-
2
-
-
14544280193
-
Analytic target cascading in simulation-based building design
-
DOI 10.1016/j.autcon.2004.11.004, PII S0926580504001414, 20th International Symposium on Automation and Robotics in Construction: The Future Site
-
R. Choudhary, A. Malkawi, and P.Y. Papalambros Analytic target cascading in simulation-based building design Autom. Constr. 14 2005 551 568 (Pubitemid 40305015)
-
(2005)
Automation in Construction
, vol.14
, Issue.4
, pp. 551-568
-
-
Choudhary, R.1
Malkawi, A.2
Papalambros, P.Y.3
-
3
-
-
79954595319
-
A decision-making system for construction site layout planning
-
X. Ning, K.C. Lam, and M.C. Lam A decision-making system for construction site layout planning Autom. Constr. 20 2011 459 473
-
(2011)
Autom. Constr.
, vol.20
, pp. 459-473
-
-
Ning, X.1
Lam, K.C.2
Lam, M.C.3
-
5
-
-
68749117490
-
EvoArch: An evolutionary algorithm for architectural layout design
-
S.S.Y. Wong, and K.C.C. Chan EvoArch: an evolutionary algorithm for architectural layout design Comput. Aided Des. 41 2009 649 667
-
(2009)
Comput. Aided Des.
, vol.41
, pp. 649-667
-
-
Wong, S.S.Y.1
Chan, K.C.C.2
-
6
-
-
0019608479
-
Optimal space planning in practice
-
R.S. Liggett, and W.J. Mitchell Optimal space planning in practice Comput. Aided Des. 13 5 1981 277 288
-
(1981)
Comput. Aided Des.
, vol.13
, Issue.5
, pp. 277-288
-
-
Liggett, R.S.1
Mitchell, W.J.2
-
7
-
-
0002384937
-
Assignment problems and the location of economic activities
-
T.C. Koopmans, and M. Beckman Assignment problems and the location of economic activities Econometrica 25 1 1975 53 76
-
(1975)
Econometrica
, vol.25
, Issue.1
, pp. 53-76
-
-
Koopmans, T.C.1
Beckman, M.2
-
8
-
-
33744513353
-
Architectural layout optimization using annealed neural network
-
I.C. Yeh Architectural layout optimization using annealed neural network Autom. Constr. 15 2006 531 539
-
(2006)
Autom. Constr.
, vol.15
, pp. 531-539
-
-
Yeh, I.C.1
-
9
-
-
0021388604
-
Quadratic assignment problems
-
R.E. Burkard Quadratic assignment problems Eur. J. Oper. Res. 15 1984 283 289
-
(1984)
Eur. J. Oper. Res.
, vol.15
, pp. 283-289
-
-
Burkard, R.E.1
-
10
-
-
85024732471
-
A hospital facility layout problem finally solved
-
6
-
P.M. Hahn, and J. Jrarup A hospital facility layout problem finally solved J. Intell. Manuf. 15 55/6 2000 1 11
-
(2000)
J. Intell. Manuf.
, vol.15
, Issue.55
, pp. 1-11
-
-
Hahn, P.M.1
Jrarup, J.2
-
11
-
-
0001388076
-
CORELAP-computerized relationship layout planning
-
R. Lee, and J.M. Moore CORELAP-computerized relationship layout planning J. Ind. Eng. Comput. 18 1967 195 200
-
(1967)
J. Ind. Eng. Comput.
, vol.18
, pp. 195-200
-
-
Lee, R.1
Moore, J.M.2
-
13
-
-
0016993551
-
An applied model for the facilities design problem
-
J.A. Tompkins, and J.R. Reed An applied model for the facilities design problem Int. J. Prod. Res. 14 1976 583 595
-
(1976)
Int. J. Prod. Res.
, vol.14
, pp. 583-595
-
-
Tompkins, J.A.1
Reed, J.R.2
-
14
-
-
0022787989
-
SHAPE: A construction algorithm for area placement evaluation
-
M.M.D. Hassan, G.L. Hogg, and D.R. Smith SHAPE: a construction algorithm for area placement evaluation Int. J. Prod. Res. 24 5 1986 1283 1295
-
(1986)
Int. J. Prod. Res.
, vol.24
, Issue.5
, pp. 1283-1295
-
-
Hassan, M.M.D.1
Hogg, G.L.2
Smith, D.R.3
-
15
-
-
0000970291
-
A heuristic algorithm and simulation approach to relative allocation of facilities
-
G.C. Armour, and E.S. Buffa A heuristic algorithm and simulation approach to relative allocation of facilities Manag. Sci. 9 2 1963 294 300
-
(1963)
Manag. Sci.
