-
1
-
-
84892706945
-
Controlling risk
-
no. January, ACM New York, NY, USA, 01-Jan-2001
-
D. McNair, "Controlling risk," Magazine Ubiquity, vol. 2001, no. January, ACM New York, NY, USA, 01-Jan-2001.
-
(2001)
Magazine Ubiquity
-
-
McNair, D.1
-
3
-
-
84898793889
-
A Method of Software Project Risk Identification and Analysis
-
J. Miler, "A Method of Software Project Risk Identification and Analysis," Gdansk University of Technology, 2005.
-
(2005)
Gdansk University of Technology
-
-
Miler, J.1
-
7
-
-
84898824663
-
Managing Information Technology Projects: Applying Project Management Strategies to Software, Hardware, and Integration Initiatives
-
J. Taylor, Managing Information Technology Projects: Applying Project Management Strategies to Software, Hardware, and Integration Initiatives. AMACOM c 2004, 2004, p. 274.
-
(2004)
AMACOM C 2004
, pp. 274
-
-
Taylor, J.1
-
9
-
-
3042605483
-
Value-based software engineering
-
Mar
-
B. Boehm, "Value-based software engineering," ACM SIGSOFT Softw. Eng. Notes, vol. 28, no. 2, p. 3, Mar. 2003.
-
(2003)
ACM SIGSOFT Softw. Eng. Notes
, vol.28
, Issue.2
, pp. 3
-
-
Boehm, B.1
-
10
-
-
80052928992
-
A Taxonomy of an IT Project Failure: Root Causes
-
W. Al-ahmad, K. Al-fagih, K. Khanfar, K. Alsamara, S. Abuleil, and H. ABU-salem, "A Taxonomy of an IT Project Failure: Root Causes," Manage. Rev., vol. 5, no. 1, pp. 93-104, 2009.
-
(2009)
Manage. Rev
, vol.5
, Issue.1
, pp. 93-104
-
-
Al-Ahmad, W.1
Al-Fagih, K.2
Khanfar, K.3
Alsamara, K.4
Abuleil, S.5
Abu-Salem, H.6
-
11
-
-
77950370806
-
Determinants of software quality: A survey of information systems project managers
-
Jun
-
N. Gorla and S.-C. Lin, "Determinants of software quality: A survey of information systems project managers," Inf. Softw. Technol., vol. 52, no. 6, pp. 602-610, Jun. 2010.
-
(2010)
Inf. Softw. Technol
, vol.52
, Issue.6
, pp. 602-610
-
-
Gorla, N.1
Lin, S.-C.2
-
15
-
-
84892703980
-
Software development project success and failure from the supplier' s perspective: A systematic literature review
-
P. Savolainen, J. Ahonen, and I. Richardson, "Software development project success and failure from the supplier' s perspective: A systematic literature review," Int. J. Proj. Manag., p. 12, 2011.
-
(2011)
Int. J. Proj. Manag
, pp. 12
-
-
Savolainen, P.1
Ahonen, J.2
Richardson, I.3
-
17
-
-
79960083951
-
Risk Assessment Techniques for Software Development
-
R. Dash and R. Dash, "Risk Assessment Techniques for Software Development," Eur. J. Sci. Res., vol. 42, no. 4, pp. 629-636, 2010.
-
(2010)
Eur. J. Sci. Res
, vol.42
, Issue.4
, pp. 629-636
-
-
Dash, R.1
Dash, R.2
-
18
-
-
0032207894
-
Aframework for Identifying Software Project Risks
-
M. Keil, P. Cule, K. Lyytinen, and R. Schmidt, "Aframework for Identifying Software Project Risks," Commun. ACM, vol. 41, no. 11, 1998.
-
(1998)
Commun. ACM
, vol.11
, pp. 41
-
-
Keil, M.1
Cule, P.2
Lyytinen, K.3
Schmidt, R.4
-
23
-
-
84898833237
-
A risk based economical approach for evaluating software project portfolios
-
Jul
-
H. Costa, M. Barros, and G. Travassos, "A risk based economical approach for evaluating software project portfolios," ACM SIGSOFT Softw. Eng. Notes, vol. 30, no. 4, p. 1, Jul. 2005.
