McBean, E.A.1    Fortin, M.H.P.2
  • 46
    • 0002962578 scopus 로고    scopus 로고
    • Implementing a waste management plan during the construction phase of a project: a case study
    • McDonald B., Smithers M. Implementing a waste management plan during the construction phase of a project: a case study. Constr. Manage. Econom. 1998, 16(1):71-78.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.1 , pp. 71-78
    • McDonald, B.1    Smithers, M.2
  • 47
    • 84876702139 scopus 로고    scopus 로고
    • Selective classification and quantification model of C&D waste from material resources consumed in residential building construction
    • Mercader-Moyano P., Ramírez-de-Arellano-Agudo A. Selective classification and quantification model of C&D waste from material resources consumed in residential building construction. Waste Manage. Res. 2013, 31(5):458-474.
    • (2013) Waste Manage. Res. , vol.31 , Issue.5 , pp. 458-474
    • Mercader-Moyano, P.1    Ramírez-de-Arellano-Agudo, A.2
  • 49
    • 84891685309 scopus 로고    scopus 로고
    • Study of site's construction waste in Batu Pahat, Johor
    • Nagapan S., Rahman I.A., Asmi A., Adnan N.F. Study of site's construction waste in Batu Pahat, Johor. Proc. Eng. 2013, 53:99-103.
    • (2013) Proc. Eng. , vol.53 , pp. 99-103
    • Nagapan, S.1    Rahman, I.A.2    Asmi, A.3    Adnan, N.F.4
  • 50
    • 0002472179 scopus 로고    scopus 로고
    • Strategies for successful construction and demolition waste recycling operations
    • Peng C.L., Scorpio D.E., Kibert C.J. Strategies for successful construction and demolition waste recycling operations. Constr. Manage. Econom. 1997, 15(1):49-58.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.1 , pp. 49-58
    • Peng, C.L.1    Scorpio, D.E.2    Kibert, C.J.3
  • 51
    • 0031439334 scopus 로고    scopus 로고
    • Management and recycling of demolition waste in Hong Kong
    • Poon C.S. Management and recycling of demolition waste in Hong Kong. Waste Manage. Res. 1997, 15(6):561-572.
    • (1997) Waste Manage. Res. , vol.15 , Issue.6 , pp. 561-572
    • Poon, C.S.1
  • 52
    • 3242699509 scopus 로고    scopus 로고
    • Reducing building waste at construction sites in Hong Kong
    • Poon C.S., Yu A.T.W., Jaillon L. Reducing building waste at construction sites in Hong Kong. Constr. Manage. Econom. 2004, 22(5):461-470.
    • (2004) Constr. Manage. Econom. , vol.22 , Issue.5 , pp. 461-470
    • Poon, C.S.1    Yu, A.T.W.2    Jaillon, L.3
  • 53
    • 8644220467 scopus 로고    scopus 로고
    • Minimizing demolition wastes in Hong Kong public housing projects
    • Poon C.S., Yu A.T.W., See S.C., Cheung E. Minimizing demolition wastes in Hong Kong public housing projects. Constr. Manage. Econom. 2004, 22(8):799-805.
    • (2004) Constr. Manage. Econom. , vol.22 , Issue.8 , pp. 799-805
    • Poon, C.S.1    Yu, A.T.W.2    See, S.C.3    Cheung, E.4
  • 54
    • 84857265380 scopus 로고    scopus 로고
    • Estimation of construction and demolition waste volume generation in new residential buildings in Spain
    • Saez P.V., Merino M.D., Porras-Amores C. Estimation of construction and demolition waste volume generation in new residential buildings in Spain. Waste Manage. Res. 2012, 30(2):137-146.
    • (2012) Waste Manage. Res. , vol.30 , Issue.2 , pp. 137-146
    • Saez, P.V.1    Merino, M.D.2    Porras-Amores, C.3
  • 55
    • 17244374765 scopus 로고    scopus 로고
    • Application of system dynamics for assessment of sustainable performance of construction projects
    • Shen L.Y., Wu Y.Z., Chan E.H.W., Hao J.L. Application of system dynamics for assessment of sustainable performance of construction projects. J. Zhejiang Univ. Sci. A 2005, 6(4):339-349.
