메뉴 건너뛰기




Volumn 6, Issue 4, 2001, Pages 271-283

An interval-parameter fuzzy-stochastic programming approach for municipal solid waste management and planning

Author keywords

Chance constraint; Decision making; Environment; Fuzzy; Interval; Optimization; Planning; Solid waste; Stochastic

Indexed keywords

COMPUTER PROGRAMMING; DECISION MAKING; INTEGER PROGRAMMING; OPTIMIZATION; PLANNING; SOLID WASTES; STOCHASTIC MODELS; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS; WASTE MANAGEMENT;

EID: 0035564378     PISSN: 14202026     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1013394118863     Document Type: Article
Times cited : (192)

References (32)
  • 2
    • 0002462984 scopus 로고
    • Trash management: Sizing and timing decisions for incineration and landfill facilities
    • B.W. Baetz, E.I. Pas and A.W. Neebe, Trash management: sizing and timing decisions for incineration and landfill facilities, Interfaces 19(6) (1989) 52-61.
    • (1989) Interfaces , vol.19 , Issue.6 , pp. 52-61
    • Baetz, B.W.1    Pas, E.I.2    Neebe, A.W.3
  • 3
    • 0030615587 scopus 로고    scopus 로고
    • A new approach for long-term planning of solid waste management system using fuzzy global criterion
    • N.B. Chang and H.Y. Lu, A new approach for long-term planning of solid waste management system using fuzzy global criterion, J. Environ. Sci. Health A 32(4) (1997) 1025-1047.
    • (1997) J. Environ. Sci. Health A , vol.32 , Issue.4 , pp. 1025-1047
    • Chang, N.B.1    Lu, H.Y.2
  • 4
    • 0031188843 scopus 로고    scopus 로고
    • A fuzzy interval multiobjective mixed integer programming approach for the optimal planning of solid waste management systems
    • N.B. Chang, Y.L. Chen and S.F. Wang, A fuzzy interval multiobjective mixed integer programming approach for the optimal planning of solid waste management systems, Fuzzy Sets and System 89 (1997) 35-59.
    • (1997) Fuzzy Sets and System , vol.89 , pp. 35-59
    • Chang, N.B.1    Chen, Y.L.2    Wang, S.F.3
  • 5
    • 0029515078 scopus 로고
    • A location model for the site selection of solid waste management facilities with traffic congestion constraints
    • N.B. Chang and S.F. Wang, A location model for the site selection of solid waste management facilities with traffic congestion constraints, Civil Engineering System 11 (1994) 287-306.
    • (1994) Civil Engineering System , vol.11 , pp. 287-306
    • Chang, N.B.1    Wang, S.F.2
  • 6
    • 0037798885 scopus 로고
    • Chance constrained programming: An extension of statistical method
    • Academic Press, New York
    • A. Charnes, W.W. Cooper and P. Kirby, Chance constrained programming: An extension of statistical method, in: Optimizing Methods in Statistics (Academic Press, New York, 1972) pp. 391-402.
    • (1972) Optimizing Methods in Statistics , pp. 391-402
    • Charnes, A.1    Cooper, W.W.2    Kirby, P.3
  • 9
    • 0026188898 scopus 로고
    • Stochastic programs for identifying critical structural collapse mechanisms
    • J.H. Ellis, Stochastic programs for identifying critical structural collapse mechanisms, Applied Mathematical Modeling 15 (1991) 367-379.
    • (1991) Applied Mathematical Modeling , vol.15 , pp. 367-379
    • Ellis, J.H.1
  • 13
    • 0032070909 scopus 로고    scopus 로고
    • A hybrid inexact-stochastic water management model
    • G.H. Huang, A hybrid inexact-stochastic water management model, European Journal of Operational Research 107 (1998) 137-158.
    • (1998) European Journal of Operational Research , vol.107 , pp. 137-158
    • Huang, G.H.1
  • 14
    • 84950938520 scopus 로고
    • Grey linear programming, its solving approach, and its application
    • G.H. Huang and R.D. Moore, Grey linear programming, its solving approach, and its application, International Journal of Systems Science 24 (1993) 159-172.
    • (1993) International Journal of Systems Science , vol.24 , pp. 159-172
    • Huang, G.H.1    Moore, R.D.2
  • 15
    • 0000666441 scopus 로고
    • Grey integer programming: An application to waste management planning under uncertainty
    • G.H. Huang, B.W. Baetz and G.G. Patry, Grey integer programming: An application to waste management planning under uncertainty, European Journal of Operational Research 83 (1995) 594-620.
    • (1995) European Journal of Operational Research , vol.83 , pp. 594-620
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 16
    • 84954829625 scopus 로고
    • A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty
    • G.H. Huang, B.W. Baetz and G.G. Patry, A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty, Civil Engineering Systems 10 (1993) 123-146.
    • (1993) Civil Engineering Systems , vol.10 , pp. 123-146
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 19
    • 84963458331 scopus 로고