-
(2005)
ACM SIGSOFT Softw. Eng. Notes
, vol.30
, Issue.4
, pp. 1
-
-
Costa, H.1
Barros, M.2
Travassos, G.3
-
28
-
-
0030386101
-
Business process re-engineering: Some aspects of how to evaluate and manage the risk exposure
-
Dec
-
D. Remenyi and A. Heafield, "Business process re-engineering: some aspects of how to evaluate and manage the risk exposure," Int. J. Proj. Manag., vol. 14, no. 6, pp. 349-357, Dec. 1996.
-
(1996)
Int. J. Proj. Manag
, vol.14
, Issue.6
, pp. 349-357
-
-
Remenyi, D.1
Heafield, A.2
-
30
-
-
71049174205
-
Intelligent Risk Management Tools for Software Development
-
J. Dhlamini, I. Nhamu, and A. Kachepa, "Intelligent Risk Management Tools for Software Development," Risk Manag., pp. 33-40, 2009.
-
(2009)
Risk Manag
, pp. 33-40
-
-
Dhlamini, J.1
Nhamu, I.2
Kachepa, A.3
-
31
-
-
0032332292
-
ConSERV, a project specific risk management concept
-
Dec
-
G. Conroy and H. Soltan, "ConSERV, a project specific risk management concept," Int. J. Proj. Manag., vol. 16, no. 6, pp. 353-366, Dec. 1998.
-
(1998)
Int. J. Proj. Manag
, vol.16
, Issue.6
, pp. 353-366
-
-
Conroy, G.1
Soltan, H.2
-
32
-
-
70349454212
-
Analyzing project risks within a cultural and organizational setting
-
W. Ma, L. Liu, W. Feng, Y. Shan, and F. Peng, "Analyzing project risks within a cultural and organizational setting," in 2009 ICSE Workshop on Leadership and Management in Software Architecture, 2009, pp. 6-14.
-
(2009)
2009 ICSE Workshop On Leadership and Management In Software Architecture
, pp. 6-14
-
-
Ma, W.1
Liu, L.2
Feng, W.3
Shan, Y.4
Peng, F.5
-
33
-
-
0033177429
-
Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project
-
Aug
-
V. Tummala and B. John, "Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project," Int. J. Proj. Manag., vol. 17, no. 4, pp. 223-235, Aug. 1999.
-
(1999)
Int. J. Proj. Manag
, vol.17
, Issue.4
, pp. 223-235
-
-
Tummala, V.1
John, B.2
-
35
-
-
84874621705
-
Software Development Project Risk Management: A New Conceptual Framework
-
L. Sarigiannidis, "Software Development Project Risk Management: A New Conceptual Framework," J. Softw. Eng. Appl., vol. 04, no. 05, pp. 293-305, 2011.
-
(2011)
J. Softw. Eng. Appl
, vol.4
, Issue.5
, pp. 293-305
-
-
Sarigiannidis, L.1
-
38
-
-
39649113838
-
Choosing a project risk-handling strategy: An analytical model
-
Apr
-
M. Fan, N.-P. Lin, and C. Sheu, "Choosing a project risk-handling strategy: An analytical model," Int. J. Prod. Econ., vol. 112, no. 2, pp. 700-713, Apr. 2008.
-
(2008)
Int. J. Prod. Econ
, vol.112
, Issue.2
, pp. 700-713
-
-
Fan, M.1
Lin, N.-P.2
Sheu, C.3
-
39
-
-
53949092999
-
Risk and risk management in software projects: A reassessment
-
Dec
-
P. Bannerman, "Risk and risk management in software projects: A reassessment," J. Syst. Softw., vol. 81, no. 12, pp. 2118-2133, Dec. 2008.
