메뉴 건너뛰기




Volumn 65, Issue 6, 2014, Pages 967-975

Dynamic workforce allocation in a constrained flow shop with multi-agent system

Author keywords

Dynamic resource allocation; Multi agent system; Simulation; Workforce management

Indexed keywords

ASSEMBLY; ASSEMBLY MACHINES; CONSTRAINED OPTIMIZATION; ELECTROMECHANICAL DEVICES; PERSONNEL; SCHEDULING;

EID: 84901785206     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2014.02.016     Document Type: Article
Times cited : (27)

References (49)
  • 2
    • 0034297657 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: Application to scheduling of mixed-model assembly lines"
    • M. Caridi, and A. Sianesi Multi-agent systems in production planning and control: application to scheduling of mixed-model assembly lines" International Journal of Production Economics 68 2000 29 42
    • (2000) International Journal of Production Economics , vol.68 , pp. 29-42
    • Caridi, M.1    Sianesi, A.2
  • 5
    • 2642563580 scopus 로고    scopus 로고
    • Application of multi-agent planning to the assignment problem
    • S. Kornienkoa, O. Kornienkoa, and J. Prieseb Application of multi-agent planning to the assignment problem Computers in Industry 54 2004 273 290
    • (2004) Computers in Industry , vol.54 , pp. 273-290
    • Kornienkoa, S.1    Kornienkoa, O.2    Prieseb, J.3
  • 6
    • 0028730833 scopus 로고
    • Agent-based flexible routing manufacturing-control simulation system
    • G.Y. Lin, and J.J. Solberg Agent-based flexible routing manufacturing-control simulation system Winter Simulation Conference 1994 p.970 p.977
    • (1994) Winter Simulation Conference , pp. 970-977
    • Lin, G.Y.1    Solberg, J.J.2
  • 7
    • 70149094122 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing-control: A state-Of-The-Art survey
    • P. Lietao Agent-based distributed manufacturing-control: a state-of-the-art survey Engineering Applications of Artificial Intelligence 22 2009 979 991
    • (2009) Engineering Applications of Artificial Intelligence , vol.22 , pp. 979-991
    • Lietao, P.1
  • 8
    • 34548310421 scopus 로고    scopus 로고
    • Industrial applications of agents technologies
    • V. Marik, and J. Lazansky Industrial applications of agents technologies Control Engineering Practice 15 2007 1364 1380
    • (2007) Control Engineering Practice , vol.15 , pp. 1364-1380
    • Marik, V.1    Lazansky, J.2
  • 9
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • J.J. Solberg, and G.Y. Lin Integrated shop floor control using autonomous agents IIE Transactions 24 3 1992 p57 p71
    • (1992) IIE Transactions , vol.24 , Issue.3
    • Solberg, J.J.1    Lin, G.Y.2
  • 10
    • 4944232011 scopus 로고    scopus 로고
    • A simulated annealing algorithm for multi-agent systems: A job-shop scheduling application
    • M.E. Aydin, and T.C. Fogarty A simulated annealing algorithm for multi-agent systems: a job-shop scheduling application Journal of Intelligent Manufacturing 15 2004 805 814
    • (2004) Journal of Intelligent Manufacturing , vol.15 , pp. 805-814
    • Aydin, M.E.1    Fogarty, T.C.2
  • 12
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
    • J. Homberger A multi-agent system for the decentralized resource-constrained multi-project scheduling problem International Transactions in Operational Research 14 6 2007 565 589
    • (2007) International Transactions in Operational Research , vol.14 , Issue.6 , pp. 565-589
    • Homberger, J.1
  • 15
    • 84901803435 scopus 로고    scopus 로고
    • A multi-agent infrastructure for mobile workforce management in a service oriented enterprise
    • D.K. Chiu A multi-agent infrastructure for mobile workforce management in a service oriented enterprise International Conference on System Sciences 2005 515 527
    • (2005) International Conference on System Sciences , pp. 515-527
    • Chiu, D.K.1
  • 17
    • 0029344098 scopus 로고
    • Labor scheduling using NPV estimates of the marginal benefit of additional labor capacity
    • G.M. Thompson Labor scheduling using NPV estimates of the marginal benefit of additional labor capacity Journal of Operations Management 13 2 1995 67 86
    • (1995) Journal of Operations Management , vol.13 , Issue.2 , pp. 67-86
    • Thompson, G.M.1
  • 18
    • 78650184267 scopus 로고    scopus 로고
    • A guided local search based algorithm for the multiobjective empowerment-based field workforce scheduling
    • A. Alsheddy, and E.P.K. Tsang A guided local search based algorithm for the multiobjective empowerment-based field workforce scheduling Workshop on Computational Intelligence 2010 1 6
    • (2010) Workshop on Computational Intelligence , pp. 1-6
    • Alsheddy, A.1    Tsang, E.P.K.2
  • 20
    • 80051919802 scopus 로고    scopus 로고
    • Simulation-based workforce assignment in a multi-organizational social network for alliance-based software development
    • N. Celik, S. Lee, E. Mazhari, Y. Son, R. Lemaire, and K.G. Provan Simulation-based workforce assignment in a multi-organizational social network for alliance-based software development Simulation Modelling Practice and Theory 19 10 2011 2169 2188
