메뉴 건너뛰기




Volumn 140, Issue 2, 2014, Pages 238-249

Optimization model for planning regional water resource systems under uncertainty

Author keywords

Decision analysis; Functional interval; Interval semiinfinite de novo programming; Multiobjective; Planning; Uncertainty; Water resources.

Indexed keywords

CONVENTIONAL OPTIMIZATION; FUNCTIONAL INTERVAL; MULTI OBJECTIVE; NOVO PROGRAMMING; REGIONAL WATER RESOURCES; UNCERTAINTY; VIOLATION OF CONSTRAINTS; WATERRESOURCE MANAGEMENT;

EID: 84892850994     PISSN: 07339496     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)WR.1943-5452.0000303     Document Type: Article
Times cited : (20)

References (49)
  • 1
    • 67651154601 scopus 로고    scopus 로고
    • Spatial and temporal analysis of evapotranspiration using satellite remote sensing data: A case study in the Gezira Scheme, Sudan
    • Bashir, M. A., Tanakamaru, H., and Tada, A. (2009). "Spatial and temporal analysis of evapotranspiration using satellite remote sensing data: A case study in the Gezira Scheme, Sudan." J. Environ. Inform., 13(2), 86-92.
    • (2009) J. Environ. Inform. , vol.13 , Issue.2 , pp. 86-92
    • Bashir, M.A.1    Tanakamaru, H.2    Tada, A.3
  • 2
    • 0030616656 scopus 로고    scopus 로고
    • Incorporating climate change into risk assessment using grey mathematical programming
    • Bass, B., Huang, G. H., and Russo, J. (1997). "Incorporating climate change into risk assessment using grey mathematical programming." J. Environ. Manage., 49(1), 107-124.
    • (1997) J. Environ. Manage. , vol.49 , Issue.1 , pp. 107-124
    • Bass, B.1    Huang, G.H.2    Russo, J.3
  • 3
    • 0031412398 scopus 로고    scopus 로고
    • Water pollution control in a river basin by interactive fuzzy interval multi-objective programming
    • 10.1061/(ASCE)0733-9372(1997)123:12(1208)
    • Chang, N. B., and Chen, H. W. (1997). "Water pollution control in a river basin by interactive fuzzy interval multi-objective programming." J. Environ. Eng., 10.1061/(ASCE)0733-9372(1997)123:12(1208), 1208-1216.
    • (1997) J. Environ. Eng. , pp. 1208-1216
    • Chang, N.B.1    Chen, H.W.2
  • 4
    • 0031162588 scopus 로고    scopus 로고
    • A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems
    • Chang, N. B., and Wang, S. F. (1997). "A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems." Eur. J. Oper. Res., 99(2), 303-321.
    • (1997) Eur. J. Oper. Res. , vol.99 , Issue.2 , pp. 303-321
    • Chang, N.B.1    Wang, S.F.2
  • 5
    • 0035254855 scopus 로고    scopus 로고
    • A derivative algorithm for inexact quadratic program-Application to environmental decision-making under uncertainty
    • Chen, M. J., and Huang, G. H. (2001). "A derivative algorithm for inexact quadratic program-Application to environmental decision-making under uncertainty." Eur. J. Oper. Res., 128(3), 570-586.
    • (2001) Eur. J. Oper. Res. , vol.128 , Issue.3 , pp. 570-586
    • Chen, M.J.1    Huang, G.H.2
  • 6
    • 33751054566 scopus 로고    scopus 로고
    • Fuzzy multi-stage de Novo programming problem
    • Chen, Y. W., and Hsieh, H. E. (2006). "Fuzzy multi-stage de Novo programming problem." Appl. Math. Comput., 181(2), 1139-1147.
    • (2006) Appl. Math. Comput. , vol.181 , Issue.2 , pp. 1139-1147
    • Chen, Y.W.1    Hsieh, H.E.2
  • 7
    • 77955769916 scopus 로고    scopus 로고
    • Management policy and operation regulation report of Yuecheng Reservoir, Technical Rep.
