메뉴 건너뛰기




Volumn 4, Issue 3, 2010, Pages 283-297

Coordinated output control of multiple distributed generation schemes

Author keywords

[No Author keywords available]

Indexed keywords

CONTROL SOLUTIONS; CONTROL STRATEGIES; DISTRIBUTED GENERATION; DISTRIBUTED GENERATIONS; DISTRIBUTION NETWORK; ENERGY YIELDS; HISTORICAL DATA; NET PRESENT VALUE; OPEN-LOOP SIMULATIONS; OUTPUT CONTROL; POWER FLOWS; POWER SYSTEMS; THERMAL RATINGS;

EID: 77954579861     PISSN: 17521416     EISSN: 17521424     Source Type: Journal    
DOI: 10.1049/iet-rpg.2009.0142     Document Type: Article
Times cited : (53)

References (39)
  • 1
    • 34247636821 scopus 로고    scopus 로고
    • Electric power systems research on dispersed generation
    • 0378-7796
    • Strbac, G.: 'Electric power systems research on dispersed generation', , Electr. Power Syst. Res., 2007, 77, (9), p. 1143-1147, 0378-7796
    • (2007) , Electr. Power Syst. Res. , vol.77 , Issue.9 , pp. 1143-1147
    • Strbac, G.1
  • 2
    • 70349487331 scopus 로고    scopus 로고
    • Distributed generation output control for network power flow management
    • Jupe, S.C.E. Taylor, P.C.: 'Distributed generation output control for network power flow management', , IET Proc. RPG, 2009, 3, (4), p. 371-386
    • (2009) IET Proc. RPG , vol.3 , Issue.4 , pp. 371-386
    • Jupe, S.C.E.1    Taylor, P.C.2
  • 4
    • 77952768601 scopus 로고    scopus 로고
    • Aeolian uprating: how wind farms can solve their own transmission problems
    • BerlinGermanyJuly
    • BelbenP.B. ZieslerC.D.: 'Aeolian uprating: how wind farms can solve their own transmission problems'Proc. World Wind Energy Conf.BerlinGermanyJuly 2002
    • (2002) Proc. World Wind Energy Conf.
    • Belben, P.B.1    Ziesler, C.D.2
  • 5
    • 77952758671 scopus 로고    scopus 로고
    • Optimized size of wind power plant transformer and parallel operation
    • KasselGermany
    • HelmerM.: 'Optimized size of wind power plant transformer and parallel operation'Proc. Wind Power for the 21st CenturyKasselGermany 2000
    • (2000) Proc. Wind Power for the 21st Century
    • Helmer, M.1
  • 6
    • 70450211195 scopus 로고    scopus 로고
    • An investigation into the influence of environmental conditions on power system ratings
    • MichiorriA. TaylorP.C. JupeS.C.E. BerryC.J.: 'An investigation into the influence of environmental conditions on power system ratings'Proc. IMechE A: J. Power Energy2009227(A7)p. 743-757
    • (2009) Proc. IMechE A: J. Power Energy , vol.227 , Issue.7 A , pp. 743-757
    • Michiorri, A.1    Taylor, P.C.2    Jupe, S.C.E.3    Berry, C.J.4
  • 7
    • 77954153757 scopus 로고    scopus 로고
    • Dynamic thermal rating and active control for improved distribution network utilization
    • MilanItalyJune 3-5
    • NeumannA. TaylorP.C. JupeS.C.E.: et al. 'Dynamic thermal rating and active control for improved distribution network utilization'Proc. PowerGridMilanItalyJune 3-5 2008
    • (2008) Proc. PowerGrid
    • Neumann, A.1    Taylor, P.C.2    Jupe, S.C.E.3
  • 8
    • 77956329845 scopus 로고    scopus 로고
    • Guidelines for actively managing power flows associated with the connection of a single distributed generation plant
    • February Engineering Technical Report 124
    • 'Guidelines for actively managing power flows associated with the connection of a single distributed generation plant'Energy Networks AssociationFebruary 2004Engineering Technical Report 124
    • (2004) Energy Networks Association
  • 9
    • 27144449424 scopus 로고    scopus 로고
    • Solutions for the connection and operation of distributed generation
