Volumn 32, Issue 3, 2014, Pages 412-422

An optimization method for selecting project risk response strategies

Author keywords

Optimization; Project scope; Risk response strategy; Trade off; Work breakdown structure (WBS)

Indexed keywords

ECONOMIC AND SOCIAL EFFECTS; MANAGERS; OPTIMAL SYSTEMS; OPTIMIZATION; RISK MANAGEMENT;

EID: 84894282660     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2013.06.006     Document Type: Article
Times cited : (111)

References (27)
  • 2
    • 0034818337 scopus 로고    scopus 로고
    • An integrated approach for risk response development in project planning
    • Ben-David I., Raz T. An integrated approach for risk response development in project planning. Journal of the Operational Research Society 2001, 52:14-25.
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 14-25
    • Ben-David, I.1    Raz, T.2
  • 4
    • 0027928199 scopus 로고
    • Risk analysis-some practical suggestions
    • Buchan D.H. Risk analysis-some practical suggestions. Cost Engineering 1994, 36:29-34.
    • (1994) Cost Engineering , vol.36 , pp. 29-34
    • Buchan, D.H.1
  • 5
    • 0035476791 scopus 로고    scopus 로고
    • A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    • Carr V., Tah J.H.M. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. Advances in Engineering Software 2001, 32:847-857.
    • (2001) Advances in Engineering Software , vol.32 , pp. 847-857
    • Carr, V.1    Tah, J.H.M.2
  • 8
    • 0242494583 scopus 로고    scopus 로고
    • Developing a risk management matrix for effective project planning-an empirical study
    • Datta S., Mukherjee S.K. Developing a risk management matrix for effective project planning-an empirical study. Project Management Journal 2001, 32:45-57.
    • (2001) Project Management Journal , vol.32 , pp. 45-57
    • Datta, S.1    Mukherjee, S.K.2
  • 9
    • 84892290924 scopus 로고    scopus 로고
    • Applied project risk management-introducing the project risk management loop of control
    • Elkjaer M., Felding F. Applied project risk management-introducing the project risk management loop of control. International Project Management Journal 1999, 5:16-25.
    • (1999) International Project Management Journal , vol.5 , pp. 16-25
    • Elkjaer, M.1    Felding, F.2
  • 15
    • 0035254835 scopus 로고    scopus 로고
    • Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
    • Jaafari A. Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. International Journal of Project Management 2001, 19:89-101.
    • (2001) International Journal of Project Management , vol.19 , pp. 89-101
    • Jaafari, A.1
  • 16
    • 73249139106 scopus 로고    scopus 로고
    • A risk mitigation methodology for new product and process design in concurrent engineering projects
    • Kayis B., Arndt G., Zhou M., Amornsawadwatana S. A risk mitigation methodology for new product and process design in concurrent engineering projects. Annals of the CIRP 2007, 56:167-170.
    • (2007) Annals of the CIRP , vol.56 , pp. 167-170
    • Kayis, B.1    Arndt, G.2    Zhou, M.3    Amornsawadwatana, S.4
  • 20
    • 24744439200 scopus 로고    scopus 로고
    • Selection of technical risk responses for efficient contingencies
    • Kujawski E. Selection of technical risk responses for efficient contingencies. Systems Engineering 2002, 5:194-212.
    • (2002) Systems Engineering , vol.5 , pp. 194-212
    • Kujawski, E.1
  • 21
    • 80054954897 scopus 로고    scopus 로고
    • Project risk management processes: improving coordination using a clustering approach
    • Marle F., Vidal L. Project risk management processes: improving coordination using a clustering approach. Research in Engineering Design 2011, 22:189-206.
    • (2011) Research in Engineering Design , vol.22 , pp. 189-206
    • Marle, F.1    Vidal, L.2
  • 25
    • 84894287441 scopus 로고    scopus 로고
    • PMI, A Guide to The Project Management Body of Knowledge PMBOK Guide, third edition. USA: Project Management Institute Inc., Newtown Square, Pa.
    • PMI, 2004. A Guide to The Project Management Body of Knowledge PMBOK Guide, third edition. USA: Project Management Institute Inc., Newtown Square, Pa.
    • (2004)
  • 26
    • 63849343462 scopus 로고    scopus 로고
    • An integrated methodology for assessment and selection of the project risk response actions
    • Seyedhoseini S.M., Noori S., Hatefi M.A. An integrated methodology for assessment and selection of the project risk response actions. Risk Analysis 2009, 29:752-763.
    • (2009) Risk Analysis , vol.29 , pp. 752-763
    • Seyedhoseini, S.M.1    Noori, S.2    Hatefi, M.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.