-
1
-
-
0003438602
-
-
Englewood Cliffs, NJ, USA: Prentice-Hall
-
M. Pinedo, Scheduling Theory, Algorithms and Systems, Englewood Cliffs, NJ, USA: Prentice-Hall, 1995.
-
(1995)
Scheduling Theory, Algorithms and Systems
-
-
Pinedo, M.1
-
2
-
-
0006859287
-
An extension of two machines sequencing problem
-
T. S. Arthanari and K. G. Ramamurthy, "An extension of two machines sequencing problem," Oper. Res., vol. 8, no. 4, pp. 10-22, 1971.
-
(1971)
Oper. Res
, vol.8
, Issue.4
, pp. 10-22
-
-
Arthanari, T.S.1
Ramamurthy, K.G.2
-
3
-
-
0023995996
-
Two-stage, hybrid flowshop scheduling problem
-
Apr
-
J. N. D. Gupta, "Two-stage, hybrid flowshop scheduling problem," J. Oper. Res. Soc., vol. 39, no. 4, pp. 359-364, Apr. 1988.
-
(1988)
J. Oper. Res. Soc
, vol.39
, Issue.4
, pp. 359-364
-
-
Gupta, J.N.D.1
-
4
-
-
0043043661
-
Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
-
J. A. Hoogeveen, J. K. Lenstra, and B. Veltman, "Preemptive scheduling in a two-stage flow shop NP-hard," Eur. J. Oper. Res., vol. 89 no. 1, pp. 172-175, Feb. 1996. (Pubitemid 126386771)
-
(1996)
European Journal of Operational Research
, vol.89
, Issue.1-2
, pp. 172-175
-
-
Hoogeveen, J.A.1
Lenstra, J.K.2
Veltman, B.3
-
5
-
-
0026819776
-
A multi-stage parallel-processor flowshop problem with minimum flowtime
-
Feb
-
C. Rajendran and D. Chaudhuri, "A multi-stage parallel-processor flowshop problem with minimum flowtime," Eur. J. Oper. Res., vol. 57, no. 1, pp. 111-122, Feb. 1992.
-
(1992)
Eur. J. Oper. Res
, vol.57
, Issue.1
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
6
-
-
0030149222
-
A computational study of heuristics for two-stage flexible flowshops
-
A. Guinet, M. M. Solomon, P. K. Kedia, and A. Dussauchoy, "A computational study of heuristics for two-stage flexible flowshops," Int. J. Production Res., vol. 34, no. 5, pp. 1399-1415, May 1996. (Pubitemid 126525266)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.5
, pp. 1399-1415
-
-
Guinet, A.1
Solomon, M.M.2
Kedia, P.K.3
Dussauchoy, A.4
-
7
-
-
0346438804
-
Heuristics for minimizing total weighted tardiness in flexible flow shops
-
Mar./Apr
-
Y. Yang, S. Kreip, and M. Pinedo, "Heuristics for minimizing total weighted tardiness in flexible flow shops," J. Scheduling, vol. 3, no. 2, pp. 89-108, Mar./Apr. 2000.
-
(2000)
J. Scheduling
, vol.3
, Issue.2
, pp. 89-108
-
-
Yang, Y.1
Kreip, S.2
Pinedo, M.3
-
8
-
-
0038183858
-
Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flowshop
-
Sep
-
C. Oguz, M. F. Ercan, T. C. E. Cheng, and Y. F. Fung, "Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flowshop," Eur. J. Oper. Res., vol. 149, no. 2, pp. 390-403, Sep. 2003.
-
(2003)
Eur. J. Oper. Res
, vol.149
, Issue.2
, pp. 390-403
-
-
Oguz, C.1
Ercan, M.F.2
Cheng, T.C.E.3
Fung, Y.F.4
-
9
-
-
18044399490
-
Solving hybrid flow shop problem using energetic reasoning and global operations
-
DOI 10.1016/S0305-0483(01)00040-8, PII S0305048301000408
-
E. Neron, P. Baptiste, and J. N. D. Gupta, "Solving hybrid flow shop problem using energetic reasoning and global operations," Omega, vol. 29, no. 6, pp. 501-511, Dec. 2001. (Pubitemid 33628766)
-
(2001)
Omega
, vol.29
, Issue.6
, pp. 501-511
-
-
Neron, E.1
Baptiste, P.2
Gupta, J.N.D.3
-
10
-
-
1342287338
-
Solving the n-job 3-stage flexible flowshop scheduling problem using an agent-based approach
-
Feb
-
A. Babayan and D. He, "Solving the n-job 3-stage flexible flowshop scheduling problem using an agent-based approach," Int. J. Production Res., vol. 42, no. 4, pp. 777-799, Feb. 2004.