    • (2005) J. Zhejiang Univ. Sci. A , vol.6 , Issue.4 , pp. 339-349
    • Shen, L.Y.1    Wu, Y.Z.2    Chan, E.H.W.3    Hao, J.L.4
  • 56
    • 33749448305 scopus 로고    scopus 로고
    • Estimation and forecasting of concrete debris amount in China
    • Shi J., Xu Y. Estimation and forecasting of concrete debris amount in China. Resour. Conserv. Recycl. 2006, 49(2):147-158.
    • (2006) Resour. Conserv. Recycl. , vol.49 , Issue.2 , pp. 147-158
    • Shi, J.1    Xu, Y.2
  • 58
    • 84863694377 scopus 로고    scopus 로고
    • GIS-based dynamic construction site material layout evaluation for building renovation projects
    • Su X., Andoh A.R., Cai H., Pan J., Kandil A., Said H.M. GIS-based dynamic construction site material layout evaluation for building renovation projects. Autom. Constr 2012, 27:40-49.
    • (2012) Autom. Constr , vol.27 , pp. 40-49
    • Su, X.1    Andoh, A.R.2    Cai, H.3    Pan, J.4    Kandil, A.5    Said, H.M.6
  • 59
    • 40849086243 scopus 로고    scopus 로고
    • On the effectiveness in implementing a waste-management-plan method in construction
    • Tam V.W.Y. On the effectiveness in implementing a waste-management-plan method in construction. Waste Manage. (Oxford) 2008, 28(6):1072-1080.
    • (2008) Waste Manage. (Oxford) , vol.28 , Issue.6 , pp. 1072-1080
    • Tam, V.W.Y.1
  • 60
    • 33646397830 scopus 로고    scopus 로고
    • A review on the viable technology for construction waste recycling
    • Tam V.W., Tam C.M. A review on the viable technology for construction waste recycling. Resour. Conserv. Recycl. 2006, 47(3):209-221.
    • (2006) Resour. Conserv. Recycl. , vol.47 , Issue.3 , pp. 209-221
    • Tam, V.W.1    Tam, C.M.2
  • 61
    • 84859487358 scopus 로고    scopus 로고
    • Construction demolition waste management in Lebanon, International Conference on Sustainable Design and Construction 2011: Integrating Sustainability Practices in the Construction Industry, ICSDC 2011, March 23, 2011 - March 25, 2011. American Society of Civil Engineers (ASCE), Kansas City, MO, United states.
    • Tamraz, S.N., Srour, I.M., Chehab, G.R., 2012. Construction demolition waste management in Lebanon, International Conference on Sustainable Design and Construction 2011: Integrating Sustainability Practices in the Construction Industry, ICSDC 2011, March 23, 2011 - March 25, 2011. American Society of Civil Engineers (ASCE), Kansas City, MO, United states, pp. 375-383.
    • (2012) , pp. 375-383
    • Tamraz, S.N.1    Srour, I.M.2    Chehab, G.R.3
  • 62
    • 0035501639 scopus 로고    scopus 로고
    • A theory of waste behaviour in the construction industry
    • Teo M.M.M., Loosemore M. A theory of waste behaviour in the construction industry. Constr. Manage. Econom. 2001, 19(7):741-751.
    • (2001) Constr. Manage. Econom. , vol.19 , Issue.7 , pp. 741-751
    • Teo, M.M.M.1    Loosemore, M.2
  • 63
    • 0030445918 scopus 로고    scopus 로고
    • Environmental impact of demolition waste - an overview on 10 years of research and experience
    • Trankler J.O.V., Walker I., Dohmann M. Environmental impact of demolition waste - an overview on 10 years of research and experience. Waste Manage. (Oxford) 1996, 16(1-3):21-26.
