메뉴 건너뛰기




Volumn 60, Issue 1, 2014, Pages 35-42

Optimization of a product batch quantity

Author keywords

Interoperation time; Lead time; Optimal batch; Setup time; Storage costs; Tied up capital; Time per unit; Turnaround time

Indexed keywords


EID: 84894676762     PISSN: 00392480     EISSN: None     Source Type: Journal    
DOI: 10.5545/sv-jme.2013.1009     Document Type: Article
Times cited : (9)

References (18)
  • 4
    • 0038813225 scopus 로고
    • Verlag, München, Wien, Band 3, Carl Hanser
    • Aggteleky, B. (1990). Fabrikplanung, Band 3, Carl Hanser Verlag, München, Wien.
    • (1990) Fabrikplanung
    • Aggteleky, B.1
  • 13
    • 78649832355 scopus 로고    scopus 로고
    • Teamwork as a Precondition for Simultaneous Product Realization
    • DOI:10.5545/sv-jme.2012.420
    • Rihar, L., Kušlar, J., Duhovnik, J., Starbek, M. (2010). Teamwork as a Precondition for Simultaneous Product Realization. Concurrent Engineering: Research and Applications, vol. 18, no. 4, p. 261-273, DOI:10.5545/sv-jme.2012. 420.
    • (2010) Concurrent Engineering: Research and Applications , vol.18 , Issue.4 , pp. 261-273
    • Rihar, L.1    Kušlar, J.2    Duhovnik, J.3    Starbek, M.4
  • 18
    • 84868158599 scopus 로고    scopus 로고
    • Integration of simulation and lean tools in effective production systems case study
    • DOI:10.5545/sv-jme.2012.387
    • Boži?kovi?, R., Radošlevi?, M., ?osi?, I., Sokovi?, M., Rikalovi?. A. (2012). Integration of Simulation and Lean Tools in Effective Production Systems -Case Study, Strojnišlki vestnik -Journal of Mechanical Egineering, vol. 58, no. 11, p. 642-652, DOI:10.5545/sv-jme.2012.387.
    • (2012) Strojnišlki Vestnik -Journal of Mechanical Egineering , vol.58 , Issue.11 , pp. 642-652
    • Božikovi, R.1    Radošlevi, M.2    Osi, I.3    Sokovi, M.4    Rikalovi, A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.