메뉴 건너뛰기




Volumn 29, Issue 2, 2014, Pages 785-793

Planning active distribution networks considering multi-DG configurations

Author keywords

Active network management; distributed generation; optimal power flow; power distribution planning

Indexed keywords

ACTIVE DISTRIBUTION NETWORKS; DISTRIBUTION SYSTEMS; MULTI-PERIOD; MULTIPLE DISTRIBUTED GENERATIONS; OPERATION STATUS; OPTIMAL POWER FLOWS; POWER DISTRIBUTION PLANNING; SYSTEM RELIABILITY;

EID: 84897584624     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2282343     Document Type: Article
Times cited : (170)

References (48)
  • 2
    • 77955696530 scopus 로고    scopus 로고
    • A reliability perspective of the smart grid
    • Jun.
    • K.Moslehi and R. Kumar, "A reliability perspective of the smart grid," IEEE Trans. Smart Grid, vol. 1, no. 1, pp. 57-64, Jun. 2010.
    • (2010) IEEE Trans. Smart Grid , vol.1 , Issue.1 , pp. 57-64
    • Moslehi, K.1    Kumar, R.2
  • 3
    • 84883248916 scopus 로고    scopus 로고
    • Evaluation of advanced operation and control of distributed wind farms to support efficiency and reliability
    • Oct.
    • A. Keane et al., "Evaluation of advanced operation and control of distributed wind farms to support efficiency and reliability," IEEE Trans. Sustain. Energy, vol. 3, no. 4, pp. 735-742, Oct. 2012.
    • (2012) IEEE Trans. Sustain. Energy , vol.3 , Issue.4 , pp. 735-742
    • Keane, A.1
  • 4
    • 47149112458 scopus 로고    scopus 로고
    • Summary of distributed resources impact on power delivery systems
    • Jul.
    • R. A. Walling, R. Saint, R. C. Dugan, J. Burke, and L. A. Kojovic, "Summary of distributed resources impact on power delivery systems," IEEE Trans. Power Del., vol. 23, no. 3, pp. 1636-1644, Jul. 2008.
    • (2008) IEEE Trans. Power Del. , vol.23 , Issue.3 , pp. 1636-1644
    • Walling, R.A.1    Saint, R.2    Dugan, R.C.3    Burke, J.4    Kojovic, L.A.5
  • 5
    • 0037478677 scopus 로고    scopus 로고
    • Determining the impact of distributed generation on power systems. I. Radial distribution systems
    • P. P. Barker and R. W. De Mello, "Determining the impact of distributed generation on power systems. I. Radial distribution systems," in Proc. IEEE Power Eng. Soc. Summer Meeting, 2000, vol. 3.
    • (2000) Proc. IEEE Power Eng. Soc. Summer Meeting , vol.3
    • Barker, P.P.1    De Mello, R.W.2
  • 6
    • 84962357038 scopus 로고    scopus 로고
    • Integration issues of distributed generation in distribution grids
    • Jan.
    • E. Coster, J. Myrzik, B. Kruimer, and W. Kling, "Integration issues of distributed generation in distribution grids," Proc. IEEE, vol. 99, no. 1, pp. 28-39, Jan. 2011.
    • (2011) Proc. IEEE , vol.99 , Issue.1 , pp. 28-39
    • Coster, E.1    Myrzik, J.2    Kruimer, B.3    Kling, W.4
  • 7
    • 33744512926 scopus 로고    scopus 로고
    • Dispersed generation interconnection-utility perspective
    • May-Jun.
    • M. Nagpal, F. Plumptre, R. Fulton, and T. G. Martinich, "Dispersed generation interconnection-utility perspective," IEEE Trans. Ind. App., vol. 42, no. 3, pp. 864-872, May-Jun. 2006.
    • (2006) IEEE Trans. Ind. App. , vol.42 , Issue.3 , pp. 864-872
    • Nagpal, M.1    Plumptre, F.2    Fulton, R.3    Martinich, T.G.4
  • 8
    • 80054081204 scopus 로고    scopus 로고
    • Optimal siting and sizing of distributed generators in distribution systems considering uncertainties
    • Oct.
    • Z. Liu, F. Wen, and G. Ledwich, "Optimal siting and sizing of distributed generators in distribution systems considering uncertainties," IEEE Trans. Power Del., vol. 26, no. 4, pp. 2541-2551, Oct. 2011.
    • (2011) IEEE Trans. Power Del. , vol.26 , Issue.4 , pp. 2541-2551
    • Liu, Z.1    Wen, F.2    Ledwich, G.3
  • 9