    • July
    • CollinsonA. DaiF. BeddoesA. CrabtreeJ.: 'Solutions for the connection and operation of distributed generation'DTIJuly 2003
    • (2003) DTI
    • Collinson, A.1    Dai, F.2    Beddoes, A.3    Crabtree, J.4
  • 10
    • 28644440179 scopus 로고    scopus 로고
    • Network management systems for active distribution networks - a feasibility study
    • SP Power Systems Ltd.Scottish Power Plc.
    • RobertsD.A.: 'Network management systems for active distribution networks - a feasibility study'(SP Power Systems Ltd.Scottish Power Plc. 2004)
    • (2004)
    • Roberts, D.A.1
  • 11
    • 76449096427 scopus 로고    scopus 로고
    • Facilitate generation connections on Orkney by automatic distribution network management
    • Scottish and Southern Energy Scottish Hydro-Electric Power Distribution Limited
    • 'Facilitate generation connections on Orkney by automatic distribution network management'(Scottish and Southern Energy 2004),Scottish Hydro-Electric Power Distribution Limited
    • (2004)
  • 12
    • 50249086354 scopus 로고    scopus 로고
    • Active power-flow management utilising operating margins for the increased connection of distributed generation
    • CurrieR.A.F. AultG.W. FooteC. McDonaldJ.R.: 'Active power-flow management utilising operating margins for the increased connection of distributed generation'IET Proc. GTD20071(1)p. 197-202
    • (2007) IET Proc. GTD , vol.1 , Issue.1 , pp. 197-202
    • Currie, R.A.F.1    Ault, G.W.2    Foote, C.3    McDonald, J.R.4
  • 14
    • 4043183268 scopus 로고    scopus 로고
    • Application of interruptible contracts to increase wind-power penetration in congested areas
    • 10.1109/TPWRS.2004.8317020885-8950
    • KabourisJ. VournasC.D.: 'Application of interruptible contracts to increase wind-power penetration in congested areas'IEEE Trans. Power Syst.200419(3)p. 1642-164910.1109/TPWRS.2004.8317020885-8950
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1642-1649
    • Kabouris, J.1    Vournas, C.D.2
  • 15
    • 34249093562 scopus 로고    scopus 로고
    • Optimal controllability of wind generators in a delegated dispatch
    • 0378-7796
    • CastronuovoE. Martinez-CrespoJ. UsaolaJ.: 'Optimal controllability of wind generators in a delegated dispatch'Electr. Power Syst. Res.200777(10)p. 1442-14480378-7796
    • (2007) Electr. Power Syst. Res. , vol.77 , Issue.10 , pp. 1442-1448
    • Castronuovo, E.1    Martinez-Crespo, J.2    Usaola, J.3
  • 16
    • 67349129209 scopus 로고    scopus 로고
    • Operational impacts of wind generation on California power systems
    • 0885-8950
    • MakarovY.V. LoutanC. MaJ. de MelloP.: 'Operational impacts of wind generation on California power systems'IEEE Trans. Power Syst.200924(2)p. 1039-10500885-8950
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 1039-1050
    • Makarov, Y.V.1    Loutan, C.2    Ma, J.3    de Mello, P.4
  • 18
    • 33646360809 scopus 로고    scopus 로고
    • Optimum generation control in wind parks when carrying out system operator requests
    • 10.1109/TPWRS.2005.8619960885-8950
    • de AlmeidaR.G. CastronuovoE.D. Peças LopesJ.A.: 'Optimum generation control in wind parks when carrying out system operator requests'IEEE Trans. Power Syst.200621(2)p. 718-72510.1109/TPWRS.2005.8619960885-8950
    • (2006) IEEE Trans. Power Syst. , vol.21 , Issue.2 , pp. 718-725
    • de Almeida, R.G.1    Castronuovo, E.D.2    Peças Lopes, J.A.3
  • 19
    • 0036601544 scopus 로고    scopus 로고
    • Automatic generation control of a wind farm with variable speed wind turbines
