메뉴 건너뛰기




Volumn 22, Issue 3, 2011, Pages 189-206

Project risk management processes: Improving coordination using a clustering approach

Author keywords

Change management; Complex interactions organizational reconfiguration Clustering; Project risk management

Indexed keywords

BROKEN DOWN; CHANGE MANAGEMENT; CIVIL ENGINEERING INDUSTRY; CLUSTERING APPROACH; COMPLEX INTERACTION; COMPLEX PROJECTS; COORDINATED DECISION; INTERACTION RATE; MATHEMATICAL FORMULATION; MATRIX REPRESENTATION; PROJECT RISK; PROJECT RISK MANAGEMENT; PROJECT RISK MANAGEMENT PROCESS; PUBLIC PRIVATE PARTNERSHIPS;

EID: 80054954897     PISSN: 09349839     EISSN: 14356066     Source Type: Journal    
DOI: 10.1007/s00163-011-0106-9     Document Type: Article
Times cited : (33)

References (46)
  • 1
    • 0030212023 scopus 로고    scopus 로고
    • The concept of project complexity-A review
    • Baccarini D (1996) The concept of project complexity-a review. Int J Project Manag 14(4):201-204
    • (1996) Int J Project Manag , vol.14 , Issue.4 , pp. 201-204
    • Baccarini, D.1
  • 2
    • 0032647691 scopus 로고    scopus 로고
    • Information analysis in a distributed dynamic group technology method
    • Ben-Arieh D, Sreenivasan R (1999) Information analysis in a distributed dynamic group technology method. International J Product Econ 60-61:427-432
    • (1999) International J Product Econ , vol.60-61 , pp. 427-432
    • Ben-Arieh, D.1    Sreenivasan, R.2
  • 4
    • 0037352301 scopus 로고    scopus 로고
    • Decomposition of interdependent task group for concurrent engineering
    • Chen S, Lin L (2003) Decomposition of interdependent task group for concurrent engineering. Comput Indus Eng 44(3):435-459
    • (2003) Comput Indus Eng , vol.44 , Issue.3 , pp. 435-459
    • Chen, S.1    Lin, L.2
  • 5
    • 10244247712 scopus 로고    scopus 로고
    • Predicting change propagation in complex design
    • doi:10.1115/1.1765117
    • Clarkson J, Simons C, Eckert C (2004) Predicting change propagation in complex design. J Mech Des 126. doi:10.1115/1.1765117
    • (2004) J Mech des , vol.126
    • Clarkson, J.1    Simons, C.2    Eckert, C.3
  • 6
    • 33646546673 scopus 로고    scopus 로고
    • A hierarchical clustering algorithm based on fuzzy graph connectedness
    • DOI 10.1016/j.fss.2006.01.001, PII S0165011406000029
    • Dong Y, Zhuang Y, Chen K, Tai X (2006) A hierarchical clustering algorithm based on fuzzy graph connectedness. Fuzzy Sets Syst 157:1760-1774 (Pubitemid 43729501)
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.13 , pp. 1760-1774
    • Dong, Y.1    Zhuang, Y.2    Chen, K.3    Tai, X.4
  • 9
    • 4644346142 scopus 로고    scopus 로고
    • Change and customisation in complex engineering domains
    • doi: 10.1007/s00163-003-0031-7
    • Eckert C, Clarkson J, Zanker W (2004) Change and customisation in complex engineering domains. Res Eng Des 15:1-21. doi: 10.1007/s00163-003-0031-7
    • (2004) Res Eng des , vol.15 , pp. 1-21
    • Eckert, C.1    Clarkson, J.2    Zanker, W.3
  • 10
    • 0003734838 scopus 로고    scopus 로고
    • Faculty of arts. Manchester, University of Manchester. PhD
    • Edmonds B (1999). Syntactic measures of complexity. Faculty of arts. Manchester, University of Manchester. PhD
    • (1999) Syntactic Measures of Complexity
    • Edmonds, B.1
  • 11
    • 35348829104 scopus 로고    scopus 로고
    • Risk assessment for bridge maintenance projects: Neural networks versus regression techniques
    • DOI 10.1061/(ASCE)0887-3801(2007)21:6(402)
    • Elhag TMS, Wang YM (2007) Risk assessment for bridge maintenance projects: neural networks versus regression techniques. J Comput Civil Eng 21:402-409 (Pubitemid 47587957)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.6 , pp. 402-409
    • Elhag, T.M.S.1    Wang, Y.-M.2
  • 13
    • 11144299339 scopus 로고
    • A model-based method for organizing tasks in product development
