메뉴 건너뛰기




Volumn 4, Issue 4, 2013, Pages 797-808

Optimisation of the construction and demolition waste management facilities location in Cantabria (Spain) under economical and environmental criteria

Author keywords

Construction and demolition waste; Recycling network; Total costs minimization; Transport distance minimization; Waste management

Indexed keywords

CONSTRUCTION AND DEMOLITION WASTE; MATHEMATICAL PROGRAM; OPTIMIZATION MODELING; RECYCLING FACILITIES; RECYCLING NETWORKS; REUSE AND RECYCLING; TRANSPORT DISTANCES; TRANSPORTATION DISTANCE;

EID: 84892888465     PISSN: 18772641     EISSN: 1877265X     Source Type: Journal    
DOI: 10.1007/s12649-013-9196-0     Document Type: Article
Times cited : (28)

References (34)
  • 1
    • 84892852560 scopus 로고    scopus 로고
    • European commission: Bio intelligence Service (2010). Service contract on management of construction and demolition waste. Draft Final Report Task 2, Accessed Sept 2011
    • European commission: Bio intelligence Service (2010). Service contract on management of construction and demolition waste. Draft Final Report Task 2. http://ec.europa.eu/environment/ waste/prevention/pdf/WPG-final-report.pdf. Accessed Sept 2011
  • 2
    • 84892867352 scopus 로고    scopus 로고
    • EC Directive (2008). European Commission: Directive 2008/98/ EC of the European Parliament and of the Council of 19 November 2008 on waste
    • EC Directive (2008). European Commission: Directive 2008/98/ EC of the European Parliament and of the Council of 19 November 2008 on waste
  • 3
    • 84863098447 scopus 로고    scopus 로고
    • Life cycle assessment of construction and demolition waste management systems: A Spanish case study
    • Mercante, I.T., Bovea, M.D., Ibañez-Forés, V., Arena, A.P.: Life cycle assessment of construction and demolition waste management systems: a Spanish case study. Int. J. LCA. 17, 232-241 (2012)
    • (2012) Int. J. LCA. , vol.17 , pp. 232-241
    • Mercante, I.T.1    Bovea, M.D.2    Ibañez-Forés, V.3    Arena, A.P.4
  • 4
    • 77955229673 scopus 로고    scopus 로고
    • Resources and waste management in Turin (Italy): The role of recycled aggregates in the sustainable supply mix
    • Blengini, G.A., Garbarino, E.: Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix. J. Clean. Prod. 18, 1021-1030 (2010)
    • (2010) J. Clean. Prod. , vol.18 , pp. 1021-1030
    • Blengini, G.A.1    Garbarino, E.2
  • 5
    • 77950475935 scopus 로고    scopus 로고
    • Sustainable construction: Construction and demolition waste reconsidered
    • Merino, M., Izquierdo, P., Weis, I.: Sustainable construction: construction and demolition waste reconsidered. Waste Manage. Res. 28, 118-129 (2010)
    • (2010) Waste Manage. Res. , vol.28 , pp. 118-129
    • Merino, M.1    Izquierdo, P.2    Weis, I.3
  • 6
    • 77958180260 scopus 로고    scopus 로고
    • Optimization of C&D waste management by the application of life cycle Assessment (LCA) methodology: The case of the municipality of Rome
    • La Marca, F.: Optimization of C&D waste management by the application of life cycle Assessment (LCA) methodology: the case of the municipality of Rome, Italy. WIT Trans. Ecol. Environ. 129, 497-508 (2010)
    • (2010) Italy. WIT Trans. Ecol. Environ. , vol.129 , pp. 497-508
    • La Marca, F.1
  • 7
    • 75849159199 scopus 로고    scopus 로고
    • Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain
    • Ortiz, O., Pasqualino, J.C., Castells, F.: Environmental performance of construction waste: comparing three scenarios from a case study in Catalonia, Spain. Waste Manage. 30, 646-654 (2010)
    • (2010) Waste Manage , vol.30 , pp. 646-654
    • Ortiz, O.1    Pasqualino, J.C.2    Castells, F.3
  • 8
    • 67650732434 scopus 로고    scopus 로고
    • Expert-based scenarios for strategic waste and resource management planning C&D waste recycling in the Canton of Zurich
