메뉴 건너뛰기




Volumn 17, Issue , 2014, Pages 105-116

Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies

Author keywords

Construction project management; Fuzzy AHP and TOPSIS; Fuzzy modeling; Risk management

Indexed keywords

CONSTRUCTION PROJECT MANAGEMENT; FUZZY AHP; FUZZY LINGUISTIC VARIABLE; FUZZY MODELING; GROUP DECISION MAKING PROBLEMS; QUALITATIVE ATTRIBUTES; QUANTITATIVE MEASURES; UNCERTAINTY AND RISKS;

EID: 84893226274     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2014.01.003     Document Type: Article
Times cited : (460)

References (44)
  • 3
    • 0035135304 scopus 로고    scopus 로고
    • Risk assessment for construction joint ventures in China
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(76)
    • L.Y. Shen, G.W.C. Wu, and C.S.K. Ng Risk assessment for construction joint ventures in China Journal of Construction Engineering and Management 127 1 2001 76 81 (Pubitemid 32158962)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 76-81
    • Shen, L.Y.1    Wu, G.W.C.2    Ng, C.S.K.3
  • 4
    • 2942611032 scopus 로고    scopus 로고
    • Identifying elements of poor construction safety management in China
    • DOI 10.1016/j.ssci.2003.09.001, PII S0925753503000602
    • C.M. Tam, S.X. Zeng, and Z.M. Deng Identifying elements of poor construction safety management in China Safety Science 42 7 2004 569 586 (Pubitemid 38748943)
    • (2004) Safety Science , vol.42 , Issue.7 , pp. 569-586
    • Tam, C.M.1    Zeng, S.X.2    Deng, Z.M.3
  • 6
    • 0035313962 scopus 로고    scopus 로고
    • The controlling influences on effective risk identification and assessment for construction design management
    • DOI 10.1016/S0263-7863(99)00070-8, PII S0263786399000708
    • R.J. Chapman The controlling influences on effective risk identification and assessment for construction design management International Journal of Project Management 19 3 2001 147 160 (Pubitemid 32219478)
    • (2001) International Journal of Project Management , vol.19 , Issue.3 , pp. 147-160
    • Chapman, R.J.1
  • 9
    • 43849092152 scopus 로고    scopus 로고
    • Risk assessment and allocation in the UAE construction industry
    • DOI 10.1016/j.ijproman.2007.07.004, PII S026378630700110X
    • S.M. El-Sayegh Risk assessment and allocation in the UAE construction industry International Journal of Project Management 26 4 2008 431 438 (Pubitemid 351696563)
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 431-438
    • El-Sayegh, S.M.1
  • 10
    • 27944455550 scopus 로고    scopus 로고
    • Understanding internally generated risks in projects
    • DOI 10.1016/j.ijproman.2005.05.006, PII S0263786305000591
    • R. Barber Understanding internally generated risks in projects International Journal of Project Management 23 8 2005 584 590 (Pubitemid 41671383)
    • (2005) International Journal of Project Management , vol.23 , Issue.8 , pp. 584-590
    • Barber, R.B.1
  • 11
    • 32844459217 scopus 로고    scopus 로고
    • The importance and allocation of risks in Indonesian construction projects
    • ANDI DOI 10.1080/01446190500310338, PII L027218652071715
    • ANDI The importance and allocation of risks in Indonesian construction projects Construction Management and Economics 24 12 2006 69 80 (Pubitemid 43250414)
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 69-80
  • 12
    • 2342420461 scopus 로고    scopus 로고
    • Risk management framework for construction projects in developing countries
    • DOI 10.1080/0144619032000124689
    • S.Q. Wang, M.F. Dulaimi, and M.Y. Aguria Risk management framework for construction projects in developing countries Construction Management and Economics 22 2004 237 252 (Pubitemid 38562529)
    • (2004) Construction Management and Economics , vol.22 , Issue.3 , pp. 237-252
    • Wang, S.Q.1    Dulaimi, M.F.2    Aguria, M.Y.3
  • 15
    • 0035426616 scopus 로고    scopus 로고
    • Risk and its management in the Kuwaiti construction industry: A contractors' perspective
    • DOI 10.1016/S0263-7863(00)00014-4, PII S0263786300000144
    • N. Kartam, and S. Kartam Risk and its management in the Kuwaiti construction industry: a contractors' perspective International Journal of Project Management 19 6 2001 325 335 (Pubitemid 32646672)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 325-335