    • Design, and Research Institute of Zhangweinan River Administration (DRIZRA). Zhangweinan River Management Dept., Dezhou, Shandong Province, China
    • Design, and Research Institute of Zhangweinan River Administration (DRIZRA). (2008). Management policy and operation regulation report of Yuecheng Reservoir, Technical Rep., Zhangweinan River Management Dept., Dezhou, Shandong Province, China.
    • (2008)
  • 8
    • 77955771096 scopus 로고    scopus 로고
    • Chorography of Zhangweinan River
    • Editorial Board of Chorography 573 of Zhangweinan River (EBCZR), Tianjin Science and Technology Press, Tianjin, China
    • Editorial Board of Chorography 573 of Zhangweinan River (EBCZR). (2003). Chorography of Zhangweinan River, Tianjin Science and Technology Press, Tianjin, China.
    • (2003)
  • 9
    • 33947652279 scopus 로고    scopus 로고
    • Sensitivity analysis in linear semi-infinite programming: Perturbing cost and right-hand-side coefficients
    • Goberna, M. A., Gómez, S., Guerra, F., and Todorov, M. I. (2007). "Sensitivity analysis in linear semi-infinite programming: Perturbing cost and right-hand-side coefficients." Eur. J. Oper. Res., 181(3), 1069-1085.
    • (2007) Eur. J. Oper. Res. , vol.181 , Issue.3 , pp. 1069-1085
    • Goberna, M.A.1    Gómez, S.2    Guerra, F.3    Todorov, M.I.4
  • 10
    • 0036883798 scopus 로고    scopus 로고
    • Linear semi-infinite programming theory: An updated survey
    • Goberna, M. A., and López, M. A. (2002). "Linear semi-infinite programming theory: An updated survey." Eur. J. Oper. Res., 143(2), 390-405.
    • (2002) Eur. J. Oper. Res. , vol.143 , Issue.2 , pp. 390-405
    • Goberna, M.A.1    López, M.A.2
  • 11
    • 47749126234 scopus 로고    scopus 로고
    • ICCSIP: An inexact chance-constrained semi-infinite programming approach for energy systems planning under uncertainty
    • Guo, P., Huang, G. H., He, L., and Cai, Y. P. (2008). "ICCSIP: An inexact chance-constrained semi-infinite programming approach for energy systems planning under uncertainty." Energy Sources Part A, 30(14-15), 1345-1366.
    • (2008) Energy Sources Part A , vol.30 , Issue.14-15 , pp. 1345-1366
    • Guo, P.1    Huang, G.H.2    He, L.3    Cai, Y.P.4
  • 12
    • 45749125818 scopus 로고    scopus 로고
    • An interval-parameter semi-infinite programming method for municipal solid waste management
    • Technical Rep., Environmental Informatics Laboratory, Univ. of Regina, SK, Canada
    • He, L., and Huang, G. H. (2004). "An interval-parameter semi-infinite programming method for municipal solid waste management." Technical Rep., Environmental Informatics Laboratory, Univ. of Regina, SK, Canada.
    • (2004)
    • He, L.1    Huang, G.H.2
  • 13
    • 51949096030 scopus 로고    scopus 로고
    • Optimization of regional waste management systems based on inexact semi-infinite programming
    • He, L., and Huang, G. H. (2008). "Optimization of regional waste management systems based on inexact semi-infinite programming." Can. J. Civ. Eng., 35(9), 987-998.
    • (2008) Can. J. Civ. Eng. , vol.35 , Issue.9 , pp. 987-998
    • He, L.1    Huang, G.H.2
  • 14
    • 70350140667 scopus 로고    scopus 로고
    • An interval mixed-integer semi-infinite programming method for municipal solid waste management
    • He, L., Huang, G. H., Zeng, G. M., and Lu, H. W. (2009). "An interval mixed-integer semi-infinite programming method for municipal solid waste management." J. Air Waste Manage. Assoc., 59(2), 236-246.
    • (2009) J. Air Waste Manage. Assoc. , vol.59 , Issue.2 , pp. 236-246
    • He, L.1    Huang, G.H.2    Zeng, G.M.3    Lu, H.W.4
  • 15
    • 0032070909 scopus 로고    scopus 로고
    • A hybrid inexact-stochastic water management model
    • Huang, G. H. (1998). "A hybrid inexact-stochastic water management model." Eur. J. Oper. Res., 107(1), 137-158.