, vol.9
, Issue.2
, pp. 294-300
-
-
Armour, G.C.1
Buffa, E.S.2
-
16
-
-
0015614063
-
Facilities relative allocation technique (FRAT)
-
T.M. Khalil Facilities relative allocation technique (FRAT) Int. J. Prod. Res. 11 2 1973 183 194
-
(1973)
Int. J. Prod. Res.
, vol.11
, Issue.2
, pp. 183-194
-
-
Khalil, T.M.1
-
17
-
-
0023386457
-
Heuristic procedure for the layout of a large number of facilities
-
Z. Drezner A heuristic procedure for the layout of a large number of facilities Int. J. Manag. Sci. 33 7 1987 907 915 (Pubitemid 17636222)
-
(1987)
Management Science
, vol.33
, Issue.7
, pp. 907-915
-
-
Drezner Zvi1
-
18
-
-
33749554604
-
A survey for the quadratic assignment problem
-
DOI 10.1016/j.ejor.2005.09.032, PII S0377221705008337
-
E.M. Loiola, N.M.M.D. Abreu, P.O. Boaventura-Netto, P. Hahn, and T. Querido A survey for the quadratic assignment problem Eur. J. Oper. Res. 176 2007 657 690 (Pubitemid 44537635)
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.2
, pp. 657-690
-
-
Loiola, E.M.1
De Abreu, N.M.M.2
Boaventura-Netto, P.O.3
Hahn, P.4
Querido, T.5
-
19
-
-
4744374111
-
An ant algorithm for the single row layout problem in flexible manufacturing systems
-
M. Solimanpur, P. Vrat, and R. Shankar An ant algorithm for the single row layout problem in flexible manufacturing systems Comput. Oper. Res. 32 3 2005 583 598
-
(2005)
Comput. Oper. Res.
, vol.32
, Issue.3
, pp. 583-598
-
-
Solimanpur, M.1
Vrat, P.2
Shankar, R.3
-
20
-
-
41749100125
-
The strategies of tabu search technique for facility layout optimization
-
L.Y. Liang, and W.C. Chao The strategies of tabu search technique for facility layout optimization Autom. Constr. 17 2008 657 669
-
(2008)
Autom. Constr.
, vol.17
, pp. 657-669
-
-
Liang, L.Y.1
Chao, W.C.2
-
21
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
DOI 10.1016/S0926-5805(01)00044-9, PII S0926580501000449
-
S.O. Cheung, T.K. Tong, and C.M. Tam Site pre-cast yard layout arrangement through genetic algorithms Autom. Constr. 11 2002 35 46 (Pubitemid 32833464)
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.-O.1
Tong, T.K.-L.2
Tam, C.-M.3
-
22
-
-
33847198334
-
Optimization of floor-level construction material layout using Genetic Algorithms
-
H. Jang, S. Lee, and S. Choi Optimization of floor-level construction material layout using Genetic Algorithms Autom. Constr. 16 2007 531 545
-
(2007)
Autom. Constr.
, vol.16
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
24
-
-
63549137922
-
GA-based decision support system for housing condition assessment and refurbishment strategies
-
H.K. Juan, J.H. Kim, K. Roper, and D. Castro-Lacouture GA-based decision support system for housing condition assessment and refurbishment strategies Autom. Constr. 18 2009 394 401
-
(2009)
Autom. Constr.
, vol.18
, pp. 394-401
-
-
Juan, H.K.1
Kim, J.H.2
Roper, K.3
Castro-Lacouture, D.4
-
25
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
H. Li, and P.E.D. Love Genetic search for solving construction site-level unequal-area facility layout problems Autom. Constr. 9 2000 217 226 (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
26
-
-
0000904077
-
Messy genetic algorithms: Motivation, analysis, and first results
-
D.E. Goldberg, B. Korb, and K. Deb Messy genetic algorithms: motivation, analysis, and first results Compl. Syst. 3 5 1989 493 530
-
(1989)
Compl. Syst.