    • 68349150313 scopus 로고    scopus 로고
    • A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties
    • Aug.
    • H. Yu, C. Y. Chung, K. P. Wong, and J. H. Zhang, "A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1568-1576, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1568-1576
    • Yu, H.1    Chung, C.Y.2    Wong, K.P.3    Zhang, J.H.4
  • 10
    • 84859088093 scopus 로고    scopus 로고
    • Distribution system planning with incorporating DG reactive capability and system uncertainties
    • Jan.
    • K. Zou, A. P. Agalgaonkar, K. M. Muttaqi, and S. Perera, "Distribution system planning with incorporating DG reactive capability and system uncertainties," IEEE Trans. Sustain. Energy, vol. 3, no. 1, pp. 112-123, Jan. 2012.
    • (2012) IEEE Trans. Sustain. Energy , vol.3 , Issue.1 , pp. 112-123
    • Zou, K.1    Agalgaonkar, A.P.2    Muttaqi, K.M.3    Perera, S.4
  • 11
    • 84866715115 scopus 로고    scopus 로고
    • Binary PSO-based dynamic multi-objective model for distributed generation planning under uncertainty
    • Mar.
    • A. Soroudi and M. Afrasiab, "Binary PSO-based dynamic multi-objective model for distributed generation planning under uncertainty," IET Renew. Power Gener., vol. 6, no. 2, pp. 67-78, Mar. 2012.
    • (2012) IET Renew. Power Gener. , vol.6 , Issue.2 , pp. 67-78
    • Soroudi, A.1    Afrasiab, M.2
  • 12
    • 84864288818 scopus 로고    scopus 로고
    • Studying the variability and uncertainty impacts of variable generation at multiple timescales
    • Aug.
    • E. Ela and M. O'Malley, "Studying the variability and uncertainty impacts of variable generation at multiple timescales," IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1324-1333, Aug. 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.3 , pp. 1324-1333
    • Ela, E.1    O'Malley, M.2
  • 13
    • 79953195581 scopus 로고    scopus 로고
    • Value of wind power at different locations in the grid
    • Apr.
    • V. Hamidi, F. Li, and L. Yao, "Value of wind power at different locations in the grid," IEEE Power Del., vol. 26, no. 2, pp. 526-537, Apr. 2011.
    • (2011) IEEE Power Del. , vol.26 , Issue.2 , pp. 526-537
    • Hamidi, V.1    Li, F.2    Yao, L.3
  • 15
    • 0036573637 scopus 로고    scopus 로고
    • Maximising penetration of wind generation in existing distribution networks
    • DOI 10.1049/ip-gtd:20020218
    • S. N. Liew and G. Strbac, "Maximising penetration of wind generation in existing distribution networks," IEE Gener. Transm. Distrib., vol. 149, no. 3, pp. 256-262, May 2002. (Pubitemid 34593557)
    • (2002) IEE Proceedings: Generation, Transmission and Distribution , vol.149 , Issue.3 , pp. 256-262
    • Liew, S.N.1    Strbac, G.2
  • 16
    • 76649114329 scopus 로고    scopus 로고
    • Distribution network capacity assessment: Variable DG and active networks
    • Feb.
    • L. F. Ochoa, C. J. Dent, and G. P. Harrison, "Distribution network capacity assessment: Variable DG and active networks," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 87-95, Feb. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.1 , pp. 87-95
    • Ochoa, L.F.1    Dent, C.J.2    Harrison, G.P.3
  • 17
    • 77953329950 scopus 로고    scopus 로고
    • Evaluating maximum wind energy exploitation in active distribution networks
    • P. Siano, P. Chen, Z. Chen, and A. Piccolo, "Evaluating maximum wind energy exploitation in active distribution networks," IET Gener. Transm. Distrib., vol. 4, no. 5, pp. 598-608, 2010.
    • (2010) IET Gener. Transm. Distrib. , vol.4 , Issue.5 , pp. 598-608
    • Siano, P.1    Chen, P.2    Chen, Z.3    Piccolo, A.4
  • 18
    • 78650563887 scopus 로고    scopus 로고
    • Minimizing energy losses: Optimal accommodation and smart operation of renewable distributed generation