-
(2004)
Int. J. Production Res
, vol.42
, Issue.4
, pp. 777-799
-
-
Babayan, A.1
He, D.2
-
11
-
-
0348167557
-
An immune algorithm approach to the scheduling of a flexible PCB flow shop
-
D. Alisantoso, L. P. Khoo, and P. Y. Jiang, "An immune algorithm approach to the scheduling of a flexible PCB flow shop," Int. J. Advanced Manufacturing Technol., vol. 22, no. 11-12, pp. 819-827, 2003.
-
(2003)
Int. J. Advanced Manufacturing Technol
, vol.22
, Issue.11-12
, pp. 819-827
-
-
Alisantoso, D.1
Khoo, L.P.2
Jiang, P.Y.3
-
12
-
-
3142755746
-
A new approach to solve hybrid flow shop scheduling problems by artificial immune system
-
Aug
-
O. Engin and A. Doyen, "A new approach to solve hybrid flow shop scheduling problems by artificial immune system," Future Generation Comput. Syst., vol. 20, no. 6, pp. 1083-1095, Aug. 2004.
-
(2004)
Future Generation Comput. Syst
, vol.20
, Issue.6
, pp. 1083-1095
-
-
Engin, O.1
Doyen, A.2
-
13
-
-
5144226254
-
Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors-A case study
-
Oct
-
T. Yang, Y. Kuo, and I. Chang, "Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors-A case study," Int. J. Production Res., vol. 42, no. 19, pp. 4015-4030, Oct. 2004.
-
(2004)
Int. J. Production Res
, vol.42
, Issue.19
, pp. 4015-4030
-
-
Yang, T.1
Kuo, Y.2
Chang, I.3
-
14
-
-
53749093099
-
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
-
Mar
-
L. Tang and X. Wang, "A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers," Comput. Oper. Res., vol. 36, no. 3, pp. 907-918, Mar. 2009.
-
(2009)
Comput. Oper. Res
, vol.36
, Issue.3
, pp. 907-918
-
-
Tang, L.1
Wang, X.2
-
15
-
-
2442566880
-
Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach
-
May
-
F. S. Serifoglu and G. Ulusoy, "Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach," J. Oper. Res. Soc., vol. 55, no. 5, pp. 504-512, May. 2004.
-
(2004)
J. Oper. Res. Soc
, vol.55
, Issue.5
, pp. 504-512
-
-
Serifoglu, F.S.1
Ulusoy, G.2
-
16
-
-
21144440772
-
A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
DOI 10.1007/s10951-005-1640-y
-
C. Oguz and M. F. Ercan, "A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks," J. Scheduling, vol. 8, no. 4, pp. 323-351, Jul. 2005. (Pubitemid 40878783)
-
(2005)
Journal of Scheduling
, vol.8
, Issue.4
, pp. 323-351
-
-
Oguz, C.1
Ercan, M.F.2
-
17
-
-
27144540137
-
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
-
DOI 10.1016/j.ejor.2004.06.038, PII S0377221705001451
-
R. Ruiz and C. Maroto, "A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility," Eur. J. Oper. Res., vol. 169, no. 3, pp. 781-800, Mar. 2006 (Pubitemid 41492016)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 781-800
-
-
Ruiz, R.1
Maroto, C.2
-
18
-
-
33845234230
-
Parallel genetic algorithms with migration for the hybrid flow shop scheduling problem
-
Aug
-
K. Belkadi, M. Gourgand, and M. Benyettou, "Parallel genetic algorithms with migration for the hybrid flow shop scheduling problem," J. Appl. Math. Decision Sci., vol. 2006, pp. 1-17, Aug. 2006.