, vol.3
, Issue.5
, pp. 493-530
-
-
Goldberg, D.E.1
Korb, B.2
Deb, K.3
-
27
-
-
0001907722
-
Rapid, accurate optimization of difficult problems using fast messy genetic algorithms
-
D.E. Goldberg, K. Deb, H. Kaegupta, and G. Harik Rapid, accurate optimization of difficult problems using fast messy genetic algorithms Proceedings of the Fifth International Conference on Genetic Algorithms 1993 56 64
-
(1993)
Proceedings of the Fifth International Conference on Genetic Algorithms
, pp. 56-64
-
-
Goldberg, D.E.1
Deb, K.2
Kaegupta, H.3
Harik, G.4
-
28
-
-
0033185650
-
Scheduling of water distribution system rehabilitation using structured messy genetic algorithms
-
D. Halhal, G.A. Walters, D.A. Savic, and D. Ouazar Scheduling of water distribution system rehabilitation using structured messy genetic algorithms Evol. Comput. 7 3 1999 311 329
-
(1999)
Evol. Comput.
, vol.7
, Issue.3
, pp. 311-329
-
-
Halhal, D.1
Walters, G.A.2
Savic, D.A.3
Ouazar, D.4
-
29
-
-
29144449379
-
Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
-
C.W. Feng, and H.T. Wu Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks Autom. Constr. 15 2 2006 186 199
-
(2006)
Autom. Constr.
, vol.15
, Issue.2
, pp. 186-199
-
-
Feng, C.W.1
Wu, H.T.2
-
30
-
-
0001682768
-
Learning of a fuzzy control rule base using messy genetic algorithms
-
F. Herrera, Physica-Verlag Heidelberg
-
F. Hoffmann, and G. Pfister Learning of a fuzzy control rule base using messy genetic algorithms F. Herrera, Genetic Algorithms and Soft Computing 1996 Physica-Verlag Heidelberg 279 305
-
(1996)
Genetic Algorithms and Soft Computing
, pp. 279-305
-
-
Hoffmann, F.1
Pfister, G.2
-
31
-
-
0027898227
-
A messy genetic algorithms for clustering
-
C.H. Dagli, L.I. Burke, B.R. Feranadez, J. Ghosh, ASME Press New York
-
C.K. Mohan A messy genetic algorithms for clustering C.H. Dagli, L.I. Burke, B.R. Feranadez, J. Ghosh, Intelligent Engineering Systems Through Artificial Neural Networks 1993 ASME Press New York 831 836
-
(1993)
Intelligent Engineering Systems Through Artificial Neural Networks
, pp. 831-836
-
-
Mohan, C.K.1
-
32
-
-
0000732964
-
Extending the representation of classifier conditions Part Ι: from binary to messy coding
-
P.L. Lanzi Extending the representation of classifier conditions Part Ι: From binary to messy coding Proc. Genet. Evol. Comput. Conf. 1 1999 337 344
-
(1999)
Proc. Genet. Evol. Comput. Conf.
, vol.1
, pp. 337-344
-
-
Lanzi, P.L.1
-
33
-
-
0000732964
-
Extending the representation of classifier conditions Part Π: from messy coding to S-expressions
-
P.L. Lanzi, and A. Perrucci Extending the representation of classifier conditions Part Π: From messy coding to S-expressions Proc. Genet. Evol. Comput. Conf. 1 1999 345 352
-
(1999)
Proc. Genet. Evol. Comput. Conf.
, vol.1
, pp. 345-352
-
-
Lanzi, P.L.1
Perrucci, A.2
-
35
-
-
77955715122
-
Project success prediction using an evolutionary support vector machine inference model
-
M.Y. Cheng, Y.W. Wu, and C.F. Wu Project success prediction using an evolutionary support vector machine inference model Autom. Constr. 19 3 2010 619 629
-
(2010)
Autom. Constr.
, vol.19
, Issue.3
, pp. 619-629
-
-
Cheng, M.Y.1
Wu, Y.W.2
Wu, C.F.3
-
36
-
-
33746673153
-
Herecast:An open infrastructure for location-based services using WiFi
-
DOI 10.1109/WIMOB.2005.1512945, 1512945, 2005 IEEE International Conference on Wireless and Mobile Computing, Networking and Communications, WiMob'2005
-
M. Paciga, and H. Lutfiyya Herecast: an open infrastructure for locationbased services using WiFi Wireless and mobile computing, networking and communications (WiMobapos) 4 2005 IEEE IC 21 28 (Pubitemid 44159772)
-
(2005)
2005 IEEE International Conference on Wireless and Mobile Computing, Networking and Communications, WiMob'2005
, vol.4
, pp. 21-28
-
-
Paciga, M.1
Lutfiyya, H.2
-
37
-
-
0026483978
-
The active badge location system
-
R. Want, A. Hopper, V. Falcao, and J. Gibbons The active badge location system ACM Trans. Inf. Syst. 40 1 1992 91 102
-
(1992)
ACM Trans. Inf. Syst.