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.1 , pp. 137-158
    • Huang, G.H.1
  • 16
    • 84963455687 scopus 로고
    • A grey linear programming approach for municipal solid waste management planning under uncertainty
    • Huang, G. H., Baetz, B. W., and Patry, G. G. (1992). "A grey linear programming approach for municipal solid waste management planning under uncertainty." Civ. Eng. Syst., 9(4), 319-335.
    • (1992) Civ. Eng. Syst. , vol.9 , Issue.4 , pp. 319-335
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 17
    • 84963458331 scopus 로고
    • Grey quadratic programming and its application to municipal waste management planning under uncertainty
    • Huang, G. H., Baetz, B. W., and Patry, G. G. (1995). "Grey quadratic programming and its application to municipal waste management planning under uncertainty." Eng. Optim., 23(3), 201-223.
    • (1995) Eng. Optim. , vol.23 , Issue.3 , pp. 201-223
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 18
    • 0035564378 scopus 로고    scopus 로고
    • An intervalparameter fuzzy stochastic programming approach for municipal solid waste management and planning
    • Huang, G. H., Sae-Lim, N., Liu, L., and Chen, Z. (2001). "An intervalparameter fuzzy stochastic programming approach for municipal solid waste management and planning." Environ. Model. Assess., 6(4), 271-283.
    • (2001) Environ. Model. Assess. , vol.6 , Issue.4 , pp. 271-283
    • Huang, G.H.1    Sae-Lim, N.2    Liu, L.3    Chen, Z.4
  • 19
    • 57649225566 scopus 로고    scopus 로고
    • A hybrid perturbation and Morris approach for identifying sensitive parameters in surface water quality models
    • Huang, Y. T., and Liu, L. (2008). "A hybrid perturbation and Morris approach for identifying sensitive parameters in surface water quality models." J. Environ. Inform., 12(2), 150-159.
    • (2008) J. Environ. Inform. , vol.12 , Issue.2 , pp. 150-159
    • Huang, Y.T.1    Liu, L.2
  • 20
    • 82455207581 scopus 로고    scopus 로고
    • Technical Rep.
    • Investigation and Evaluation of Water Resources in Zhangweinan River (IEWR) Hai River Conservancy Committee, Tianjin, China
    • Investigation and Evaluation of Water Resources in Zhangweinan River (IEWR). (2003). Technical Rep., Hai River Conservancy Committee, Tianjin, China.
    • (2003)
  • 21
    • 33744538760 scopus 로고    scopus 로고
    • Grey fuzzy optimization model for water quality management of a river system
    • Karmakar, S., and Mujumdar, P. P. (2006). "Grey fuzzy optimization model for water quality management of a river system." Adv. Water Resour., 29(7), 1088-1105.
    • (2006) Adv. Water Resour. , vol.29 , Issue.7 , pp. 1088-1105
    • Karmakar, S.1    Mujumdar, P.P.2
  • 22
    • 67349090506 scopus 로고    scopus 로고
    • Toward sustainable reservoir design: Application of de Novo programming
    • M.Sc. thesis, Univ. of Manitoba, Winnipeg, Canada
    • Kotula, A. S. (1997). "Toward sustainable reservoir design: Application of de Novo programming." M.Sc. thesis, Univ. of Manitoba, Winnipeg, Canada.
    • (1997)
    • Kotula, A.S.1
  • 23
    • 3142684717 scopus 로고    scopus 로고
    • Solving a class of fuzzy linear programs by using semi-infinite programming techniques
    • León, T., and Vercher, E. (2004). "Solving a class of fuzzy linear programs by using semi-infinite programming techniques." Fuzzy Sets Syst., 146(2), 235-253.
    • (2004) Fuzzy Sets Syst. , vol.146 , Issue.2 , pp. 235-253
    • León, T.1    Vercher, E.2
  • 24
    • 0025207957 scopus 로고
    • Multicriteria de Novo programming with fuzzy parameters
    • Li, R. J., and Lee, E. S. (1990). "Multicriteria de Novo programming with fuzzy parameters." Comput. Math. Appl., 19(5), 13-20.