    • 10.1109/TEC.2002.10094810885-8969
    • Rodriguez-AmenedoJ.L. ArnalteS. BurgosJ.C.: 'Automatic generation control of a wind farm with variable speed wind turbines'IEEE Trans. Energy Convers.200217(2)p. 279-28410.1109/TEC.2002.10094810885-8969
    • (2002) IEEE Trans. Energy Convers. , vol.17 , Issue.2 , pp. 279-284
    • Rodriguez-Amenedo, J.L.1    Arnalte, S.2    Burgos, J.C.3
  • 20
    • 20544434432 scopus 로고    scopus 로고
    • Speed and active power control of hydro turbine unit
    • 10.1109/TEC.2004.8372780885-8969
    • StrahB. KujacaO. VukicZ.: 'Speed and active power control of hydro turbine unit'IEEE Trans. Energy Convers.200520(2)p. 424-43410.1109/TEC.2004.8372780885-8969
    • (2005) IEEE Trans. Energy Convers. , vol.20 , Issue.2 , pp. 424-434
    • Strah, B.1    Kujaca, O.2    Vukic, Z.3
  • 21
    • 61849129655 scopus 로고    scopus 로고
    • Assessing the strategic benefits of distributed generation ownership for DNOs
    • SianoP. OchoaL.F. HarrisonG.P. PiccoloA.: 'Assessing the strategic benefits of distributed generation ownership for DNOs'IET Proc. GTD.20093(3)p. 225-236
    • (2009) IET Proc. GTD. , vol.3 , Issue.3 , pp. 225-236
    • Siano, P.1    Ochoa, L.F.2    Harrison, G.P.3    Piccolo, A.4
  • 22
    • 0003726276 scopus 로고    scopus 로고
    • Power generationoperation and control
    • Wiley
    • WoodA.J. WollenbergB.F.: 'Power generationoperation and control'(Wiley 1996)p. 421-427
    • (1996) , pp. 421-427
    • Wood, A.J.1    Wollenberg, B.F.2
  • 23
    • 34248205012 scopus 로고    scopus 로고
    • Generation curtailment to manage voltage constraints in distribution networks
    • ZhouQ. BialekJ.W.: 'Generation curtailment to manage voltage constraints in distribution networks'IET Proc. GTD20071(3)p. 492-498
    • (2007) IET Proc. GTD , vol.1 , Issue.3 , pp. 492-498
    • Zhou, Q.1    Bialek, J.W.2
  • 24
    • 0030189160 scopus 로고    scopus 로고
    • Tracing the flow of electricity
    • BialekJ.W.: 'Tracing the flow of electricity'IET Proc. GTD1996143p. 313-320
    • (1996) IET Proc. GTD , vol.143 , pp. 313-320
    • Bialek, J.W.1
  • 25
    • 0033221449 scopus 로고    scopus 로고
    • Tracing active and reactive power between generators and loads using real and imaginary currents
    • 10.1109/59.8018900885-8950
    • KirschenD. StrbacG.: 'Tracing active and reactive power between generators and loads using real and imaginary currents'IEEE Trans. Power Syst.14(4)p. 1312-131810.1109/59.8018900885-8950
    • IEEE Trans. Power Syst. , vol.14 , Issue.4 , pp. 1312-1318
    • Kirschen, D.1    Strbac, G.2
  • 26
    • 35348891981 scopus 로고    scopus 로고
    • Sizing of distributed generation plant through techno-economic feasibility assessment
    • October
    • PayyalaS. GreenT.C.: 'Sizing of distributed generation plant through techno-economic feasibility assessment'Power Engineering Society General MeetingOctober 2006
    • (2006) Power Engineering Society General Meeting
    • Payyala, S.1    Green, T.C.2
  • 27
    • 77954589684 scopus 로고    scopus 로고
    • Strategic Environmental Assessment: 'Wind background - cost of wind power generation'. DECC2004available at: http://www.offshore-sea.org.ukaccessed March 2009
    • Strategic Environmental Assessment: 'Wind background - cost of wind power generation'. DECC2004available at: http://www.offshore-sea.org.ukaccessed March 2009
  • 28
    • 77954571713 scopus 로고    scopus 로고
    • European Commission: 'Quarterly review of european gas and electricity prices' (Luxembourg2005)
    • European Commission: 'Quarterly review of european gas and electricity prices' (Luxembourg2005)