    • Kartam, N.A.1    Kartam, S.A.2
  • 16
    • 13944278087 scopus 로고    scopus 로고
    • Risks in Chinese construction market - Contractors' perspective
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(853)
    • D. Fang, M. Li, P.S. Fong, and L. Shen Risks in Chinese construction market - contractors' perspective Journal of Construction Engineering and Management 130 6 2004 853 861 (Pubitemid 40265318)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 853-861
    • Fang, D.1    Li, M.2    Fong, P.S.-W.3    Shen, L.4
  • 17
    • 33645542004 scopus 로고    scopus 로고
    • Risks faced by Singapore firms when undertaking construction projects in India
    • F. Ling, and L. Hoi Risks faced by Singapore firms when undertaking construction projects in India International Journal of Project Management 24 2006 261 270
    • (2006) International Journal of Project Management , vol.24 , pp. 261-270
    • Ling, F.1    Hoi, L.2
  • 19
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • J.H.M. Tah, and V. Carr A proposal for construction project risk assessment using fuzzy logic Construction Management and Economics 18 4 2000 491 500
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 20
    • 0035399734 scopus 로고    scopus 로고
    • Use of fuzzy numbers in project risk (criticality) assessment
    • DOI 10.1016/S0263-7863(00)00022-3, PII S0263786300000223
    • D. Kuchta Use of fuzzy numbers in project risk (criticality) assessment International Journal of Project Management 19 5 2001 305 310 (Pubitemid 32548509)
    • (2001) International Journal of Project Management , vol.19 , Issue.5 , pp. 305-310
    • Kuchta, D.1
  • 21
    • 34447565099 scopus 로고    scopus 로고
    • Application of a fuzzy based decision making methodology to construction project risk assessment
    • DOI 10.1016/j.ijproman.2007.02.006, PII S026378630700049X
    • J. Zeng, M. An, and N.J. Smith Application of a fuzzy based decision making methodology to construction project risk assessment International Journal of Project Management 25 6 2007 589 600 (Pubitemid 47079918)
    • (2007) International Journal of Project Management , vol.25 , Issue.6 , pp. 589-600
    • Zeng, J.1    An, M.2    Smith, N.J.3
  • 22
    • 84893235456 scopus 로고    scopus 로고
    • Risk assessment of construction projects using network based adaptive fuzzy system
    • M. Ebrat, and R. Ghodsi Risk assessment of construction projects using network based adaptive fuzzy system International Journal of Academic Research 3 1 2011 411 417
    • (2011) International Journal of Academic Research , vol.3 , Issue.1 , pp. 411-417
    • Ebrat, M.1    Ghodsi, R.2
  • 24
    • 84982735375 scopus 로고    scopus 로고
    • Strategic evaluation and solution of R&D projects
    • N. Danila Strategic evaluation and solution of R&D projects R&D Management 19 1999 47 62
    • (1999) R&D Management , vol.19 , pp. 47-62
    • Danila, N.1
  • 25
    • 78049530035 scopus 로고    scopus 로고
    • A combined methodology for supplier selection and performance evaluation
    • M. Zeydan, C. Colpan, and C. Cobanoglu A combined methodology for supplier selection and performance evaluation Expert Systems with Applications 38 3 2011 2741 2751
    • (2011) Expert Systems with Applications , vol.38 , Issue.3 , pp. 2741-2751
    • Zeydan, M.1    Colpan, C.2    Cobanoglu, C.3
  • 26
    • 53949104729 scopus 로고    scopus 로고
    • Fuzzy hierarchical TOPSIS for supplier selection
    • J.W. Wang, C.H. Cheng, and H.K. Cheng Fuzzy hierarchical TOPSIS for supplier selection Applied Soft Computing 9 1 2009 377 386
    • (2009) Applied Soft Computing , vol.9 , Issue.1 , pp. 377-386
    • Wang, J.W.1    Cheng, C.H.2    Cheng, H.K.3
  • 27
    • 58649093521 scopus 로고    scopus 로고
    • A fuzzy AHP approach to personnel selection problem
    • Z. Gungor, G. SerhadlIoglu, and S.E. Kesen A fuzzy AHP approach to personnel selection problem Applied Soft Computing 9 2 2009 641 646
    • (2009) Applied Soft Computing , vol.9 , Issue.2 , pp. 641-646
    • Gungor, Z.1    Serhadlioglu, G.2    Kesen, S.E.3
  • 28
    • 70649102118 scopus 로고    scopus 로고