    • Feb.
    • L. F. Ochoa and G. P. Harrison, "Minimizing energy losses: Optimal accommodation and smart operation of renewable distributed generation," IEEE Trans. Power Syst., vol. 26, no. 1, pp. 198-205, Feb. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.1 , pp. 198-205
    • Ochoa, L.F.1    Harrison, G.P.2
  • 19
    • 79953067678 scopus 로고    scopus 로고
    • Coordinated active power curtailment of grid connected PV inverters for overvoltage prevention
    • Apr.
    • R. Tonkoski, L. A. C. Lopes, and T. H. M. El-Fouly, "Coordinated active power curtailment of grid connected PV inverters for overvoltage prevention," IEEE Trans. Sustain. Energy, vol. 2, no. 2, pp. 139-147, Apr. 2011.
    • (2011) IEEE Trans. Sustain. Energy , vol.2 , Issue.2 , pp. 139-147
    • Tonkoski, R.1    Lopes, L.A.C.2    El-Fouly, T.H.M.3
  • 20
    • 34248205012 scopus 로고    scopus 로고
    • Generation curtailment to manage voltage constraints in distribution networks
    • DOI 10.1049/iet-gtd:20060246
    • Q. Zhou and J. W. Bialek, "Generation curtailment to manage voltage constraints in distribution networks," IET Gener. Transm. Distrib., vol. 1, no. 3, pp. 492-498, May 2007. (Pubitemid 46718687)
    • (2007) IET Generation, Transmission and Distribution , vol.1 , Issue.3 , pp. 492-498
    • Zhou, Q.1    Bialek, J.W.2
  • 21
    • 77954579861 scopus 로고    scopus 로고
    • Coordinated output control of multiple distributed generation schemes
    • May
    • S. C. E. Jupe, P. C. Taylor, and A.Michiorri, "Coordinated output control of multiple distributed generation schemes," IET Renew. Power Gener., vol. 4, no. 3, pp. 283-297, May 2010.
    • (2010) IET Renew. Power Gener. , vol.4 , Issue.3 , pp. 283-297
    • Jupe, S.C.E.1    Taylor, P.C.2    Michiorri, A.3
  • 22
    • 70349482115 scopus 로고    scopus 로고
    • Planning and operating non-firm distributed generation
    • Dec.
    • A. Keane, Q. Zhou, J. W. Bialek, and M. O'Malley, "Planning and operating non-firm distributed generation," IET Renew. Power Gener., vol. 3, no. 4, pp. 455-464, Dec. 2009.
    • (2009) IET Renew. Power Gener. , vol.3 , Issue.4 , pp. 455-464
    • Keane, A.1    Zhou, Q.2    Bialek, J.W.3    O'Malley, M.4
  • 23
    • 76449093577 scopus 로고    scopus 로고
    • Assessment of distribution network limits for non-firm connection of renewable generation
    • Jan.
    • T. Boehme,G. P.Harrison, andA. R.Wallace, "Assessment of distribution network limits for non-firm connection of renewable generation," IET Renew. Power Gener., vol. 4, no. 1, pp. 64-74, Jan. 2010.
    • (2010) IET Renew. Power Gener. , vol.4 , Issue.1 , pp. 64-74
    • Boehmeg, T.1    Harrison, G.P.2    Wallace, A.R.3
  • 24
    • 33746190662 scopus 로고    scopus 로고
    • Methodology for determination of economic connection capacity for renewable generator connections to distribution networks optimised by active power flow management
    • DOI 10.1049/ip-gtd:20050173
    • R. A. F. Currie, G.W. Ault, and J. R.McDonald, "Methodology for the determination of the economic connection capacity for renewable generator connections to distribution networks optimised by active power flow management," Proc. Inst. Elect. Eng., Gener., Transm. Distrib., vol. 153, no. 4, pp. 456-462, Jul. 2006. (Pubitemid 44090991)
    • (2006) IEE Proceedings: Generation, Transmission and Distribution , vol.153 , Issue.4 , pp. 456-462
    • Currie, R.A.F.1    Ault, G.W.2    McDonald, J.R.3
  • 28
    • 84860244708 scopus 로고    scopus 로고
    • Distribution power flow management utilizing an online optimal power flow technique
    • May
    • M. J. Dolan et al., "Distribution power flow management utilizing an online optimal power flow technique," IEEE Trans. Power Syst., vol. 27, no. 2, pp. 790-799, May 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.2 , pp. 790-799