-
(2006)
J. Appl. Math. Decision Sci
, vol.2006
, pp. 1-17
-
-
Belkadi, K.1
Gourgand, M.2
Benyettou, M.3
-
19
-
-
36148996530
-
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
-
Feb
-
D. F. Shiau, S. C. Cheng, and Y. M. Huang, "Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm," Expert Syst. Appl., vol. 34, no. 2, pp. 1133-1143, Feb. 2008.
-
(2008)
Expert Syst. Appl
, vol.34
, Issue.2
, pp. 1133-1143
-
-
Shiau, D.F.1
Cheng, S.C.2
Huang, Y.M.3
-
20
-
-
73849108250
-
An application of effective genetic algorithms for solving hybrid flow shop scheduling problems
-
May
-
C. Kahraman, O. Engin, I. Kaya, and M. Yilmaz, "An application of effective genetic algorithms for solving hybrid flow shop scheduling problems," Int. J. Comput. Intell. Syst., vol. 1, no. 2, pp. 134-147, May 2008.
-
(2008)
Int. J. Comput. Intell. Syst
, vol.1
, Issue.2
, pp. 134-147
-
-
Kahraman, C.1
Engin, O.2
Kaya, I.3
Yilmaz, M.4
-
21
-
-
77956226560
-
An improved hybrid multiobjective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines
-
E. Rashidi, M. Jahandar, and M. Zandieh, "An improved hybrid multiobjective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines," Int. J. Adv. Manufacturing Technol., vol. 49, no. 9-12, pp. 1129-1139, 2010.
-
(2010)
Int. J. Adv. Manufacturing Technol
, vol.49
, Issue.9-12
, pp. 1129-1139
-
-
Rashidi, E.1
Jahandar, M.2
Zandieh, M.3
-
22
-
-
33745125063
-
Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
-
Aug
-
K. C. Ying and S. W. Lin, "Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach," Int. J. Production Res., vol. 44, no. 16, pp. 3161-3177, Aug. 2006.
-
(2006)
Int. J. Production Res
, vol.44
, Issue.16
, pp. 3161-3177
-
-
Ying, K.C.1
Lin, S.W.2
-
23
-
-
78549268840
-
A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop
-
S. Khalouli, F. Ghedjati, and A. Hamzaoui, "A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop," Eng. Appl. Artif. Intell., vol. 23, no. 5, pp. 765-771, 2010.
-
(2010)
Eng. Appl. Artif. Intell
, vol.23
, Issue.5
, pp. 765-771
-
-
Khalouli, S.1
Ghedjati, F.2
Hamzaoui, A.3
-
24
-
-
48249084195
-
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
Sep
-
C. T. Tseng and C. J. Liao, "A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks," Int. J. Production Res., vol. 46, no. 17, pp. 4655-4670, Sep. 2008.
-
(2008)
Int. J. Production Res
, vol.46
, Issue.17
, pp. 4655-4670
-
-
Tseng, C.T.1
Liao, C.J.2
-
25
-
-
78049233716
-
An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry
-
Nov
-
L. Tang and X. Wang, "An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry," IEEE Trans. Control Syst. Technol., vol. 18, no. 6, pp. 1303-1314, Nov. 2010.
-
(2010)
IEEE Trans. Control Syst. Technol
, vol.18
, Issue.6
, pp. 1303-1314
-
-
Tang, L.1
Wang, X.2
-
26
-
-
84865392425
-
A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks
-
M. R. Singh and S. S. Mahapatra, "A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks," Int. J. Adv. Manuf. Technol., vol. 62, nos. 1-4, p. 267, 2011.
-
(2011)
Int. J. Adv. Manuf. Technol
, vol.62
, Issue.1-4
, pp. 267
-
-
Singh, M.R.1
Mahapatra, S.S.2
-
27
-
-
79953039544
-
A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan
-
H. M. Wang, F. D. Chou, and F. C. Wu, "A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan," Int. J. Adv. Manuf. Technol., vol. 53, no. 5-8, pp. 761-776, 2011.