    • Grey quadratic programming and its application to municipal solid waste management planning under uncertainty
    • G.H. Huang, B.W. Baetz and G.G. Patry, Grey quadratic programming and its application to municipal solid waste management planning under uncertainty, Engineering Optimization 23 (1994) 201-223.
    • (1994) Engineering Optimization , vol.23 , pp. 201-223
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 20
    • 0028665777 scopus 로고
    • Capacity planning for municipal solid waste management systems under uncertainty - A grey fuzzy dynamic programming (GFDP) approach
    • G.H. Huang, B.W. Baetz and G.G. Patry, Capacity planning for municipal solid waste management systems under uncertainty - A grey fuzzy dynamic programming (GFDP) approach, Journal of Urban Planning and Development 120(3) (1994) 132-156.
    • (1994) Journal of Urban Planning and Development , vol.120 , Issue.3 , pp. 132-156
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 21
    • 84963455687 scopus 로고
    • A grey linear programming approach for municipal solid wate management planning under uncertainty
    • G.H. Huang, B.W. Baetz and G.G. Patry, A grey linear programming approach for municipal solid wate management planning under uncertainty, Civil Engineering Systems 9 (1992) 319-335.
    • (1992) Civil Engineering Systems , vol.9 , pp. 319-335
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 22
    • 34249830842 scopus 로고
    • Monte Carlo (importance) sampling within a Benders decomposition algorithm for stochastic linear programs
    • G. Infanger, Monte Carlo (importance) sampling within a Benders decomposition algorithm for stochastic linear programs, Annals of Operations Research 39 (1993) 69-81.
    • (1993) Annals of Operations Research , vol.39 , pp. 69-81
    • Infanger, G.1
  • 23
    • 0000192591 scopus 로고    scopus 로고
    • Cut sharing for multistage stochastic linear programs with interstage dependency
    • G. Infanger and D.P. Morton, Cut sharing for multistage stochastic linear programs with interstage dependency, Mathematical Programming 75 (1996) 241-251.
    • (1996) Mathematical Programming , vol.75 , pp. 241-251
    • Infanger, G.1    Morton, D.P.2
  • 25
    • 0022664256 scopus 로고
    • Risk penalty functions for hazardous waste management
    • A.A. Jennings and P. Suresh, Risk penalty functions for hazardous waste management, J. Environ. Eng. 112(1) (1986) 105-115.
    • (1986) J. Environ. Eng. , vol.112 , Issue.1 , pp. 105-115
    • Jennings, A.A.1    Suresh, P.2
  • 26
    • 0026173739 scopus 로고
    • Multi-objective siting planning for a regional hazardous waste treatment center
    • J.K. Koo, H.S. Shin and H.C. Yoo, Multi-objective siting planning for a regional hazardous waste treatment center, Waste Management & Research 9 (1991) 205-218.
    • (1991) Waste Management & Research , vol.9 , pp. 205-218
    • Koo, J.K.1    Shin, H.S.2    Yoo, H.C.3
  • 28
    • 0028158997 scopus 로고
    • Policy barriers to 50% diversion of municipal solid waste
    • D. Macdonald and P. Vopni, Policy barriers to 50% diversion of municipal solid waste, Waste Management & Research 12 (1994) 257-270.
    • (1994) Waste Management & Research , vol.12 , pp. 257-270
    • Macdonald, D.1    Vopni, P.2
  • 29
    • 0027386559 scopus 로고
    • Aquifer remediation design under uncertainty using a new chance constrained programming technique
    • D.R. Morgan, J.W. Eheart and A.J. Valocchi, Aquifer remediation design under uncertainty using a new chance constrained programming technique, Water Resources Research 29 (1993) 551-568.
    • (1993) Water Resources Research , vol.29 , pp. 551-568
    • Morgan, D.R.1    Eheart, J.W.2    Valocchi, A.J.3
  • 30
    • 0009151239 scopus 로고
    • Comparison of methodologies for fuzzy and stochastic multi-objective programming
    • M. Roubens and J. Teghem, Comparison of methodologies for fuzzy and stochastic multi-objective programming, Fuzzy Sets and Systems 42 (1991) 119-132.
    • (1991) Fuzzy Sets and Systems , vol.42 , pp. 119-132
    • Roubens, M.1    Teghem, J.2
  • 31
    • 0029636125 scopus 로고
    • A linear approximation method for solving a special class of the chance constrained programming problem
    • Y. Zare and A. Daneshmand, A linear approximation method for solving a special class of the chance constrained programming problem, European Journal of Operational Research 80 (1995) 213-225.
    • (1995) European Journal of Operational Research , vol.80 , pp. 213-225
    • Zare, Y.1    Daneshmand, A.2
  • 32
    • 0022098325 scopus 로고
    • Applications of fuzzy sets theory to mathematical programming
    • H.J. Zimmermann, Applications of fuzzy sets theory to mathematical programming, Information Science 36 (1985) 29-58.
    • (1985) Information Science , vol.36 , pp. 29-58
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.