메뉴 건너뛰기




Volumn 57, Issue 4, 2006, Pages 350-365

A model for inbound supply risk analysis

Author keywords

Analytical hierarchy process (AHP); Inbound supply risk analysis; Prototype implementation

Indexed keywords

HIERARCHICAL SYSTEMS; INDUSTRIAL APPLICATIONS; LOGISTICS; PROFESSIONAL ASPECTS; SOFTWARE PROTOTYPING;

EID: 33645877974     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2005.11.001     Document Type: Article
Times cited : (331)

References (46)
  • 1
    • 1642523356 scopus 로고    scopus 로고
    • G.A. Zsidisin, Defining supply risk: a grounded theory approach, in: Proceedings from the Decision Sciences Institute Annual Meeting, San Diego, CA, 2002.
  • 3
    • 40649097712 scopus 로고    scopus 로고
    • An agency theory investigation of supply risk management
    • Zsidisin G.A., and Ellram L.M. An agency theory investigation of supply risk management. Journal of Supply Chain Management 39 3 (2003) 15-29
    • (2003) Journal of Supply Chain Management , vol.39 , Issue.3 , pp. 15-29
    • Zsidisin, G.A.1    Ellram, L.M.2
  • 10
    • 33645859997 scopus 로고    scopus 로고
    • E. Hellweg. Supply-chain hero. Business 2.0 [Online], available: https://www.business2.com/subscribers/articles/mag/0,1640,35883,00.html, January 2002.
  • 11
    • 20444439439 scopus 로고    scopus 로고
    • Targeting a just-in-case supply chain for the inevitable next disaster
    • Martha J., and Subbakrishna S. Targeting a just-in-case supply chain for the inevitable next disaster. Supply Chain Management Review 6 5 (2002) 18-24
    • (2002) Supply Chain Management Review , vol.6 , Issue.5 , pp. 18-24
    • Martha, J.1    Subbakrishna, S.2
  • 12
    • 33645894275 scopus 로고    scopus 로고
    • Just-in-case operations
    • Martha J. Just-in-case operations. Warehousing Forum 17 2 (2002)
    • (2002) Warehousing Forum , vol.17 , Issue.2
    • Martha, J.1
  • 13
    • 0001069091 scopus 로고    scopus 로고
    • Purchasing must become supply management
    • Kraljic P. Purchasing must become supply management. Harvard Business Review (September 2001) 407-415
    • (2001) Harvard Business Review , pp. 407-415
    • Kraljic, P.1
  • 15
    • 2642530017 scopus 로고    scopus 로고
    • Supply risk assessment analysis
    • Zsidisin G.A., and Ellram L.M. Supply risk assessment analysis. Practix 2 4 (1999) 9-12
    • (1999) Practix , vol.2 , Issue.4 , pp. 9-12
    • Zsidisin, G.A.1    Ellram, L.M.2
  • 16
    • 33645871932 scopus 로고    scopus 로고
    • F. Finnman, Supplier Selection when Considering Risks for Disturbances in the Inbound Flow to Scania-A Model for Supply Chain Risk Management, M.S. thesis, Dept. of Industrial Management and Logistics, Division of Engineering Logistics, Lund Institute of Technology, Lund, Sweden, 2002.
  • 18
    • 0035476223 scopus 로고    scopus 로고
    • Towards a framework for project risk knowledge management in the construction supply chain
    • Tah J.H.M., and Carr V. Towards a framework for project risk knowledge management in the construction supply chain. Advances in Engineering Software 32 (2002) 835-846
    • (2002) Advances in Engineering Software , vol.32 , pp. 835-846
    • Tah, J.H.M.1    Carr, V.2
  • 19
    • 0036778953 scopus 로고    scopus 로고
    • A life-cycle framework to analyze business risk in process industry project
    • Sharratt P.N., and Choong P.M. A life-cycle framework to analyze business risk in process industry project. Journal of Cleaner Production 10 (2002) 479-493
    • (2002) Journal of Cleaner Production , vol.10 , pp. 479-493
    • Sharratt, P.N.1    Choong, P.M.2
  • 20
    • 1642445950 scopus 로고    scopus 로고
    • Purchasing organization involvement in risk assessments, contingency plans, and risk management: an exploratory study
    • Zsidisin G.A., Panelli A., and Upton R. Purchasing organization involvement in risk assessments, contingency plans, and risk management: an exploratory study. Supply Chain Management: An International Journal 5 4 (2000) 187-197
    • (2000) Supply Chain Management: An International Journal , vol.5 , Issue.4 , pp. 187-197
    • Zsidisin, G.A.1    Panelli, A.2    Upton, R.3
  • 23
    • 33645855702 scopus 로고    scopus 로고
    • V. Chidambaram, Supply Chain Risk Management: A Study on Inbound Supply Risk Analysis, MS Thesis, Arizona State University, Department of Industrial Engineering, 2003.
  • 24
    • 27844537926 scopus 로고    scopus 로고
    • An institutional theory perspective of business continuity planning for purchasing and supply management