-
(2008)
J. Syst. Softw
, vol.81
, Issue.12
, pp. 2118-2133
-
-
Bannerman, P.1
-
40
-
-
84948739971
-
On Estimating Testing Effort Needed to Assure FieldQuality in Software Development
-
O. Mizuno, E. Shigematsu, Y. Takagi, and T. Kikuno, "On Estimating Testing Effort Needed to Assure FieldQuality in Software Development," Proc. 13 th Int. Symp. Softw. Reliab. Eng. (ISSRE'02, p. 139, 2002.
-
(2002)
Proc. 13 Th Int. Symp. Softw. Reliab. Eng. ISSRE'02
, pp. 139
-
-
Mizuno, O.1
Shigematsu, E.2
Takagi, Y.3
Kikuno, T.4
-
42
-
-
84892747354
-
Sofware Development Standard and Software Engineering Practice: A Case Study of Bangladesh
-
May
-
Z. Begum, M. S. A. Khan, M. Hafiz, M. S. Islam, and M. Shoyaib, "Sofware Development Standard and Software Engineering Practice: A Case Study of Bangladesh," J. Bangladesh Acad. Sci., vol. 32, no. 2, pp. 131-139, May 2008.
-
(2008)
J. Bangladesh Acad. Sci
, vol.32
, Issue.2
, pp. 131-139
-
-
Begum, Z.1
Khan, M.S.A.2
Hafiz, M.3
Islam, M.S.4
Shoyaib, M.5
-
45
-
-
84898780046
-
Developing risk breakdown structure for information technology organizations
-
Manag., Jun
-
V. Holzmann and I. Spiegler, "Developing risk breakdown structure for information technology organizations," Int. J. Proj. Manag., Jun. 2010.
-
(2010)
Int. J. Proj
-
-
Holzmann, V.1
Spiegler, I.2
-
48
-
-
85051722172
-
Software Project Management in Practice
-
P. Jalote, Software Project Management in Practice. Addison Wesley, 2002, p. 288.
-
(2002)
Addison Wesley
, pp. 288
-
-
Jalote, P.1
-
49
-
-
84898782813
-
Risk assessment model selection in construction industry
-
no. December, Dec
-
A. Azari, N. Mousavi, and S. F. Mousavi, "Risk assessment model selection in construction industry," Expert Syst. Appl., no. December, Dec. 2010.
-
(2010)
Expert Syst. Appl
-
-
Azari, A.1
Mousavi, N.2
Mousavi, S.F.3
-
51
-
-
0024681034
-
-
B. Boehm and R. Ross, "Theory-W Software Project Management: Princioles and Examples," vol. 15, no. 7, pp. 902-916, 1989.
-
(1989)
Theory-W Software Project Management: Princioles and Examples
, vol.15
, Issue.7
, pp. 902-916
-
-
Boehm, B.1
Ross, R.2
-
52
-
-
77950463374
-
Software Development Risk Management Model - A Goal Driven Approach
-
S. Islam, "Software Development Risk Management Model - A Goal Driven Approach," Development, pp. 5-8, 2009.
-
(2009)
Development
, pp. 5-8
-
-
Islam, S.1
-
54
-
-
17644393182
-
Risk analysis in software development project with owners and contractors
-
X. Lu and Q. Ma, "Risk analysis in software development project with owners and contractors," IEEE Int. Eng. Manag. Conf., vol. 4, pp. 789-793, 2004.
-
(2004)
IEEE Int. Eng. Manag. Conf
, vol.4
, pp. 789-793
-
-
Lu, X.1
Ma, Q.2
-
55
-
-
33645877974
-
A model for inbound supply risk analysis
-
Jan
-
T. Wu, J. Blackhurst, and V. Chidambaram, "A model for inbound supply risk analysis," Comput. Ind., vol. 57, pp. 350-365, Jan. 2006.
