메뉴 건너뛰기




Volumn 56, Issue 12, 2010, Pages 833-845

Reduction of machine setup time

Author keywords

Continuous improvement; Machine setup time; Microelements; SMED workshop; Teamwork

Indexed keywords

CONTINUOUS IMPROVEMENTS; MACHINE SET-UP TIME; MICROELEMENTS; SMED WORKSHOP; TEAMWORK;

EID: 78650287970     PISSN: 00392480     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (28)

References (14)
  • 4
    • 60949083486 scopus 로고    scopus 로고
    • Process improvement: Performance analysis of the setup time reduction - SMED in automotive industry
    • Cakmakci, M. (2009). Process improvement: performance analysis of the setup time reduction - SMED in automotive industry. Internation Journal of Advanced Manufacturing Technology, vol. 41, p. 168- 179.
    • (2009) Internation Journal of Advanced Manufacturing Technology , vol.41 , pp. 168-179
    • Cakmakci, M.1
  • 9
    • 0034179719 scopus 로고    scopus 로고
    • Extended ABC analysis
    • Starbek, M., Petrišic, J., Kušar, J. (2000). Extended ABC analysis. Strojarstvo, vol. 42, no. 3-4, p. 103-108.
    • (2000) Strojarstvo , vol.42 , Issue.3-4 , pp. 103-108
    • Starbek, M.1    Petrišic, J.2    Kušar, J.3
  • 10
    • 29544432187 scopus 로고    scopus 로고
    • The process of manufacturingcapability development in industrial cluster - A case study of the automotive cluster of Slovenia
    • Fulder, T., Palcic, I., Polajnar, A., Pižmoht, P. (2005). The process of manufacturingcapability development in industrial cluster - A case study of the automotive cluster of Slovenia, Strojniški vestnik - Journal of Mechanical Engineering, vol. 51, no. 12, p. 771-785.
    • (2005) Strojniški vestnik - Journal of Mechanical Engineering , vol.51 , Issue.12 , pp. 771-785
    • Fulder, T.1    Palcic, I.2    Polajnar, A.3    Pižmoht, P.4
  • 11
    • 52249105793 scopus 로고    scopus 로고
    • Assembly initiated production as a prerequisite for mass customization and effective manufacturing
    • Anišic, Z., Krsmanovic, C. (2008). Assembly initiated production as a prerequisite for mass customization and effective manufacturing. Strojniški vestnik - Journal of Mechanical Engineering, vol. 54, no. 9, p. 607-618.
    • (2008) Strojniški vestnik - Journal of Mechanical Engineering , vol.54 , Issue.9 , pp. 607-618
    • Anišic, Z.1    Krsmanovic, C.2
  • 12
    • 77953159287 scopus 로고    scopus 로고
    • INTERPLACE Belbin Associates
    • INTERPLACE (2008). User's manual, Belbin Associates.
    • (2008) User's Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.