    • (1990) Comput. Math. Appl. , vol.19 , Issue.5 , pp. 13-20
    • Li, R.J.1    Lee, E.S.2
  • 25
    • 38249006434 scopus 로고
    • De Novo programming with fuzzy coefficients and multiple fuzzy goals
    • Li, R. J., and Lee, E. S. (1993). "De Novo programming with fuzzy coefficients and multiple fuzzy goals." J. Math. Anal. Appl., 172(1), 212-220.
    • (1993) J. Math. Anal. Appl. , vol.172 , Issue.1 , pp. 212-220
    • Li, R.J.1    Lee, E.S.2
  • 26
    • 77955770156 scopus 로고    scopus 로고
    • An inexact two-stage water management model for planning agricultural irrigation under uncertainty
    • Li, W., Li, Y. P., Li, C. H., and Huang, G. H. (2010). "An inexact two-stage water management model for planning agricultural irrigation under uncertainty." Agric. Water Manage., 97(11), 1905-1914.
    • (2010) Agric. Water Manage. , vol.97 , Issue.11 , pp. 1905-1914
    • Li, W.1    Li, Y.P.2    Li, C.H.3    Huang, G.H.4
  • 27
    • 62349084782 scopus 로고    scopus 로고
    • A multistage fuzzy-stochastic programming model for supporting sustainable waterresources allocation and management
    • Li, Y. P., Huang, G. H., Huang, Y. F., and Zhou, H. D. (2009). "A multistage fuzzy-stochastic programming model for supporting sustainable waterresources allocation and management." Environ. Model. Softw., 24(7), 786-797.
    • (2009) Environ. Model. Softw. , vol.24 , Issue.7 , pp. 786-797
    • Li, Y.P.1    Huang, G.H.2    Huang, Y.F.3    Zhou, H.D.4
  • 28
    • 33947581401 scopus 로고    scopus 로고
    • Mixed interval-fuzzy tow-stage integer programming and its application to flood-diversion planning
    • Li, Y. P., Huang, G. H., and Nie, S. L. (2007a). "Mixed interval-fuzzy tow-stage integer programming and its application to flood-diversion planning." Eng. Optim., 39(2), 163-183.
    • (2007) Eng. Optim. , vol.39 , Issue.2 , pp. 163-183
    • Li, Y.P.1    Huang, G.H.2    Nie, S.L.3
  • 29
    • 45349084986 scopus 로고    scopus 로고
    • An inexact two-stage quadratic program for water resources planning
    • Li, Y. P., Huang, G. H., Xiao, H. N., and Qin, X. S. (2007b). "An inexact two-stage quadratic program for water resources planning." J. Environ. Inform., 10(2), 99-105.
    • (2007) J. Environ. Inform. , vol.10 , Issue.2 , pp. 99-105
    • Li, Y.P.1    Huang, G.H.2    Xiao, H.N.3    Qin, X.S.4
  • 30
    • 38949163939 scopus 로고    scopus 로고
    • Interval-fuzzy multistage programming for water resources management under uncertainty
    • Li, Y. P., Huang, G. H., Yang, Z. F., and Nie, S. L. (2008). "Interval-fuzzy multistage programming for water resources management under uncertainty." Resour. Conserv. Recycl., 52(5), 800-812.
    • (2008) Resour. Conserv. Recycl. , vol.52 , Issue.5 , pp. 800-812
    • Li, Y.P.1    Huang, G.H.2    Yang, Z.F.3    Nie, S.L.4
  • 31
    • 71649105827 scopus 로고    scopus 로고
    • Development of an intervalvalued fuzzy linear programming method based on infinite a-cuts for water resources management
    • Lu, H. W., Huang, G. H., and He, L. (2010). "Development of an intervalvalued fuzzy linear programming method based on infinite a-cuts for water resources management." Environ. Model. Softw., 25(3), 354-361.