-
(2011)
Int. J. Adv. Manuf. Technol
, vol.53
, Issue.5-8
, pp. 761-776
-
-
Wang, H.M.1
Chou, F.D.2
Wu, F.C.3
-
28
-
-
52049090864
-
A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times and dual criteria
-
Feb
-
J. Jungwattanakit, M. Reodecha, P. Chaovalitwongse, and F. Werner, "A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times and dual criteria," Comput. Oper. Res., vol. 36, no. 2, pp. 358-378, Feb. 2009.
-
(2009)
Comput. Oper. Res
, vol.36
, Issue.2
, pp. 358-378
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
29
-
-
75849147656
-
The hybrid flow shop scheduling problem
-
Aug
-
R. Ruiz and J. A. Vazquez-Rodriguez, "The hybrid flow shop scheduling problem," Eur. J. Oper. Res., vol. 205, no. 1, pp. 1-18, Aug. 2010.
-
(2010)
Eur. J. Oper. Res
, vol.205
, Issue.1
, pp. 1-18
-
-
Ruiz, R.1
Vazquez-Rodriguez, J.A.2
-
31
-
-
77957863557
-
Firefly algorithms for multimodal optimization
-
X. S. Yang, "Firefly algorithms for multimodal optimization," in Proc. SAGA, LNCS 5792, 2009, pp. 169-178.
-
(2009)
Proc. SAGA, LNCS
, vol.5792
, pp. 169-178
-
-
Yang, X.S.1
-
32
-
-
70450219535
-
Firefly algorithm for continuous constrained optimization tasks
-
Oct
-
S. Lukasik and S. Zak, "Firefly algorithm for continuous constrained optimization tasks," in Proc. ICCCI, vol. 5796. Oct. 2009, pp. 97-106.
-
(2009)
Proc. ICCCI
, vol.5796
, pp. 97-106
-
-
Lukasik, S.1
Zak, S.2
-
33
-
-
79953855364
-
Firefly algorithm, stochastic test functions and design optimization
-
X. S. Yang, "Firefly algorithm, stochastic test functions and design optimization," Int. J. Bio-Inspired Comput., vol. 2, no. 2, pp. 78-84, 2010.
-
(2010)
Int. J. Bio-Inspired Comput
, vol.2
, Issue.2
, pp. 78-84
-
-
Yang, X.S.1
-
34
-
-
79960566619
-
A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
-
M. K. Sayadia, R. Ramezaniana, and N. Ghaffari-Nasab, "A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems," Int. J. Industrial Eng. Comput., vol. 1, no. 1, pp. 1-10, 2010.
-
(2010)
Int. J. Industrial Eng. Comput
, vol.1
, Issue.1
, pp. 1-10
-
-
Sayadia, M.K.1
Ramezaniana, R.2
Ghaffari-Nasab, N.3
-
35
-
-
79960593394
-
Bees and firefly algorithms for noisy non-linear optimization problems
-
N. Chai-ead, P. Aungkulanon, and P. Luangpaiboon, "Bees and firefly algorithms for noisy non-linear optimization problems," in Proc. Int. MultiConf. Eng. Comput. Scientists, 2011, pp. 1449-1454.
-
(2011)
Proc. Int. MultiConf. Eng. Comput. Scientists
, pp. 1449-1454
-
-
Chai-Ead, N.1
Aungkulanon, P.2
Luangpaiboon, P.3
-
36
-
-
84872399485
-
Firefly based feature selection approach
-
Jul
-
H. Banati and M. Bajaj, "Firefly based feature selection approach," Int. J. Comput. Sci. Issues, vol. 8, no. 2, pp. 473-480, Jul. 2011.
-
(2011)
Int. J. Comput. Sci. Issues
, vol.8
, Issue.2
, pp. 473-480
-
-
Banati, H.1
Bajaj, M.2
-
37
-
-
84863606098
-
Application of the firefly algorithm for solving the economic emissions load dispatch problem
-
Dec
-
T. Apostolopoulos and A. Vlachos, "Application of the firefly algorithm for solving the economic emissions load dispatch problem," Int. J. Combinatorics, vol. 2011. pp. 1-23, Dec. 2011.