    • (2011) Simulation Modelling Practice and Theory , vol.19 , Issue.10 , pp. 2169-2188
    • Celik, N.1    Lee, S.2    Mazhari, E.3    Son, Y.4    Lemaire, R.5    Provan, K.G.6
  • 21
    • 0346307242 scopus 로고    scopus 로고
    • Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: A case study
    • F. Huq, K. Cutright, and C. Martin Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study Omega 32 2 2004 121 129
    • (2004) Omega , vol.32 , Issue.2 , pp. 121-129
    • Huq, F.1    Cutright, K.2    Martin, C.3
  • 22
    • 34547497643 scopus 로고    scopus 로고
    • Workforce optimization: Identification and assignment of professional workers using constraint programming
    • Y. Naveh, Y. Richter, Y. Altshuler, and D.L. Gresh Workforce optimization: identification and assignment of professional workers using constraint programming Journal of Research and Development 51 3-4 2007 263 279
    • (2007) Journal of Research and Development , vol.51 , Issue.34 , pp. 263-279
    • Naveh, Y.1    Richter, Y.2    Altshuler, Y.3    Gresh, D.L.4
  • 25
    • 60749099079 scopus 로고    scopus 로고
    • A simulation based optimization algorithm for slack reduction and workforce scheduling
    • D. Noack, and O. Rose A simulation based optimization algorithm for slack reduction and workforce scheduling Simulation Conference 2008 1989 1994
    • (2008) Simulation Conference , pp. 1989-1994
    • Noack, D.1    Rose, O.2
  • 33
    • 78049373751 scopus 로고    scopus 로고
    • An ontology driven, multi-agent based framework for automated resource allocation in Mobile Workforce Management systems
    • A. Mousavi, M.J. Nordin, and Z.A. Othman An ontology driven, multi-agent based framework for automated resource allocation in Mobile Workforce Management systems International Symposium in Information Technology (ITSim) 2010 1416 1421
    • (2010) International Symposium in Information Technology (ITSim) , pp. 1416-1421
    • Mousavi, A.1    Nordin, M.J.2    Othman, Z.A.3
  • 35
    • 80655124738 scopus 로고    scopus 로고
    • Design of a service oriented architecture for efficient resource allocation in media environments
    • S. Desmet, B. Volckaert, and F. De Turck Design of a service oriented architecture for efficient resource allocation in media environments Future Generation Computer Systems 28 3 2012 527 532
    • (2012) Future Generation Computer Systems , vol.28 , Issue.3 , pp. 527-532
    • Desmet, S.1    Volckaert, B.2    De Turck, F.3
  • 36
    • 66149192436 scopus 로고    scopus 로고
    • Flow shop operator scheduling through constraint satisfaction and constraint optimization techniques
    • G. Neubert, and M.M. Savino Flow shop operator scheduling through constraint satisfaction and constraint optimization techniques International Journal of Productivity and Quality Management 4 6 2009 549 568
    • (2009) International Journal of Productivity and Quality Management , vol.4 , Issue.6 , pp. 549-568
    • Neubert, G.1    Savino, M.M.2
  • 37
    • 84900449979 scopus 로고    scopus 로고
    • Information and service-oriented architecture & web services: Enabling integration and organizational agility
    • S.B. de Oliveira, A.J. Balloni, F.N.B. de Oliveira, and F.A. Todad Information and service-oriented architecture & web services: enabling integration and organizational agility Procedia Technology 5 2012 141 151
    • (2012) Procedia Technology , vol.5 , pp. 141-151
    • De Oliveira, S.B.1    Balloni, A.J.2    De Oliveira, F.N.B.3    Todad, F.A.4
  • 38
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed
    • c-29
    • R.G. Smith The contract net protocol: high-level communication and control in a distributed IEEE Transactions on Computers 1980 c-29
    • (1980) IEEE Transactions on Computers
    • Smith, R.G.1
  • 44
    • 40749125739 scopus 로고    scopus 로고
    • An exact algorithm for a workforce allocation problem with application to an analysis of cross-training policies
    • M.J. Brusco An exact algorithm for a workforce allocation problem with application to an analysis of cross-training policies IIE Transactions 40 2008 495 508
    • (2008) IIE Transactions , vol.40 , pp. 495-508
    • Brusco, M.J.1
  • 46
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
    • H. Jörg A multi-agent system for the decentralized resource-constrained multi-project scheduling problem International Transactions in Operational Research 14 2007 565 589
    • (2007) International Transactions in Operational Research , vol.14 , pp. 565-589
    • Jörg, H.1
  • 48
    • 77956465646 scopus 로고    scopus 로고
    • Design and implementation on communication system of maintenance platform applied to self-propelled guns fire control
    • S. Li, J. Gong, and J. Luo Design and implementation on communication system of maintenance platform applied to self-propelled guns fire control Int. Conference on Computer and Communication Technologies 2010 45 48
    • (2010) Int. Conference on Computer and Communication Technologies , pp. 45-48
    • Li, S.1    Gong, J.2    Luo, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.