    • Dolan, M.J.1
  • 29
    • 80052349131 scopus 로고    scopus 로고
    • Optimal coordination of energy resources with a two-stage online active management
    • Oct.
    • F. Pilo, G. Pisano, and G. G. Soma, "Optimal coordination of energy resources with a two-stage online active management," IEEE Trans. Ind. Electron., vol. 58, no. 10, pp. 4526-4537, Oct. 2011.
    • (2011) IEEE Trans. Ind. Electron. , vol.58 , Issue.10 , pp. 4526-4537
    • Pilo, F.1    Pisano, G.2    Soma, G.G.3
  • 30
    • 80053192955 scopus 로고    scopus 로고
    • Combined operations of renewable energy systems and responsive demand in a smart grid
    • Oct.
    • C. Cecati, C. Citro, and P. Siano, "Combined operations of renewable energy systems and responsive demand in a smart grid," IEEE Trans. Sustain. Energy, vol. 2, no. 2, pp. 468-476, Oct. 2011.
    • (2011) IEEE Trans. Sustain. Energy , vol.2 , Issue.2 , pp. 468-476
    • Cecati, C.1    Citro, C.2    Siano, P.3
  • 32
    • 80053362522 scopus 로고    scopus 로고
    • Optimization of operating and investment costs of active management deployment in distribution networks
    • Jun.
    • D. Papadaskalopoulos, E.Manitsas, P.Mancarella, and G. Strbac, "Optimization of operating and investment costs of active management deployment in distribution networks," in IEEE Trondheim PowerTech, Jun. 2011.
    • (2011) IEEE Trondheim PowerTech
    • Papadaskalopoulos, D.1    Manitsas, E.2    Mancarella, P.3    Strbac, G.4
  • 35
    • 84865456948 scopus 로고    scopus 로고
    • Cost-benefit analyses of active distribution network management, part I: Annual benefit analysis
    • Sep.
    • Z. Hu and F. Li, "Cost-benefit analyses of active distribution network management, part I: Annual benefit analysis," IEEE Trans. Smart Grid, vol. 3, no. 3, pp. 1067-1074, Sep. 2012.
    • (2012) IEEE Trans. Smart Grid , vol.3 , Issue.3 , pp. 1067-1074
    • Hu, Z.1    Li, F.2
  • 36
    • 0036465326 scopus 로고    scopus 로고
    • Voltage rise the big issue when connecting embedded generation to long 11 kv overhead lines
    • C. L. Masters, "Voltage rise: The big issue when connecting embedded generation to long 11 kV overhead lines," Power Eng. J., vol. 16, no. 1, pp. 5-12, Feb. 2002. (Pubitemid 34221112)
    • (2002) Power Engineering Journal , vol.16 , Issue.1 , pp. 5-12
    • Masters, C.L.1
  • 37
    • 84866706374 scopus 로고    scopus 로고
    • Analysis of voltage profile problems due to the penetration of distributed generation in low-voltage secondary distribution networks
    • Oct.
    • P.-C. Chen et al., "Analysis of voltage profile problems due to the penetration of distributed generation in low-voltage secondary distribution networks," IEEE Trans. PowerDel., vol. 27, no. 4, pp. 2020-2028,Oct. 2012.
    • (2012) IEEE Trans. PowerDel. , vol.27 , Issue.4 , pp. 2020-2028
    • Chen, P.-C.1
  • 38
    • 76649120856 scopus 로고    scopus 로고
    • Network distributed generation capacity analysis using OPF with voltage step constraints
    • Feb.
    • C. Dent, L. F. Ochoa, and G. P. Harrison, "Network distributed generation capacity analysis using OPF with voltage step constraints," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 296-304, Feb. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.1 , pp. 296-304
    • Dent, C.1    Ochoa, L.F.2    Harrison, G.P.3
  • 39
    • 77952311496 scopus 로고    scopus 로고
    • Method for determining the maximum allowable penetration level of distributed generation without steady-state voltage violations