-
(2011)
Int. J. Combinatorics
, vol.2011
, pp. 1-23
-
-
Apostolopoulos, T.1
Vlachos, A.2
-
38
-
-
80051741332
-
Firefly and artificial bees colony algorithm for synthesis of scanned and broadside linear array antenna
-
B. Basu and G. K. Mahanti, "Firefly and artificial bees colony algorithm for synthesis of scanned and broadside linear array antenna," Progress Electromagn. Res. B., vol. 32, pp. 169-190, 2011.
-
(2011)
Progress Electromagn. Res. B
, vol.32
, pp. 169-190
-
-
Basu, B.1
Mahanti, G.K.2
-
39
-
-
80055049702
-
Mixed variable structural optimization using firefly algorithm
-
Dec
-
A. H. Gandomi, X. S. Yang, and A. H. Alavi, "Mixed variable structural optimization using firefly algorithm," Comput. Structures, vol. 89, no. 23-24, pp. 2325-2336, Dec. 2011.
-
(2011)
Comput. Structures
, vol.89
, Issue.23-24
, pp. 2325-2336
-
-
Gandomi, A.H.1
Yang, X.S.2
Alavi, A.H.3
-
40
-
-
84875502179
-
Optimum design of structures using an improved firefly algorithm
-
S. Kazemzadeh Azad and S. Kazemzadeh Azad, "Optimum design of structures using an improved firefly algorithm," Int. J. Optimization Civil Eng., vol. 1, no. 2, pp. 327-340, 2011.
-
(2011)
Int. J. Optimization Civil Eng
, vol.1
, Issue.2
, pp. 327-340
-
-
Kazemzadeh Azad, S.1
Kazemzadeh Azad, S.2
-
41
-
-
80053303889
-
Evolutionary discrete firefly algorithm for travelling salesman problem
-
G. K. Jati and S. Suyanto, "Evolutionary discrete firefly algorithm for travelling salesman problem," in Proc. ICAIS2011, LNAI 6943, pp. 393-403, 2011.
-
(2011)
Proc. ICAIS2011, LNAI
, vol.6943
, pp. 393-403
-
-
Jati, G.K.1
Suyanto, S.2
-
42
-
-
84874822533
-
Application of firefly algorithm and its parameter setting for job shop scheduling
-
Jan.-Apr
-
A. Khadwilard, S. Chansombat, T. Thepphakorn, P. Thapatsuwan, W. Chainat, and P. Pongcharoen, "Application of firefly algorithm and its parameter setting for job shop scheduling," J. Ind. Technol., vol. 8, no. 1, Jan.-Apr. 2012.
-
(2012)
J. Ind. Technol
, vol.8
, Issue.1
-
-
Khadwilard, A.1
Chansombat, S.2
Thepphakorn, T.3
Thapatsuwan, P.4
Chainat, W.5
Pongcharoen, P.6
-
43
-
-
84855993522
-
Firefly algorithm for solving non-convex economic dispatch problems with valve loading effect
-
X. S. Yang, S. S. Hosseini, and A. H. Gandomi, "Firefly algorithm for solving non-convex economic dispatch problems with valve loading effect," Appl. Soft Comput., vol. 12, no. 3, pp. 1180-1186, 2012.
-
(2012)
Appl. Soft Comput
, vol.12
, Issue.3
, pp. 1180-1186
-
-
Yang, X.S.1
Hosseini, S.S.2
Gandomi, A.H.3
-
44
-
-
0001096735
-
Genetic algorithm and random keys for sequencing and optimization
-
J. C. Bean, "Genetic algorithm and random keys for sequencing and optimization," ORSA J. Comput., vol. 6, no. 2, pp. 154-160, 1994.
-
(1994)
ORSA J. Comput
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
45
-
-
33751236810
-
A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
-
DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
-
M. Faith Tasgetiren, Y. C. Liang, M. Sevkli, and G. Gencyilmaz, "A particle swarm optimization algorithm for makespan and total flowtime in the permutation flowshop sequencing problem," Eur. J. Oper. Res., vol. 177, pp. 1930-1947, 2007. (Pubitemid 44780934)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1930-1947
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
|