    • Zsidisin G., Melnyk S., and Ragatz G. An institutional theory perspective of business continuity planning for purchasing and supply management. International Journal of Production Research 43 16 (2005) 3401-3420
    • (2005) International Journal of Production Research , vol.43 , Issue.16 , pp. 3401-3420
    • Zsidisin, G.1    Melnyk, S.2    Ragatz, G.3
  • 27
    • 0002750342 scopus 로고    scopus 로고
    • An analysis of vendor selection: systems and decisions
    • Dickson G.W. An analysis of vendor selection: systems and decisions. Journal of Purchasing 2 1 (1996) 5-17
    • (1996) Journal of Purchasing , vol.2 , Issue.1 , pp. 5-17
    • Dickson, G.W.1
  • 29
    • 33645846399 scopus 로고    scopus 로고
    • D. Machalaba, Q.S. Kim, West coast docks are shut down after series of work disruptions, The Wall Street Journal (Eastern Edition) A.2. (September 30) (2002).
  • 31
    • 33645884520 scopus 로고    scopus 로고
    • Here comes the road test: the Daimler-Chrysler deal
    • Seaman B., and Stodghill B. Here comes the road test: the Daimler-Chrysler deal. Time 151 19 (1998) 66-69
    • (1998) Time , vol.151 , Issue.19 , pp. 66-69
    • Seaman, B.1    Stodghill, B.2
  • 33
    • 33645848251 scopus 로고    scopus 로고
    • Coke sees 12% increase in earnings. Problems in Japan, India are offset by lower taxes and brisk sales in Europe
    • Terhune C. Coke sees 12% increase in earnings. Problems in Japan, India are offset by lower taxes and brisk sales in Europe. The Wall Street Journal (Eastern edition) B5 17 (2003)
    • (2003) The Wall Street Journal (Eastern edition) , vol.B5 , Issue.17
    • Terhune, C.1
  • 34
    • 38249027618 scopus 로고
    • A risk/benefit analysis of sourcing strategies: single vs. multiple sourcing
    • Treleven M., and Schweikhart S.B. A risk/benefit analysis of sourcing strategies: single vs. multiple sourcing. Journal of Operations Management 7 4 (1988) 93-114
    • (1988) Journal of Operations Management , vol.7 , Issue.4 , pp. 93-114
    • Treleven, M.1    Schweikhart, S.B.2
  • 35
    • 0006066760 scopus 로고    scopus 로고
    • Hankintatoimeen liittyvat riskit teollisuusyrityksessaK
    • Kuusela H., and Ollikainen R. (Eds), University Press, Nancy
    • Virolainen V., and Tuominen M. Hankintatoimeen liittyvat riskit teollisuusyrityksessaK. In: Kuusela H., and Ollikainen R. (Eds). Riskit ja Riskienhallinta (1998), University Press, Nancy 164-178
    • (1998) Riskit ja Riskienhallinta , pp. 164-178
    • Virolainen, V.1    Tuominen, M.2
  • 36
    • 33645882731 scopus 로고    scopus 로고
    • Intensity and managerial scope of supplier integration
    • Wagner S. Intensity and managerial scope of supplier integration. Journal of Supply Chain Management 39 4 (2003)
    • (2003) Journal of Supply Chain Management , vol.39 , Issue.4
    • Wagner, S.1
  • 38
    • 1542375878 scopus 로고    scopus 로고
    • Decision support system for inspection and maintenance: a case study of oil pipelines
    • Dey P. Decision support system for inspection and maintenance: a case study of oil pipelines. IEEE Transactions on Engineering Management 15 1 (2004) 47-56
    • (2004) IEEE Transactions on Engineering Management , vol.15 , Issue.1 , pp. 47-56
    • Dey, P.1
  • 40
    • 0030420260 scopus 로고    scopus 로고
    • Design and evaluation of automated cellular manufacturing systems with simulation modelling and AHP approach: a case study
    • Chan F., and Abhary K. Design and evaluation of automated cellular manufacturing systems with simulation modelling and AHP approach: a case study. Integrated Manufacturing Systems 7 6 (1996)
    • (1996) Integrated Manufacturing Systems , vol.7 , Issue.6
    • Chan, F.1    Abhary, K.2
  • 43
    • 33645860919 scopus 로고    scopus 로고
    • G.R. Finnie, G.E. Wittig, An intelligent web tool for collection of comparative survey data with an application to IS curriculum design, in: Proceedings of the 10th Australasian Conference on Information Systems, Wellington, New Zealand, December 1-3, 1999.
  • 44
    • 33645889458 scopus 로고    scopus 로고
    • M.L. Peters, S. Zelewski, A heuristic algorithm to improve the consistency of judgments in the analytical hierarchy process. Universität Duisburg-Essen,Essen,Germany [Online], available: http://www.pim.uni-essen.de/publikationen/peters/bericht18.pdf, 2003.
  • 46
    • 38249004406 scopus 로고    scopus 로고
    • W.C. Wedley, B. Schoner, T.S. Tang, Starting rules for incomplete comparisons in the analytic hierarchy process, in: V. Luis, M.Z. Fatemeh (Eds.), Analytic Hierarchy Process, Mathematical and Computer Modeling, 17, 4-5, Pergamon Press, Oxford, 1993, pp. 93-100.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.