-
2
-
-
84880314397
-
Distribution of materials in road earthmoving and paving: A mathematical programming approach
-
10.1061/(ASCE)CO.1943-7862.0000666 (Dec. 14, 2012)
-
de Lima, R., Júnior, E., de Athayde Prata, B., and Weissmann, J. (2012). "Distribution of Materials in Road Earthmoving and Paving: A Mathematical Programming Approach." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000666 (Dec. 14, 2012).
-
(2012)
J. Constr. Eng. Manage
-
-
De Lima, R.1
Júnior, E.2
De Athayde Prata, B.3
Weissmann, J.4
-
3
-
-
84945709831
-
Algorithm 97: Shortest path
-
June
-
Floyd, Robert W. (June 1962). "Algorithm 97: Shortest Path". Communications of the ACM 5 (6): 345.
-
(1962)
Communications of the ACM
, vol.5
, Issue.6
, pp. 345
-
-
Floyd, R.W.1
-
4
-
-
0031331802
-
AP2-Earth: A simulation based system for the estimating and planning of earth moving operations
-
Hajjar, D., and AbouRizk, S. (1997). "AP2-Earth: A Simulation Based System for the Estimating and Planning of Earth Moving Operations." Winter Simulation Conference, 1103-1110.
-
(1997)
Winter Simulation Conference
, pp. 1103-1110
-
-
Hajjar, D.1
AbouRizk, S.2
-
5
-
-
34848867519
-
Generic representation of 3D motion paths in dynamic animations of simulated construction processes
-
Kamat, V. R., and Martinez, J. C. "Generic representation of 3D motion paths in dynamic animations of simulated construction processes." Autom.Constr., 17(22), 188-200.
-
Autom.Constr.
, vol.17
, Issue.22
, pp. 188-200
-
-
Kamat, V.R.1
Martinez, J.C.2
-
6
-
-
84873383791
-
GIS method for haul road layout planning in large earthmoving projects: Framework and analysis
-
Kang, S., and Seo, J. (2013). "GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis." J.Constr.Eng.Manage., 139(2), 236-246.
-
(2013)
J.Constr.Eng.Manage
, vol.139
, Issue.2
, pp. 236-246
-
-
Kang, S.1
Seo, J.2
-
7
-
-
69949104465
-
3D-GIS based earthwork planning system for productivity improvement
-
Kang, S., Seo, J., and Baik, K. (2009) "3D-GIS Based Earthwork Planning System for Productivity Improvement. " Construction Research Congress 2009: pp. 151-160.
-
(2009)
Construction Research Congress 2009
, pp. 151-160
-
-
Kang, S.1
Seo, J.2
Baik, K.3
-
8
-
-
84859922849
-
Optimizing the schedule of dispatching earthmoving trucks through genetic algorithms and simulation
-
Lin, C., Hsie, M., Hsiao, W., Wu, H., and Cheng, T.(2012). "Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation." J.Perform.Constr.Facil., 203-211.
-
(2012)
J.Perform.Constr.Facil.
, pp. 203-211
-
-
Lin, C.1
Hsie, M.2
Hsiao, W.3
Wu, H.4
Cheng, T.5
-
9
-
-
0242633355
-
Object-oriented simulation model for earthmoving operations
-
Marzouk, M., and Moselhi, O. (2003). "Object-oriented Simulation Model for Earthmoving Operations." Journal of Construction Engineering & Management, 129(2), 173.
-
(2003)
Journal of Construction Engineering & Management
, vol.129
, Issue.2
, pp. 173
-
-
Marzouk, M.1
Moselhi, O.2
-
10
-
-
84894163442
-
Object-oriented simulation model for earthmoving operations
-
173
-
Marzouk, M., Moselhi, O., Moselhi, O., and Alshibani, A. (2009). "Object-oriented Simulation Model for Earthmoving Operations." Journal of Construction Engineering and Management-Asce, 129; 135(2; 10), 173; 948-954.
-
(2009)
Journal of Construction Engineering and Management-Asce
, vol.129-135
, Issue.2-10
, pp. 948-954
-
-
Marzouk, M.1
Moselhi, O.2
Moselhi, O.3
Alshibani, A.4
-
13
-
-
0028743714
-
A resource based simulation approach with application in earthmoving/strip mining
-
Shi, J., and AbouRizk, S. M. (1994). "A resource based simulation approach with application in earthmoving/strip mining." Winter Simulation Conference, 1124.
-
(1994)
Winter Simulation Conference
, pp. 1124
-
-
Shi, J.1
AbouRizk, S.M.2
-
14
-
-
0032030148
-
An automated modeling system for simulating earthmoving operations
-
Shi, J., and AbouRizk, S. S. (1998). "An Automated Modeling System for Simulating Earthmoving Operations." Computer-Aided Civil & Infrastructure Engineering, 13(2), 121.
-
(1998)
Computer-Aided Civil & Infrastructure Engineering
, vol.13
, Issue.2
, pp. 121
-
-
Shi, J.1
AbouRizk, S.S.2
-
15
-
-
84894205634
-
Earthmoving productivity estimation using linear regression techniques
-
133
-
Smith, S. D., Son, J., Mattila, K. G., and Myers, D. S. (2005). "Earthmoving productivity estimation using linear regression techniques." Journal of Construction Engineering and Management-Asce, 125; 131(3; 3), 133; 302-309.
-
(2005)
Journal of Construction Engineering and Management-Asce
, vol.125-131
, Issue.3
, pp. 302-309
-
-
Smith, S.D.1
Son, J.2
Mattila, K.G.3
Myers, D.S.4
-
16
-
-
14544286475
-
Determination of haul distance and direction in mass excavation
-
Son, J., Mattila, K. G., and Myers, D. S. (2005). "Determination of haul distance and direction in mass excavation." Journal of Construction Engineering and Management-Asce, 131(3), 302-309.
-
(2005)
Journal of Construction Engineering and Management-Asce
, vol.131
, Issue.3
, pp. 302-309
-
-
Son, J.1
Mattila, K.G.2
Myers, D.S.3
-
17
-
-
10444251125
-
A hybrid mechanism for optimizing construction simulation models
-
Tao-ming Cheng, Chung-wei Feng, and Yan-liang Chen. "A hybrid mechanism for optimizing construction simulation models." Autom.Constr., 14 85-98.
-
Autom.Constr.
, vol.14
, pp. 85-98
-
-
Cheng, T.-M.1
Feng, C.-W.2
Chen, Y.-L.3
|