    • (1996) Waste Manage. (Oxford) , vol.16 , Issue.1-3 , pp. 21-26
    • Trankler, J.O.V.1    Walker, I.2    Dohmann, M.3
  • 64
    • 9744222868 scopus 로고    scopus 로고
    • A systems analysis tool for construction and demolition wastes management
    • Wang J.Y., Touran A., Christoforou C., Fadlalla H. A systems analysis tool for construction and demolition wastes management. Waste Manage. (Oxford) 2004, 24(10):989-997.
    • (2004) Waste Manage. (Oxford) , vol.24 , Issue.10 , pp. 989-997
    • Wang, J.Y.1    Touran, A.2    Christoforou, C.3    Fadlalla, H.4
  • 65
    • 77956309717 scopus 로고    scopus 로고
    • Modeling construction waste generation towards sustainability, Construction Research Congress 2010: Innovation for Reshaping Construction Practice
    • May 8, 2010 - May 10, 2010. Banff, AB, Canada.
    • Wimalasena, B.A.D.S., Ruwanpura, J.Y., Hettiaratchi, J.P.A., 2010. Modeling construction waste generation towards sustainability, Construction Research Congress 2010: Innovation for Reshaping Construction Practice, May 8, 2010 - May 10, 2010. American Society of Civil Engineers, Banff, AB, Canada, pp. 1498-1507.
    • (2010) American Society of Civil Engineers , pp. 1498-1507
    • Wimalasena, B.A.D.S.1    Ruwanpura, J.Y.2    Hettiaratchi, J.P.A.3
  • 66
    • 77956143841 scopus 로고    scopus 로고
    • Estimating the generation of construction and demolition waste by using system dynamics: a proposed model
    • June 18, 2010 - June 20, 2010. IEEE, Chengdu, China.
    • Ye, G., Yuan, H.P., Wang, H.X., 2010. Estimating the generation of construction and demolition waste by using system dynamics: a proposed model. In: The International Conference on Environmental Pollution and Public Health (EPPH2010), June 18, 2010 - June 20, 2010. IEEE, Chengdu, China, pp. 1-4.
    • (2010) The International Conference on Environmental Pollution and Public Health (EPPH2010) , pp. 1-4
    • Ye, G.1    Yuan, H.P.2    Wang, H.X.3
  • 67
    • 0029659161 scopus 로고    scopus 로고
    • A methodology for quantifying the volume of construction waste
    • Yost P.A., Halstead J.M. A methodology for quantifying the volume of construction waste. Waste Manage. Res. 1996, 14(5):453-461.
    • (1996) Waste Manage. Res. , vol.14 , Issue.5 , pp. 453-461
    • Yost, P.A.1    Halstead, J.M.2
  • 68
    • 79951551147 scopus 로고    scopus 로고
    • Trend of the research on construction and demolition waste management
    • Yuan H.P., Shen L.Y. Trend of the research on construction and demolition waste management. Waste Manage. (Oxford) 2011, 31(4):670-679.
    • (2011) Waste Manage. (Oxford) , vol.31 , Issue.4 , pp. 670-679
    • Yuan, H.P.1    Shen, L.Y.2
  • 69
    • 76349109476 scopus 로고    scopus 로고
    • Evaluation of the economic feasibility for the recycling of construction and demolition waste in China - the case of Chongqing
    • Zhao W., Leeftink R.B., Rotter V.S. Evaluation of the economic feasibility for the recycling of construction and demolition waste in China - the case of Chongqing. Resour. Conserv. Recycl. 2010, 54(6):377-389.
    • (2010) Resour. Conserv. Recycl. , vol.54 , Issue.6 , pp. 377-389
    • Zhao, W.1    Leeftink, R.B.2    Rotter, V.S.3
  • 70
    • 80955178276 scopus 로고    scopus 로고
    • A system dynamics model for evaluating the alternative of type in construction and demolition waste recycling center - the case of Chongqing, China
    • Zhao W., Ren H., Rotter V.S. A system dynamics model for evaluating the alternative of type in construction and demolition waste recycling center - the case of Chongqing, China. Resour. Conserv. Recycl. 2011, 55(11):933-944.
    • (2011) Resour. Conserv. Recycl. , vol.55 , Issue.11 , pp. 933-944
    • Zhao, W.1    Ren, H.2    Rotter, V.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.