-
(2006)
Comput. Ind
, vol.57
, pp. 350-365
-
-
Wu, T.1
Blackhurst, J.2
Chidambaram, V.3
-
56
-
-
84898797146
-
Information Systems Project Management: How to Deliver Function and Value in Information Technology Projects
-
J. Hallows, Information Systems Project Management: How to Deliver Function and Value in Information Technology Projects, Secondi. AMACOM, 2005, p. 304.
-
(2005)
Secondi. AMACOM
, pp. 304
-
-
Hallows, J.1
-
58
-
-
84897388709
-
A Study on Risk Assessment for Small and Medium Software Development Projects
-
A. Sharif and S. Basri, "A Study on Risk Assessment for Small and Medium Software Development Projects," Int. J. New Comput. Archit. their Appl., pp. 325-335, 2011.
-
(2011)
Int. J. New Comput. Archit. their Appl
, pp. 325-335
-
-
Sharif, A.1
Basri, S.2
-
59
-
-
0037840504
-
Risk analysis techniques and their application to software development
-
Dec
-
J. Bennett, G. Bohoris, E. Aspinwall, and R. Hall, "Risk analysis techniques and their application to software development," Eur. J. Oper. Res., vol. 95, no. 3, pp. 467-475, Dec. 1996.
-
(1996)
Eur. J. Oper. Res
, vol.95
, Issue.3
, pp. 467-475
-
-
Bennett, J.1
Bohoris, G.2
Aspinwall, E.3
Hall, R.4
-
62
-
-
33846059407
-
Attention-shaping tools, expertise, and perceived control in IT project risk assessment
-
Feb
-
S. Du, M. Keil, L. Mathiassen, Y. Shen, and A Tiwana, "Attention-shaping tools, expertise, and perceived control in IT project risk assessment," Decis. Support Syst., vol. 43, no. 1, pp. 269-283, Feb. 2007.
-
(2007)
Decis. Support Syst
, vol.43
, Issue.1
, pp. 269-283
-
-
Du, S.1
Keil, M.2
Mathiassen, L.3
Shen, Y.4
Tiwana, A.5
-
63
-
-
79955728922
-
Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas
-
Jul
-
P. Webern, G. Medina-Oliva, C. Simon, and B. Iung, "Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas," Eng. Appl. Artif. Intell., Jul. 2010.
-
(2010)
Eng. Appl. Artif. Intell
-
-
Webern, P.1
Medina-Oliva, G.2
Simon, C.3
Iung, B.4
-
64
-
-
73549123101
-
-
Practice. McGraw-Hill Companies
-
B. Berenbach, D. J. Paulish, J. Kazmeier, and A. Rudorfer, Software & Systems Requirements Engineering: In Practice. McGraw-Hill Companies., 2009, p. 321.
-
(2009)
Software & Systems Requirements Engineering
, pp. 321
-
-
Berenbach, B.1
Paulish, D.J.2
Kazmeier, J.3
Rudorfer, A.4
-
66
-
-
3042693355
-
An algorithm for optimal scheduling and risk assessment of projects
-
Oct
-
A. Zafra-Cabeza, M. Ridao, and E. Camacho, "An algorithm for optimal scheduling and risk assessment of projects," Control Eng. Pract., vol. 12, no. 10, pp. 1329-1338, Oct. 2004.
-
(2004)
Control Eng. Pract
, vol.12
, Issue.10
, pp. 1329-1338
-
-
Zafra-Cabeza, A.1
Ridao, M.2
Camacho, E.3
-
70
-
-
84898785854
-
Catastrophe Disentanglement: Getting Software Projects Back on Track
-
E. Bennatan, Catastrophe Disentanglement: Getting Software Projects Back on Track. Addison Wesley Professional, 2006, p. 288.
-
(2006)
Addison Wesley Professional
, pp. 288
-
-
Bennatan, E.1
-
71
-
-
13944255907
-
Fuzzy decision support system for risk analysis in e-commerce development
-
Aug
-
E. W. T. Ngai and F. K. T. Wat, "Fuzzy decision support system for risk analysis in e-commerce development," Decis. Support Syst., vol. 40, no. 2, pp. 235-255, Aug. 2005.