    • Eppinger S, Whitney DE, Smith R, Gebala D (1994) A model-based method for organizing tasks in product development. Res Eng Des (6):1-13
    • (1994) Res Eng des , vol.6 , pp. 1-13
    • Eppinger, S.1    Whitney, D.E.2    Smith, R.3    Gebala, D.4
  • 14
    • 84865730611 scopus 로고
    • Set of measures of centrality based on betweenness
    • Freeman L (1977) Set of measures of centrality based on betweenness. Sociometry 40:35-41
    • (1977) Sociometry , vol.40 , pp. 35-41
    • Freeman, L.1
  • 15
    • 77955221294 scopus 로고    scopus 로고
    • Change propagation analysis in complex technical systems
    • doi:10.1115/1.3149847 (081001-1
    • Giffin M, De Weck O, Bounova G, Keller R, Eckert C, Clarkson J (2009) Change propagation analysis in complex technical systems. J Mech Des 131. doi:10.1115/1.3149847 (081001-1
    • (2009) J Mech des , vol.131
    • Giffin, M.1    De Weck, O.2    Bounova, G.3    Keller, R.4    Eckert, C.5    Clarkson, J.6
  • 19
    • 33644583894 scopus 로고    scopus 로고
    • A robust distance coefficient between distribution areas incorporating geographic distances
    • Hennig C, Hausdorf B (2006) A robust distance coefficient between distribution areas incorporating geographic distances. Syst Biol 55(1):170-175
    • (2006) Syst Biol , vol.55 , Issue.1 , pp. 170-175
    • Hennig, C.1    Hausdorf, B.2
  • 20
    • 75649141315 scopus 로고    scopus 로고
    • Hierarchical structuring of PPP risks using interpretative structural modeling
    • Iyer KC, Mohammed S (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. J Construct Eng Manag 136(2):151-159
    • (2010) J Construct Eng Manag , vol.136 , Issue.2 , pp. 151-159
    • Iyer, K.C.1    Mohammed, S.2
  • 22
    • 0017523323 scopus 로고
    • Probabilistic analysis of partitioning algorithms for the travelling salesman problem in the plane
    • Karp RM (1976) Probabilistic analysis of partitioning algorithms for the travelling salesman problem in the plane. Math Oper Res 2(3):209-224
    • (1976) Math Oper Res , vol.2 , Issue.3 , pp. 209-224
    • Karp, R.M.1
  • 23
    • 1642340984 scopus 로고    scopus 로고
    • Graph theoretic sequence clustering algorithms and their applications to genome comparison
    • Wu CH, Wang P, Wang JTL (eds) . World Scientific, Singapore
    • Kim S (2003) Graph theoretic sequence clustering algorithms and their applications to genome comparison. In: Wu CH, Wang P, Wang JTL (eds) Computational biology and genome informatics, vol 4. World Scientific, Singapore
    • (2003) Computational Biology and Genome Informatics , vol.4
    • Kim, S.1
  • 24
    • 55849140887 scopus 로고    scopus 로고
    • How to measure the effectiveness of risk management in engineering design projects ? Presentation of RMPASS: A new method for assessing risk management performance and the impact of knowledge management-including a few results
    • doi:10.1007/ s00163-008-0049-y
    • Kloss-Grote B, Moss M (2008) How to measure the effectiveness of risk management in engineering design projects ? Presentation of RMPASS: a new method for assessing risk management performance and the impact of knowledge management-including a few results. Res Eng Design 19:71-100. doi:10.1007/ s00163-008-0049-y
    • (2008) Res Eng Design , vol.19 , pp. 71-100
    • Kloss-Grote, B.1    Moss, M.2
  • 27
    • 80054909739 scopus 로고
    • La théorie du système général
    • Presses Universitaires de France
    • Le Moigne J (1990) La théorie du système général. Théorie de la modélisation, Presses Universitaires de France
    • (1990) Théorie de la Modélisation
    • Le Moigne, J.1
  • 28
    • 61349192168 scopus 로고    scopus 로고
    • Promoting risk communication in early design through linguistics analyses
    • Lough K, Van Wie M, Stone R, Tumer I (2009) Promoting risk communication in early design through linguistics analyses. Res Eng Des 20:29-40
    • (2009) Res Eng des , vol.20 , pp. 29-40