    • Spoerri, A., Lang, D.J., Binder, C.R., Scholz, R.W.: Expert-based scenarios for strategic waste and resource management planning C&D waste recycling in the Canton of Zurich, Switzerland. Resour. Conserv. Recyl. 53, 592-600 (2009)
    • (2009) Switzerland. Resour. Conserv. Recyl. , vol.53 , pp. 592-600
    • Spoerri, A.1    Lang, D.J.2    Binder, C.R.3    Scholz, R.W.4
  • 9
    • 69949101633 scopus 로고    scopus 로고
    • Embodied energy of CDW recycling and technical metabolism due to regional differences and building designs. Building a sustainable future
    • Hermreck, C., Chong, W.K.: Embodied energy of CDW recycling and technical metabolism due to regional differences and building designs. Building a Sustainable Future. In: Proceedings of the 2009 Construction Research Congress. pp. 526-536 (2009)
    • (2009) Proceedings of the 2009 Construction Research Congress , pp. 526-536
    • Hermreck, C.1    Chong, W.K.2
  • 10
    • 35548975247 scopus 로고    scopus 로고
    • Evaluation of sites for the location of WEEE recycling plants in Spain
    • Queiruga, D., Walther, G., González-Benito, J., Spengler, T.: Evaluation of sites for the location of WEEE recycling plants in Spain. Waste Manage. 28, 181-190 (2008)
    • (2008) Waste Manage , vol.28 , pp. 181-190
    • Queiruga, D.1    Walther, G.2    González-Benito, J.3    Spengler, T.4
  • 11
    • 79954594081 scopus 로고    scopus 로고
    • Modeling the use of transportation energy for recycling construction steel
    • Chong, W., Hermerck, C.: Modeling the use of transportation energy for recycling construction steel. Clean Technol. Environ. Policy 13, 317-330 (2010)
    • (2010) Clean Technol. Environ. Policy , vol.13 , pp. 317-330
    • Chong, W.1    Hermerck, C.2
  • 12
    • 79956224504 scopus 로고    scopus 로고
    • A model for costbenefit analysis of construction and demolition waste management throughout the waste chain
    • Yuan, H.P., Shen, L.Y., Hao, J.J.L., Lu, W.S.: A model for costbenefit analysis of construction and demolition waste management throughout the waste chain. Resour. Conserv. Recyl. 55, 604-612 (2011)
    • (2011) Resour. Conserv. Recyl. , vol.55 , pp. 604-612
    • Yuan, H.P.1    Shen, L.Y.2    Hao, J.J.L.3    Lu, W.S.4
  • 13
    • 33744941582 scopus 로고    scopus 로고
    • A benefit-cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia
    • Begum, R.A., Siwar, C., Pereira, J.J., Jaafar, A.H.: A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resour Conserv Recyl 48, 86-98 (2006)
    • (2006) Resour Conserv Recyl , vol.48 , pp. 86-98
    • Begum, R.A.1    Siwar, C.2    Pereira, J.J.3    Jaafar, A.H.4
  • 14
    • 9744222868 scopus 로고    scopus 로고
    • A systems analysis tool for construction and demolition wastes management
    • Wang, J.Y., Toruan, A., Christoforou, C., Fadlalla, H.: A systems analysis tool for construction and demolition wastes management. Waste Manage. 24, 989-997 (2004)
    • (2004) Waste Manage. , vol.24 , pp. 989-997
    • Wang, J.Y.1    Toruan, A.2    Christoforou, C.3    Fadlalla, H.4
  • 15
    • 0036890626 scopus 로고    scopus 로고
    • Recycling of construction and demolition waste via a mechanical sorting process
    • Huang, W.-L., Lin, D.-H., Chang, N.-B., Lin, K.-S.: Recycling of construction and demolition waste via a mechanical sorting process. Resour. Conserv. Recyl. 37, 23-37 (2002)
    • (2002) Resour. Conserv. Recyl. , vol.37 , pp. 23-37
    • Huang, W.-L.1    Lin, D.-H.2    Chang, N.-B.3    Lin, K.-S.4
  • 16
    • 0036524543 scopus 로고    scopus 로고
    • Modeling materials flow of waste concrete from construction and demolition wastes in Taiwan
    • Hsiao, T.Y., Huang, Y.T., Yu, Y.H., Wernick, I.K.: Modeling materials flow of waste concrete from construction and demolition wastes in Taiwan. Resour. Policy 28, 39-47 (2002)
    • (2002) Resour. Policy , vol.28 , pp. 39-47
    • Hsiao, T.Y.1    Huang, Y.T.2    Yu, Y.H.3    Wernick, I.K.4
  • 17