  • 29
    • 77954608774 scopus 로고    scopus 로고
    • Office of the Gas and Electricity Markets: 'Renewables obligation: Annual Report 2006-2007' (London2008)
    • Office of the Gas and Electricity Markets: 'Renewables obligation: Annual Report 2006-2007' (London2008)
  • 30
    • 77954600482 scopus 로고    scopus 로고
    • DTI: 'Offshore wind energy - wind energy factsheet 1' (London2001)
    • DTI: 'Offshore wind energy - wind energy factsheet 1' (London2001)
  • 31
    • 77954615848 scopus 로고    scopus 로고
    • DECC: 'Cost of and financial support for offshore wind' (London2009)
    • DECC: 'Cost of and financial support for offshore wind' (London2009)
  • 32
    • 77954592268 scopus 로고    scopus 로고
    • SP transmission and distribution: 'Distribution long term development statement for SP Manweb PLC for the years 2005/6 to 2009/10' (SP Manweb plcNovember 2005)
    • SP transmission and distribution: 'Distribution long term development statement for SP Manweb PLC for the years 2005/6 to 2009/10' (SP Manweb plcNovember 2005)
  • 33
    • 79952854877 scopus 로고    scopus 로고
    • Foundations of Fuzzy Control
    • Wiley
    • JantzenJ.: 'Foundations of Fuzzy Control'(Wiley 2007)p. 35-3657-61
    • (2007) , pp. 3657-61
    • Jantzen, J.1
  • 34
    • 77954612566 scopus 로고    scopus 로고
    • UK Meteorological Office: 'Data for the 'Valley' area of the UK'2007available at: www.metoffice.gov.ukaccessed January 2008
    • UK Meteorological Office: 'Data for the 'Valley' area of the UK'2007available at: www.metoffice.gov.ukaccessed January 2008
  • 35
    • 77954585818 scopus 로고    scopus 로고
    • DTI: 'The electricity safetyquality and continuity regulations' (The Stationery Office2002)
    • DTI: 'The electricity safetyquality and continuity regulations' (The Stationery Office2002)
  • 36
    • 0036465326 scopus 로고    scopus 로고
    • Voltage rise: The big issue when connecting embedded generation to long 11 kV overhead lines
    • 10.1049/pe:200201010950-3366
    • MastersC.L.: 'Voltage rise: The big issue when connecting embedded generation to long 11 kV overhead lines'Power Eng. J.200216(1)p. 5-1210.1049/pe:200201010950-3366
    • (2002) Power Eng. J. , vol.16 , Issue.1 , pp. 5-12
    • Masters, C.L.1
  • 37
    • 77954156663 scopus 로고    scopus 로고
    • An active 11 kV voltage controller: practical considerations'. Proc. 17th Conf. on Electricity Distribution CIREDBarcelona12-15 May 2003
    • HindM. JenkinsN. TaylorP.C.: 'An active 11 kV voltage controller: practical considerations'. Proc. 17th Conf. on Electricity Distribution CIREDBarcelona12-15 May 2003
    • Hind, M.1    Jenkins, N.2    Taylor, P.C.3
  • 38
    • 70349482115 scopus 로고    scopus 로고
    • Planning and operating non-firm distributed generation
    • KeaneA. ZhouQ. BialekJ.W. O'MalleyM.: 'Planning and operating non-firm distributed generation'IET Proc. RPG20094(3)p. 455-464
    • (2009) IET Proc. RPG , vol.4 , Issue.3 , pp. 455-464
    • Keane, A.1    Zhou, Q.2    Bialek, J.W.3    O'Malley, M.4
  • 39
    • 77956314052 scopus 로고    scopus 로고
    • Overhead line real-time rating estimation algorithm: description and validation
    • accepted for publication
    • MichiorriA. TaylorP.C. JupeS.C.E.: 'Overhead line real-time rating estimation algorithm: description and validation'Proc. IMechE Part A: J. Power and energy2009accepted for publication
    • (2009) Proc. IMechE Part A: J. Power and energy
    • Michiorri, A.1    Taylor, P.C.2    Jupe, S.C.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.