    • (2010) Environ. Model. Softw. , vol.25 , Issue.3 , pp. 354-361
    • Lu, H.W.1    Huang, G.H.2    He, L.3
  • 32
    • 0038509120 scopus 로고    scopus 로고
    • A two-stage interval stochastic programming model for waste management under uncertainty
    • Maqsood, I., and Huang, G. H. (2003). "A two-stage interval stochastic programming model for waste management under uncertainty." J. Air Waste Manage. Assoc., 53(5), 540-552.
    • (2003) J. Air Waste Manage. Assoc. , vol.53 , Issue.5 , pp. 540-552
    • Maqsood, I.1    Huang, G.H.2
  • 33
    • 13544252464 scopus 로고    scopus 로고
    • An intervalparameter fuzzy two-stage stochastic program for water resources management under uncertainty
    • Maqsood, I., Huang, G. H., and Yeomans, J. S. (2005). "An intervalparameter fuzzy two-stage stochastic program for water resources management under uncertainty." Eur. J. Oper. Res., 167(1), 208-225.
    • (2005) Eur. J. Oper. Res. , vol.167 , Issue.1 , pp. 208-225
    • Maqsood, I.1    Huang, G.H.2    Yeomans, J.S.3
  • 34
    • 70349673157 scopus 로고    scopus 로고
    • GIS-based contaminant transport model for heterogeneous hydrogeological settings
    • Menezes, G. B., and Inyang, H. I. (2009). "GIS-based contaminant transport model for heterogeneous hydrogeological settings." J. Environ. Inform., 14(1), 11-24.
    • (2009) J. Environ. Inform. , vol.14 , Issue.1 , pp. 11-24
    • Menezes, G.B.1    Inyang, H.I.2
  • 35
    • 0029271703 scopus 로고
    • Studies on optimum-path ratios in multicriteria de Novo programming-problems
    • Shi, Y. (1995). "Studies on optimum-path ratios in multicriteria de Novo programming-problems." Comput. Math. Appl., 29(5), 43-50.
    • (1995) Comput. Math. Appl. , vol.29 , Issue.5 , pp. 43-50
    • Shi, Y.1
  • 36
    • 0036833064 scopus 로고    scopus 로고
    • On generalized semi-infinite optimization and bi level optimization
    • Stein, O., and Still, G. (2002). "On generalized semi-infinite optimization and bi level optimization." Eur. J. Oper. Res., 142(3), 444-462.
    • (2002) Eur. J. Oper. Res. , vol.142 , Issue.3 , pp. 444-462
    • Stein, O.1    Still, G.2
  • 37
    • 0242406703 scopus 로고    scopus 로고
    • Robot trajectory planning with semi-infinite programming
    • Vaz, A. I. F., Fernandes, E. M. G. P., and Gomes, M. P. S. F. (2004). "Robot trajectory planning with semi-infinite programming." Eur. J. Oper. Res., 153(3), 607-617.
    • (2004) Eur. J. Oper. Res. , vol.153 , Issue.3 , pp. 607-617
    • Vaz, A.I.F.1    Fernandes, E.M.G.P.2    Gomes, M.P.S.F.3
  • 38
    • 57649117220 scopus 로고    scopus 로고
    • Air pollution control with semiinfinite programming
    • Vaz, A. I. F., and Ferreira, E. C. (2009). "Air pollution control with semiinfinite programming." Appl. Math. Model., 33(4), 1957-1969.
    • (2009) Appl. Math. Model. , vol.33 , Issue.4 , pp. 1957-1969
    • Vaz, A.I.F.1    Ferreira, E.C.2
  • 39
    • 0033077246 scopus 로고    scopus 로고
    • A perturbation method for solving linear semi-infinite programming problems
    • Wang, M. H., and Kuo, Y. E. (1999). "A perturbation method for solving linear semi-infinite programming problems." Comput. Math. Appl., 37(4-5), 181-198.
    • (1999) Comput. Math. Appl. , vol.37 , Issue.4-5 , pp. 181-198
    • Wang, M.H.1    Kuo, Y.E.2
  • 40
    • 0021885603 scopus 로고
    • Decision making under uncertainty: A semi-infinite programming approach
    • Weber, R. (1985). "Decision making under uncertainty: A semi-infinite programming approach." Eur. J. Oper. Res., 19(1), 104-113.