    • 80054868845 scopus 로고    scopus 로고
    • Emergy analysis of the recycling options for construction and demolition waste
    • Yuan, F., Shen, L., Li, Q.: Emergy analysis of the recycling options for construction and demolition waste. Waste Manage. 31, 2503-2511 (2011)
    • (2011) Waste Manage , vol.31 , pp. 2503-2511
    • Yuan, F.1    Shen, L.2    Li, Q.3
  • 18
    • 84867581824 scopus 로고    scopus 로고
    • Economic viability analysis of a construction and demolition waste recycling plant in Portugal - part 2: Economic sensitivity analysis
    • doi: 10.1016/j.jclepro.2012.05.006
    • Coelho, A., de Brito, J., Economic viability analysis of a construction and demolition waste recycling plant in Portugal - part II: economic sensitivity analysis. J Clean Prod. (2012). doi: 10.1016/j.jclepro.2012.05.006
    • J Clean Prod. , vol.2012
    • Coelho, A.1    De Brito, J.2
  • 19
    • 76349109476 scopus 로고    scopus 로고
    • Evaluation of the economic feasibility for the recycling of construction and demolition waste in China-The case of Chongqing
    • Zhao, W., Leeftink, R.B., Rotter, V.S.: Evaluation of the economic feasibility for the recycling of construction and demolition waste in China - the case of Chongqing. Resour. Conserv. Recyl. 54, 377-389 (2010)
    • (2010) Resour. Conserv. Recyl. , vol.54 , pp. 377-389
    • Zhao, W.1    Leeftink, R.B.2    Rotter, V.S.3
  • 20
    • 34548188348 scopus 로고    scopus 로고
    • Evaluation of investments in recycling centres for construction and demolition wastes in Brazilian municipalities
    • Nunes, K.R.A., Mahler, C.F., Valle, R., Neves, C.: Evaluation of investments in recycling centres for construction and demolition wastes in Brazilian municipalities. Waste Manage. 27, 1531-1540 (2007)
    • (2007) Waste Manage , vol.27 , pp. 1531-1540
    • Nunes, K.R.A.1    Mahler, C.F.2    Valle, R.3    Neves, C.4
  • 21
    • 33244459426 scopus 로고    scopus 로고
    • A model for assessing the economic viability of construction and demolition waste recycling- The case of Ireland
    • Duran, X., Lenihan, H., O0Regan, B.: A model for assessing the economic viability of construction and demolition waste recycling - the case of Ireland. Resour. Conserv. Recyl. 46, 302-320 (2006)
    • (2006) Resour. Conserv. Recyl. , vol.46 , pp. 302-320
    • Duran, X.1    Lenihan, H.2    Oregan, B.3
  • 22
    • 9644252862 scopus 로고    scopus 로고
    • Environmental management of construction and demolition waste in Kuwait
    • Kartam, N., Al-Mutairi, N., Al-Ghusain, I., Al-Humoud, J.: Environmental management of construction and demolition waste in Kuwait. Waste Manage. 24(10), 1049-1059 (2004)
    • (2004) Waste Manage , vol.24 , Issue.10 , pp. 1049-1059
    • Kartam, N.1    Al-Mutairi, N.2    Al-Ghusain, I.3    Al-Humoud, J.4
  • 24
    • 79957952566 scopus 로고    scopus 로고
    • Design of a recovery network for WEEE collection: The case of Galicia, Spain
    • Mar-Ortiz, J., Adenso-Diaz, B., González-Velarde, J.L.: Design of a recovery network for WEEE collection: the case of Galicia, Spain. J. Oper. Res. Soc. 62, 1471-1484 (2011)
    • (2011) J. Oper. Res. Soc. , vol.62 , pp. 1471-1484
    • Mar-Ortiz, J.1    Adenso-Diaz, B.2    González-Velarde, J.L.3
  • 25
    • 79959878693 scopus 로고    scopus 로고
    • Capacity planning for electronic waste management facilities under uncertainty: Multi-objective multi-time-step model development
    • Ahluwalia, P.K., Nema, A.K.: Capacity planning for electronic waste management facilities under uncertainty: multi-objective multi-time-step model development. Waste Manage. Res. 29(7), 694-709 (2011)
    • (2011) Waste Manage. Res. , vol.29 , Issue.7 , pp. 694-709
    • Ahluwalia, P.K.1    Nema, A.K.2
  • 26
    • 79960367418 scopus 로고    scopus 로고
    • Matching construction and demolition waste supply to recycling demand: A regional management chain model