, vol.40
, Issue.1
, pp. 91-102
-
-
Want, R.1
Hopper, A.2
Falcao, V.3
Gibbons, J.4
-
39
-
-
32144435746
-
PAWS: Personal Action Wireless Sensor
-
DOI 10.1007/s00779-005-0012-0
-
T. Dowad PAWS: personal action wireless sensor Pers. Ubiquit. Comput. 10 2-3 2006 173 176 (Pubitemid 43204682)
-
(2006)
Personal and Ubiquitous Computing
, vol.10
, Issue.2-3
, pp. 173-176
-
-
Dowad, T.1
-
40
-
-
79960182786
-
Performance-based evaluation of RFID-based indoor location sensing solutions for the built environment
-
N. Li, and B. Becerik-Gerber Performance-based evaluation of RFID-based indoor location sensing solutions for the built environment Adv. Eng. Inform. 25 2011 535 546
-
(2011)
Adv. Eng. Inform.
, vol.25
, pp. 535-546
-
-
Li, N.1
Becerik-Gerber, B.2
-
41
-
-
70349469685
-
Improving location awareness in indoor spaces using RFID technology
-
R. Tesoriero, R. Tebar, J.A. Gallud, M.D. Lozano, and V.M.R. Penichet Improving location awareness in indoor spaces using RFID technology Expert Syst. Appl. 37 2010 894 898
-
(2010)
Expert Syst. Appl.
, vol.37
, pp. 894-898
-
-
Tesoriero, R.1
Tebar, R.2
Gallud, J.A.3
Lozano, M.D.4
Penichet, V.M.R.5
-
42
-
-
77950858180
-
Delivery of pedestrian real-time location and routing information to mobile architectural guide
-
G. Saeed, A. Brown, M. Knight, and M. Winchester Delivery of pedestrian real-time location and routing information to mobile architectural guide Autom. Constr. 19 2010 502 517
-
(2010)
Autom. Constr.
, vol.19
, pp. 502-517
-
-
Saeed, G.1
Brown, A.2
Knight, M.3
Winchester, M.4
-
43
-
-
29144515805
-
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
-
DOI 10.1016/j.autcon.2005.03.001, PII S0926580505000567
-
J. Song, C.T. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Autom. Constr. 15 2006 166 177 (Pubitemid 41817145)
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 166-177
-
-
Song, J.1
Haas, C.T.2
Caldas, C.3
Ergen, E.4
Akinci, B.5
-
44
-
-
5544326540
-
LANDMARC: Indoor location sensing using active RFID
-
M.N. Lionel, Y.H. Liu, Y.C. Lau, and A.P. Patil LANDMARC: indoor location sensing using active RFID Wirel. Netw 10 6 2004 701 710
-
(2004)
Wirel. Netw
, vol.10
, Issue.6
, pp. 701-710
-
-
Lionel, M.N.1
Liu, Y.H.2
Lau, Y.C.3
Patil, A.P.4
-
46
-
-
0011513664
-
Radio-frequency identification applications in construction industry
-
E.J. Jaselskis, M.R. Anderson, and C.T. Jahren Radio-frequency identification applications in construction industry J. Constr. Eng. Manag. 121 2 1995 189 196
-
(1995)