-
(2005)
Decis. Support Syst
, vol.40
, Issue.2
, pp. 235-255
-
-
Ngai, E.W.T.1
Wat, F.K.T.2
-
72
-
-
0037409418
-
A research agenda to reduce risk in new product development through knowledge management: A practitioner perspective
-
Jun
-
L. Cooper, "A research agenda to reduce risk in new product development through knowledge management: a practitioner perspective," J. Eng. Technol. Manag., vol. 20, no. 1-2, pp. 117-140, Jun. 2003.
-
(2003)
J. Eng. Technol. Manag
, vol.20
, Issue.1-2
, pp. 117-140
-
-
Cooper, L.1
-
73
-
-
70449091784
-
Choquet integral based aggregation approach to software development risk assessment
-
Feb
-
G. Buyukozkan and D. Ruan, "Choquet integral based aggregation approach to software development risk assessment," Inf. Sci. (Ny)., vol. 180, no. 3, pp. 441-451, Feb. 2010.
-
(2010)
Inf. Sci. (Ny)
, vol.180
, Issue.3
, pp. 441-451
-
-
Buyukozkan, G.1
Ruan, D.2
-
74
-
-
0034754411
-
Stochastic simulation of risk factor potential effects for software development risk management
-
Dec
-
D. Houston, G. Mackulak, and J. Collofello, "Stochastic simulation of risk factor potential effects for software development risk management," J. Syst. Softw., vol. 59, no. 3, pp. 247-257, Dec. 2001.
-
(2001)
J. Syst. Softw
, vol.59
, Issue.3
, pp. 247-257
-
-
Houston, D.1
Mackulak, G.2
Collofello, J.3
-
75
-
-
81255149030
-
Managing Software Project Risks with the Chi-Square Technique
-
K. Khanfar, A. Elzamly, W. Al-Ahmad, E. El-Qawasmeh, K. Alsamara, and S. Abuleil, "Managing Software Project Risks with the Chi-Square Technique," Manage. Rev., vol. 4, no. 2, pp. 18-29, 2008.
-
(2008)
Manage. Rev
, vol.4
, Issue.2
, pp. 18-29
-
-
Khanfar, K.1
Elzamly, A.2
Al-Ahmad, W.3
El-Qawasmeh, E.4
Alsamara, K.5
Abuleil, S.6
-
76
-
-
81255172311
-
Managing Software Project Risks with Proposed Regression Model Techniques and Effect Size Technique
-
March
-
A. Elzamly and B. Hussin, "Managing Software Project Risks with Proposed Regression Model Techniques and Effect Size Technique," Int. Rev. Comput. Softw., vol. 6, no. 2 March, pp. 250-263, 2011.
-
(2011)
Int. Rev. Comput. Softw
, vol.6
, Issue.2
, pp. 250-263
-
-
Elzamly, A.1
Hussin, B.2
-
77
-
-
84892754665
-
Managing Software Project Risks (Implementation Phase) with Proposed Stepwise Regression Analysis Techniques
-
A. Elzamly and B. Hussin, "Managing Software Project Risks (Implementation Phase) with Proposed Stepwise Regression Analysis Techniques," Int. J. Inf. Technol., vol. 1, no. 4, 2013.
-
(2013)
Int. J. Inf. Technol
, vol.1
, Issue.4
-
-
Elzamly, A.1
Hussin, B.2
-
78
-
-
84892769321
-
Managing Software Project Risks (Design Phase) with Proposed Fuzzy Regression Analysis Techniques with Fuzzy Concepts.pdf
-
A. Elzamly and B. Hussin, "Managing Software Project Risks (Design Phase) with Proposed Fuzzy Regression Analysis Techniques with Fuzzy Concepts.pdf," Int. Rev. Comput. Softw., vol. 8, no. 11, 2013.
-
(2013)
Int. Rev. Comput. Softw
, vol.8
, Issue.11
-
-
Elzamly, A.1
Hussin, B.2
|