    • Lough, K.1    Van Wie, M.2    Stone, R.3    Tumer, I.4
  • 29
    • 0002975203 scopus 로고
    • On the generalised distance in statistics
    • Mahalanobis PC (1936) On the generalised distance in statistics. Proc Nat Inst Sci India 2(1):49-55
    • (1936) Proc Nat Inst Sci India , vol.2 , Issue.1 , pp. 49-55
    • Mahalanobis, P.C.1
  • 30
    • 80054943628 scopus 로고    scopus 로고
    • Methods for helping decision-making in projects
    • Cannes, France, June 2002
    • Marle F (2002) Methods for helping decision-making in projects. PMI Europe Conference, Cannes, France, June 2002
    • (2002) PMI Europe Conference
    • Marle, F.1
  • 31
  • 33
    • 84952503562 scopus 로고
    • Thirteen ways to look at the correlation coefficient
    • Rodgers JL, Nicewander WA (1988) Thirteen ways to look at the correlation coefficient. Am Stat 42:59-66
    • (1988) Am Stat , vol.42 , pp. 59-66
    • Rodgers, J.L.1    Nicewander, W.A.2
  • 34
    • 2542427258 scopus 로고
    • The analytic hierarchy process: Planning, priority setting
    • McGraw-Hill
    • Saaty T (1980) The analytic hierarchy process: planning, priority setting. Resource Allocation, McGraw-Hill
    • (1980) Resource Allocation
    • Saaty, T.1
  • 38
    • 38949167052 scopus 로고    scopus 로고
    • A structured approach to predicting and managing technical interactions in software development
    • Sosa M (2008) A structured approach to predicting and managing technical interactions in software development. Res Eng Des
    • (2008) Res Eng des
    • Sosa, M.1
  • 39
    • 0019597497 scopus 로고
    • Design structure system: A method for managing the design of complex systems
    • Steward D (1981) The Design structure matrix: a method for managing the design of complex systems. IEEE Trans Eng Manag 28(3):71-74 (Pubitemid 12430079)
    • (1981) IEEE Transactions on Engineering Management , vol.EM-28 , Issue.3 , pp. 71-74
    • Steward Donald, V.1
  • 40
    • 0032594785 scopus 로고    scopus 로고
    • A theory of complexity, periodicity and the design axioms
    • Suh N (1999) A theory of complexity, periodicity and the design axioms. Res Eng Design 11:116-133
    • (1999) Res Eng Design , vol.11 , pp. 116-133
    • Suh, N.1
  • 42
    • 80054892662 scopus 로고    scopus 로고
    • Understanding project complexity: Implications on project management
    • Vidal L, Marle F (2008) Understanding project complexity: implications on project management. Kyber Int J Syst Cybern Manag Sci
    • (2008) Kyber Int J Syst Cybern Manag Sci
    • Vidal, L.1    Marle, F.2
  • 44
    • 31744439382 scopus 로고    scopus 로고
    • Similarity coefficient methods applied to the cell formation problem: A taxonomy and review
    • DOI 10.1016/j.ijpe.2005.01.014, PII S0925527305000496
    • Yin Y, Yasuda K (2006) Similarity coefficient methods applied to the cell formation problem: A taxonomy and review. Int J Product Econ 101:329-352 (Pubitemid 43177618)
    • (2006) International Journal of Production Economics , vol.101 , Issue.2 , pp. 329-352
    • Yin, Y.1    Yasuda, K.2
  • 45
    • 16244405924 scopus 로고    scopus 로고
    • Project competence in product development
    • DOI 10.1007/s00163-004-0051-y
    • Zika-Viktorsson A, Ritzen S (2005) Project competence in product development. Res Eng Design 15:193-200. doi:10.1007/s00163- 004-0051-y (Pubitemid 40454292)
    • (2005) Research in Engineering Design , vol.15 , Issue.4 , pp. 193-200
    • Zika-Viktorsson, A.1    Ritzen, S.2
  • 46
    • 9544221663 scopus 로고    scopus 로고
    • The impact of aggregation level on forecasting performance
    • Zotteri G, Kalchschmidt M, Caniato F (2005) The impact of aggregation level on forecasting performance. Int J Product Econ 93-94:479-491
    • (2005) Int J Product Econ , vol.93-94 , pp. 479-491
    • Zotteri, G.1    Kalchschmidt, M.2    Caniato, F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.