J. Constr. Eng. Manag.
, vol.121
, Issue.2
, pp. 189-196
-
-
Jaselskis, E.J.1
Anderson, M.R.2
Jahren, C.T.3
-
47
-
-
67651043223
-
Embedded system for construction asset tracking combining radio and ultrasound signals
-
W.S. Jang, and M.J. Skibniewski Embedded system for construction asset tracking combining radio and ultrasound signals J. Comput. Civ. Eng. 23 4 2009 221 229
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.4
, pp. 221-229
-
-
Jang, W.S.1
Skibniewski, M.J.2
-
48
-
-
33644672678
-
The application of active radio frequency identification technology for tool tracking on construction job sites
-
DOI 10.1016/j.autcon.2005.06.004, PII S0926580505000695
-
P.M. Goodrum, M.A. McLaren, and A. Durfee The application of active radio frequency identification technology for tool tracking on construction job sites Autom. Constr. 15 3 2006 292 302 (Pubitemid 43332713)
-
(2006)
Automation in Construction
, vol.15
, Issue.3
, pp. 292-302
-
-
Goodrum, P.M.1
McLaren, M.A.2
Durfee, A.3
-
49
-
-
65249088014
-
Model for the 3D location of buried assets based on RFID technology
-
K. Dziadak, B. Kumar, and J. Sommerville Model for the 3D location of buried assets based on RFID technology J. Comput. Civ. Eng. 23 3 2009 148 159
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.3
, pp. 148-159
-
-
Dziadak, K.1
Kumar, B.2
Sommerville, J.3
-
50
-
-
35348931619
-
Radio-Frequency Identification (RFID) applications: A brief introduction
-
DOI 10.1016/j.aei.2006.09.001, PII S1474034606000498
-
K. Domdouzis, B. Kumar, and C. Anumba Radio-Frequency Identification (RFID) applications: a brief introduction Adv. Eng. Inform. 21 4 2007 350 355 (Pubitemid 47610643)
-
(2007)
Advanced Engineering Informatics
, vol.21
, Issue.4
, pp. 350-355
-
-
Domdouzis, K.1
Kumar, B.2
Anumba, C.3
-
51
-
-
49349095031
-
Combination of radio frequency identification (RFID) and field verification tests of interior decorating materials
-
C.T. Tzeng, T.C. Chiang, C.M. Chiang, and C.M. Lai Combination of radio frequency identification (RFID) and field verification tests of interior decorating materials Autom. Constr. 18 2008 16 23
-
(2008)
Autom. Constr.
, vol.18
, pp. 16-23
-
-
Tzeng, C.T.1
Chiang, T.C.2
Chiang, C.M.3
Lai, C.M.4
-
52
-
-
38649110133
-
Enhancing construction quality inspection and management using RFID technology
-
L.C. Wang Enhancing construction quality inspection and management using RFID technology Autom. Constr. 17 2008 467 479
-
(2008)
Autom. Constr.
, vol.17
, pp. 467-479
-
-
Wang, L.C.1
-
53
-
-
39349114541
-
RFID+4D CAD for progress management of structural steel works in high-rise buildings
-
DOI 10.1061/(ASCE)0887-3801(2008)22:2(74)
-
S. Chin, S. Yoon, C. Choi, and C. Cho RFID + 4D CAD for progress management of structural steel works in high-rise buildings J. Comput. Civ. Eng. 22 2 2008 74 89 (Pubitemid 351264006)
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.2
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
54
-
-
67349159070
-
Developing a precast production management system using RFID technology
-
S.Y.L. Yin, H.P. Tserng, J.C. Wang, and S.C. Tsai Developing a precast production management system using RFID technology Autom. Constr. 18 2009 677 691
-
(2009)
Autom. Constr.
, vol.18
, pp. 677-691
-
-
Yin, S.Y.L.1
Tserng, H.P.2
Wang, J.C.3
Tsai, S.C.4
-
55
-
-
84878357436
-
Deployment strategies and performance evaluation of a virtual-tag-enabled indoor location sensing approach
-
N. Li, S. Li, B. Becerik-Gerber, and G. Calis Deployment strategies and performance evaluation of a virtual-tag-enabled indoor location sensing approach J. Comput. Civ. Eng. 26 5 2012 574 583
-
(2012)
J. Comput. Civ. Eng.
, vol.26
, Issue.5
, pp. 574-583
-
-
Li, N.1
Li, S.2
Becerik-Gerber, B.3
Calis, G.4
-
56
-
-
0032123751
-
Space layout planning using an evolutionary approach
-
PII S0954181097000374
-
J.R. Jo, and J.S. Gero Space layout planning using an evolutionary approach Artif. Intell. Eng. 12 3 1998 149 162 (Pubitemid 128391775)
-
(1998)
Artificial Intelligence in Engineering
, vol.12
, Issue.3
, pp. 149-162
-
-
Jo, J.H.1
Gero, J.S.2
-
58
-
-
0002555793
-
Don't worry, be messy
-
La Jolla, CA
-
D.E. Goldberg, K. Deb, and B. Korb Don't worry, be messy Proceedings of the Fourth International Conference on Genetic Algorithms 1991 24 30 La Jolla, CA
-
(1991)
Proceedings of the Fourth International Conference on Genetic Algorithms
, pp. 24-30
-
-
Goldberg, D.E.1
Deb, K.2
Korb, B.3
|