    • (1985) Eur. J. Oper. Res. , vol.19 , Issue.1 , pp. 104-113
    • Weber, R.1
  • 41
    • 0346910193 scopus 로고    scopus 로고
    • Corporate optimal production planning with varying environmental costs: A grey compromise programming approach
    • Wu, C. C., and Chang, N. B. (2004). "Corporate optimal production planning with varying environmental costs: A grey compromise programming approach." Eur. J. Oper. Res., 155(1), 68-95.
    • (2004) Eur. J. Oper. Res. , vol.155 , Issue.1 , pp. 68-95
    • Wu, C.C.1    Chang, N.B.2
  • 42
    • 84867541948 scopus 로고    scopus 로고
    • Inexact management modeling for urban water supply systems
    • Xu, Y., Huang, G. H., and Xu, T. Y. (2012). "Inexact management modeling for urban water supply systems." J. Environ. Inform., 20(1), 34-43.
    • (2012) J. Environ. Inform. , vol.20 , Issue.1 , pp. 34-43
    • Xu, Y.1    Huang, G.H.2    Xu, T.Y.3
  • 44
    • 0342975562 scopus 로고
    • Multiple criteria analysis: Operational methods, P. Nijkamp and J. Spronk, eds., Gower Publishing Company, Hampshire, England
    • Zeleny, M. (1981). "A case study in multiobjective design: De Novo programming." Multiple criteria analysis: Operational methods, P. Nijkamp and J. Spronk, eds., Gower Publishing Company, Hampshire, England.
    • (1981) A case study in multiobjective design: De Novo programming
    • Zeleny, M.1
  • 45
    • 46149136868 scopus 로고
    • Optimal system design with multiple Criteria: De Novo programming approach
    • Zeleny, M. (1986). "Optimal system design with multiple Criteria: De Novo programming approach." Eng. Costs Prod. Econ., 10(2), 89-94.
    • (1986) Eng. Costs Prod. Econ. , vol.10 , Issue.2 , pp. 89-94
    • Zeleny, M.1
  • 46
    • 84879654315 scopus 로고
    • Optimizing given systems vs designing optimal systems: The de Novo programming approach
    • Zeleny, M. (1990). "Optimizing given systems vs. designing optimal systems: The de Novo programming approach." Int. J. Gen. Syst., 17(4), 295-307.
    • (1990) Int. J. Gen. Syst. , vol.17 , Issue.4 , pp. 295-307
    • Zeleny, M.1
  • 47
    • 24344459872 scopus 로고    scopus 로고
    • The evolution of optimality: De Novo programming
    • Evolutionary multi-criterion optimization, C. A. Coello, et al., eds., Springer, Heidelberg, Berlin
    • Zeleny, M. (2005). "The evolution of optimality: De Novo programming." Evolutionary multi-criterion optimization, C. A. Coello, et al., eds., Springer, Heidelberg, Berlin, 1-13.
    • (2005) , pp. 1-13
    • Zeleny, M.1
  • 48
    • 67349094507 scopus 로고    scopus 로고
    • Inexact de Novo programming for water resources systems planning
    • Zhang, Y. M., Huang, G. H., and Zhang, X. D. (2009). "Inexact de Novo programming for water resources systems planning." Eur. J. Oper. Res., 199(2), 531-541.
    • (2009) Eur. J. Oper. Res. , vol.199 , Issue.2 , pp. 531-541
    • Zhang, Y.M.1    Huang, G.H.2    Zhang, X.D.3
  • 49
    • 79953042335 scopus 로고    scopus 로고
    • An interval full-infinite mixed-integer programming method for planning municipal energy systems-A case study of Beijing
    • Zhu, Y., Huang, G. H., Li, Y. P., He, L., and Zhang, X. X. (2011). "An interval full-infinite mixed-integer programming method for planning municipal energy systems-A case study of Beijing." Appl. Energy, 88(8), 2846-2862.
    • (2011) Appl. Energy , vol.88 , Issue.8 , pp. 2846-2862
    • Zhu, Y.1    Huang, G.H.2    Li, Y.P.3    He, L.4    Zhang, X.X.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.