    • Fuzzy AHP to determine the relative weights of evaluation criteria and fuzzy TOPSIS to rank the alternatives
    • F. Torfi, R.Z. Farahani, and S. Rezapour Fuzzy AHP to determine the relative weights of evaluation criteria and fuzzy TOPSIS to rank the alternatives Applied Soft Computing 10 2010 20 528
    • (2010) Applied Soft Computing , vol.10 , pp. 20-528
    • Torfi, F.1    Farahani, R.Z.2    Rezapour, S.3
  • 30
    • 69249244986 scopus 로고    scopus 로고
    • A new decision support system for performance measurement using combined fuzzy TOPSIS/DEA approach
    • 10.1080/00207540802662870
    • M. Zeydan, and C. Colpan A new decision support system for performance measurement using combined fuzzy TOPSIS/DEA approach International Journal of Production Research 2009 10.1080/00207540802662870
    • (2009) International Journal of Production Research
    • Zeydan, M.1    Colpan, C.2
  • 32
    • 0035426616 scopus 로고    scopus 로고
    • Risk and its management in the Kuwaiti construction industry: A contractors' perspective
    • DOI 10.1016/S0263-7863(00)00014-4, PII S0263786300000144
    • N. Kartam, and S. Kartam Risk and its management in the Kuwaiti construction industry: a contractors' perspective International Journal of Project Management 19 2001 325 335 (Pubitemid 32646672)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 325-335
    • Kartam, N.A.1    Kartam, S.A.2
  • 33
    • 27944455550 scopus 로고    scopus 로고
    • Understanding internally generated risks in projects
    • DOI 10.1016/j.ijproman.2005.05.006, PII S0263786305000591
    • R. Barber Understanding internally generated risks in projects International Journal of Project Management 23 2005 584 590 (Pubitemid 41671383)
    • (2005) International Journal of Project Management , vol.23 , Issue.8 , pp. 584-590
    • Barber, R.B.1
  • 36
    • 33750939029 scopus 로고    scopus 로고
    • Fuzzy inference to risk assessment on nuclear engineering systems
    • DOI 10.1016/j.asoc.2005.06.002, PII S1568494605000323
    • A.C.F. Guimaraes, and C.M.F. Lapa Fuzzy inference to risk assessment on nuclear engineering systems Applied Soft Computing 7 1 2007 17 28 (Pubitemid 44739425)
    • (2007) Applied Soft Computing Journal , vol.7 , Issue.1 , pp. 17-28
    • Guimaraes, A.C.F.1    Lapa, C.M.F.2
  • 37
    • 81855176110 scopus 로고    scopus 로고
    • Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
    • A.C. Kutlu, and M. Ekmekcioglu Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP Expert Systems with Applications 39 1 2012 61 67
    • (2012) Expert Systems with Applications , vol.39 , Issue.1 , pp. 61-67
    • Kutlu, A.C.1    Ekmekcioglu, M.2
  • 39
    • 31744441061 scopus 로고    scopus 로고
    • Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches
    • DOI 10.1080/00207540500161746
    • M. Yurdakul, and Y.T. Ic Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches International Journal of production Research 43 21 2005 4609 4641 (Pubitemid 43175225)
    • (2005) International Journal of Production Research , vol.43 , Issue.21 , pp. 4609-4641
    • Yurdakul, M.1    Ic, Y.T.2
  • 40
    • 79957918314 scopus 로고    scopus 로고
    • Outlier analysis for plastic card fraud detection a hybridized and multi-objective approach
    • A. Elías, A. Ochoa-Zezzatti, A. Padilla, and J. Ponce Outlier analysis for plastic card fraud detection a hybridized and multi-objective approach HAIS 2 2011 1 9
    • (2011) HAIS , vol.2 , pp. 1-9
    • Elías, A.1    Ochoa-Zezzatti, A.2    Padilla, A.3    Ponce, J.4
  • 43
    • 0016458950 scopus 로고
    • The concept of a linguistic variable and its applications to approximate reasoning
    • L.A. Zadeh The concept of a linguistic variable and its applications to approximate reasoning Information Science 8 3 1975 199 249
    • (1975) Information Science , vol.8 , Issue.3 , pp. 199-249
    • Zadeh, L.A.1
  • 44
    • 79957972740 scopus 로고    scopus 로고
    • Estimating the quality of process yield by fuzzy sets and systems
    • O. Taylan Estimating the quality of process yield by fuzzy sets and systems Expert Systems with Applications 38 10 2011 12599 12607
    • (2011) Expert Systems with Applications , vol.38 , Issue.10 , pp. 12599-12607
    • Taylan, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.