    • Hiete, M., Stengel, J., Ludwig, J., Schultmann, F.: Matching construction and demolition waste supply to recycling demand: a regional management chain model. Build Res. Inf. 39, 333-351 (2011)
    • (2011) Build Res. Inf. , vol.39 , pp. 333-351
    • Hiete, M.1    Stengel, J.2    Ludwig, J.3    Schultmann, F.4
  • 27
    • 80051692171 scopus 로고    scopus 로고
    • Estimation of construction and demolition waste (C&DW) generation and multicriteria analysis of C&DW management alternatives: A case study in Spain
    • Coronado, M., Dosal, E., Coz, A., Viguri, J.R., Andrés, A.: Estimation of construction and demolition waste (C&DW) generation and multicriteria analysis of C&DW management alternatives: a case study in Spain. Waste Biomass. Valoriz. 2, 209-225 (2011)
    • (2011) Waste Biomass. Valoriz. , vol.2 , pp. 209-225
    • Coronado, M.1    Dosal, E.2    Coz, A.3    Viguri, J.R.4    Andrés, A.5
  • 28
    • 4744350100 scopus 로고    scopus 로고
    • A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features
    • Robinson, G.R., Kapo, K.E.: A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features. Resour. Conserv. Recyl. 42, 351-365 (2004)
    • (2004) Resour. Conserv. Recyl. , vol.42 , pp. 351-365
    • Robinson, G.R.1    Kapo, K.E.2
  • 29
    • 77953537340 scopus 로고    scopus 로고
    • Assessing multiple criteria for the optimal location of a construction and demolition waste management facility
    • Banias, G., Achillas, C., Vlachokostas, C., Mousssiopoulos, N., Tarsenis, S.: Assessing multiple criteria for the optimal location of a construction and demolition waste management facility. Build. Environ. 45, 2317-2326 (2010)
    • (2010) Build. Environ. , vol.45 , pp. 2317-2326
    • Banias, G.1    Achillas, C.2    Vlachokostas, C.3    Mousssiopoulos, N.4    Tarsenis, S.5
  • 30
    • 84862500499 scopus 로고    scopus 로고
    • Application of multi-criteria decision-making tool to locate Construction and Demolition Waste (C&DW) recycling facilities in a northern Spanish region
    • Dosal, E., Coronado, M., Muñoz, I., Viguri, J.R., Andrés, A.: Application of multi-criteria decision-making tool to locate Construction and Demolition Waste (C&DW) recycling facilities in a northern Spanish region. Environ. Eng. Manag. J. 11(3), 545-556 (2012)
    • (2012) Environ. Eng. Manag. J. , vol.11 , Issue.3 , pp. 545-556
    • Dosal, E.1    Coronado, M.2    Muñoz, I.3    Viguri, J.R.4    Andrés, A.5
  • 31
    • 84867579672 scopus 로고    scopus 로고
    • Economic viability analysis of a construction and demolition waste recycling plant in Portugal - part 1: Location, materials, technology and economic analysis
    • Coelho, A., de Brito, J., Economic viability analysis of a construction and demolition waste recycling plant in Portugal - part I: location, materials, technology and economic analysis. J. Clean. Prod. (2012). http://dx.doi.org/10. 1016/j.jclepro.2012.08.024
    • (2012) J. Clean. Prod.
    • Coelho, A.1    De Brito, J.2
  • 32
    • 84892839687 scopus 로고    scopus 로고
    • BOC: Boletin Oficial de Cantabria (BOC)/Official Gazette of Cantabria. Decree 15/2010. Sectorial Plan of C&DW of Cantabria. BOC 66, 12005-12198 (2010)
    • BOC: Boletin Oficial de Cantabria (BOC)/Official Gazette of Cantabria. Decree 15/2010. Sectorial Plan of C&DW of Cantabria. BOC 66, 12005-12198 (2010)
  • 33
    • 84892855909 scopus 로고    scopus 로고
    • BOC: Boletin Oficial de Cantabria (BOC)/Official Gazette of Cantabria. Decree 72/2010.Decree of C&DW management. BOC 214, 37087-37108 (2010)
    • BOC: Boletin Oficial de Cantabria (BOC)/Official Gazette of Cantabria. Decree 72/2010.Decree of C&DW management. BOC 214, 37087-37108 (2010)
  • 34
    • 84892865469 scopus 로고    scopus 로고
    • Accessed January 2012
    • Michelin: Route planner. http://www.viamichelin.es (2012). Accessed January 2012
    • (2012) Michelin: Route Planner


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.