    • H. M. Ayres, W. Freitas, M. C. De Almeida, and L. C. P. Da Silva, "Method for determining the maximum allowable penetration level of distributed generation without steady-state voltage violations," IET Gener. Transm. Distrib., vol. 4, no. 4, pp. 495-508, 2010.
    • (2010) IET Gener. Transm. Distrib. , vol.4 , Issue.4 , pp. 495-508
    • Ayres, H.M.1    Freitas, W.2    De Almeida, M.C.3    Da Silva, L.C.P.4
  • 40
    • 24944542857 scopus 로고    scopus 로고
    • Optimal allocation of embedded generation on distribution networks
    • DOI 10.1109/TPWRS.2005.852115
    • A. Keane and M. O'Malley, "Optimal allocation of embedded generation on distribution networks," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1640-1646, Aug. 2005. (Pubitemid 41300979)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1640-1646
    • Keane, A.1    O'Malley, M.2
  • 41
    • 84864279142 scopus 로고    scopus 로고
    • Effective wind farm sizing method for weak power systems using critical modes of voltage instability
    • Aug.
    • A. A. Tamimi, A. Pahwa, and S. Starrett, "Effective wind farm sizing method for weak power systems using critical modes of voltage instability," IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1610-1617, Aug. 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.3 , pp. 1610-1617
    • Tamimi, A.A.1    Pahwa, A.2    Starrett, S.3
  • 42
    • 77951667814 scopus 로고    scopus 로고
    • Maximizing firm wind connection to security constrained transmission networks
    • May
    • D. J. Burke and M. J. O'Malley, "Maximizing firm wind connection to security constrained transmission networks," IEEE Trans. Power Syst., vol. 25, no. 2, pp. 749-759, May 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.2 , pp. 749-759
    • Burke, D.J.1    O'Malley, M.J.2
  • 43
    • 84865037466 scopus 로고    scopus 로고
    • Review of distributed generation planning: Objectives, constraints, and algorithms
    • 2011
    • R. P. Payasi1, A. K. Singh, and D. Singh, "Review of distributed generation planning: Objectives, constraints, and algorithms," Int. J. Eng., Sci., Technol., MultiCraft Ltd., vol. 3, no. 3, pp. 133-153, 2011.
    • Int. J. Eng., Sci., Technol., MultiCraft Ltd. , vol.3 , Issue.3 , pp. 133-153
    • Payasi, R.P.1    Singh, A.K.2    Singh, D.3
  • 45
    • 84885209681 scopus 로고    scopus 로고
    • Optimal distributed generation placement in power distribution networks: Models, methods, and future research
    • to be published
    • P. S. Georgilakis and N. D. Hatziargyriou, "Optimal distributed generation placement in power distribution networks: Models, methods, and future research," IEEE Trans. Power Syst., to be published.
    • IEEE Trans. Power Syst
    • Georgilakis, P.S.1    Hatziargyriou, N.D.2
  • 46
    • 84897617378 scopus 로고    scopus 로고
    • United Kingdom Generic Distribution System (UKGDS). [Online]. Available
    • Distributed Generation and Sustainable Electrical Energy Centre. United Kingdom Generic Distribution System (UKGDS). [Online]. Available: http://www.sedg.ac.uk.
    • And Sustainable Electrical Energy Centre
    • Generation, D.1
  • 47
    • 70349579256 scopus 로고    scopus 로고
    • A review of grid code technical requirements for wind farms
    • Sep.
    • M. Tsili and S. Papathanassiou, "A review of grid code technical requirements for wind farms," IET Renew. Power Gener., vol. 3, no. 3, pp. 308-332, Sep. 2009.
    • (2009) IET Renew. Power Gener. , vol.3 , Issue.3 , pp. 308-332
    • Tsili, M.1    Papathanassiou, S.2
  • 48
    • 84961120432 scopus 로고    scopus 로고
    • General Algebraic Modeling System (GAMS) [Online]. Available
    • General Algebraic Modeling System (GAMS), GAMS-A User's Guide, 2012. [Online]. Available: http://www.gams.com/.
    • (2012) GAMS-A User's Guide


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.