-
1
-
-
56049096723
-
Policies for a single-vendor multi-buyer system with finite production rate
-
Abdul-Jalbar B, Gutierrez JM and Sicilia J (2008). Policies for a single-vendor multi-buyer system with finite production rate. Decision Support System 46(1): 84-100.
-
(2008)
Decision Support System
, vol.46
, Issue.1
, pp. 84-100
-
-
Abdul-Jalbar, B.1
Gutierrez, J.M.2
Sicilia, J.3
-
3
-
-
84985846646
-
A joint economic lot size model for purchaser and vendor
-
Banerjee A (1986). A joint economic lot size model for purchaser and vendor. Decision Science 17(3): 292-311.
-
(1986)
Decision Science
, vol.17
, Issue.3
, pp. 292-311
-
-
Banerjee, A.1
-
4
-
-
0035906315
-
The economic production quantity (EPQ) with shortage derived algebraically
-
Cardenas-Barron LE (2001). The economic production quantity (EPQ) with shortage derived algebraically. International Journal of Production Economics 70(3): 289-292.
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 289-292
-
-
Cardenas-Barron, L.E.1
-
5
-
-
84857450036
-
An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain
-
Cardenas-Barron LE, Teng JT, Trevino-Garza G, Wee HM and Lou KR (2012). An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain. International Journal of Production Economics 136(2): 384-388.
-
(2012)
International Journal of Production Economics
, vol.136
, Issue.2
, pp. 384-388
-
-
Cardenas-Barron, L.1
Teng, J.2
Trevino-Garza, G.3
Wee, H.4
Lou, K.5
-
6
-
-
0000879068
-
Optimal policies for a multi-echelon inventory problem
-
Clark AJ and Scarf H (1960). Optimal policies for a multi-echelon inventory problem. Management Science 6(4): 475-490.
-
(1960)
Management Science
, vol.6
, Issue.4
, pp. 475-490
-
-
Clark, A.J.1
Scarf, H.2
-
7
-
-
84859951755
-
Supply chain model for a deteriorating product with time-varying demand and production rate
-
Giri BC and Maiti T (2012). Supply chain model for a deteriorating product with time-varying demand and production rate. Journal of the Operational Research Society 63(5): 665-573.
-
(2012)
Journal of the Operational Research Society
, vol.63
, Issue.5
, pp. 665-573
-
-
Giri, B.C.1
Maiti, T.2
-
8
-
-
0017416997
-
An integrated inventory model for a singlesupplier single-customer problem
-
Goyal SK (1976). An integrated inventory model for a singlesupplier single-customer problem. International Journal of Production Research 15(1): 107-111.
-
(1976)
International Journal of Production Research
, vol.15
, Issue.1
, pp. 107-111
-
-
Goyal, S.K.1
-
9
-
-
84985781712
-
A joint economic lot size model for purchaser and vendor: A comment
-
Goyal SK (1988). 'A joint economic lot size model for purchaser and vendor': A comment. Decision Science 19(1): 236-241.
-
(1988)
Decision Science
, vol.19
, Issue.1
, pp. 236-241
-
-
Goyal, S.K.1
-
10
-
-
0001539415
-
Short Communication; A one-vendor multibuyer integrated inventory model: A comment
-
Goyal SK (1995). Short Communication; A one-vendor multibuyer integrated inventory model: A comment. European Journal of Operational Research 82(1): 209-210.
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.1
, pp. 209-210
-
-
Goyal, S.K.1
-
12
-
-
58049194044
-
Introducing a new ordering policy in a two-echelon inventory system with poisson demand
-
Haji R, Neghab MP and Baboli A (2009). Introducing a new ordering policy in a two-echelon inventory system with poisson demand. International Journal Production Economics 117(1): 212-218.
-
(2009)
International Journal Production Economics
, vol.117
, Issue.1
, pp. 212-218
-
-
Haji, R.1
Neghab, M.P.2
Baboli, A.3
-
13
-
-
0000356787
-
How many parts to make at once
-
Harris FW (1913). How many parts to make at once. TheMagazine of Management 10(2): 135-136.
-
(1913)
TheMagazine of Management
, vol.10
, Issue.2
, pp. 135-136
-
-
Harris, F.W.1
-
14
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
-
Hill RM (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research 37(11): 2463-2475.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2463-2475
-
-
Hill, R.M.1
-
15
-
-
0037400725
-
Optimizing inventory decisions in a multi-stage multi-customer supply chain
-
Khouja M (2003). Optimizing inventory decisions in a multi-stage multi-customer supply chain. Transportation Research (Part E) 39(3): 193-208.
-
(2003)
Transportation Research (Part E)
, vol.39
, Issue.3
, pp. 193-208
-
-
Khouja, M.1
-
16
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research 81(2): 312-323.
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 312-323
-
-
Lu, L.1
-
17
-
-
34249930610
-
An integrated vendor-buyer inventory model with quality improvement and lead time reduction
-
Ouyang LY, Wu KS and Ho CH (2006). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal Production Economics 108(1-2): 349-358.
-
(2006)
International Journal Production Economics
, vol.108
, Issue.1-2
, pp. 349-358
-
-
Ly, O.1
Ks, W.2
Ch, H.3
-
18
-
-
0037139670
-
A study of an integrated inventory with controllable lead time
-
Pan JCH and Yang JS (2002). A study of an integrated inventory with controllable lead time. International Journal of Production Research 40(5): 1263-1273.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1263-1273
-
-
Pan, J.C.H.1
Yang, J.2
-
19
-
-
0141509085
-
Integrated inventory model for deteriorating items under a multi-echelon supply chain environment
-
Rau H,WuM-Y andWee H-M(2003). Integrated inventory model for deteriorating items under a multi-echelon supply chain environment. International Journal of Production Economics 86(2): 155-168.
-
(2003)
International Journal of Production Economics
, vol.86
, Issue.2
, pp. 155-168
-
-
Rau, H.1
Wu, M.-Y.2
Wee, H.-M.3
-
20
-
-
84890520029
-
-
An MS Thesis, Department of Industrial Engineering, Louisiana State University, Baton Rouge, LA 70803
-
Rochanaluk R (2011). Replenishment policies for a tree-type three echelon supply chain system. An MS Thesis, Department of Industrial Engineering, Louisiana State University, Baton Rouge, LA 70803, http://etd.lsu.edu/docs/ available/etd-05312011-130705/.
-
(2011)
Replenishment Policies for A Tree-type Three Echelon Supply Chain System
-
-
Rochanaluk, R.1
-
22
-
-
84974873088
-
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
-
Sarker BR and Parija GR (1994). An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 45(8): 891-890.
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.8
, pp. 891-890
-
-
Sarker, B.R.1
Parija, G.R.2
-
23
-
-
0030108302
-
Optimal batch size and raw material ordering policy for a production system with a fixedinterval, lumpy-demand delivery system
-
Sarker BR and Parija GR (1996). Optimal batch size and raw material ordering policy for a production system with a fixedinterval, lumpy-demand delivery system. European Journal of Operational Research 89(3): 593-608.
-
(1996)
European Journal of Operational Research
, vol.89
, Issue.3
, pp. 593-608
-
-
Sarker, B.R.1
Parija, G.R.2
-
24
-
-
84861831190
-
A three-echelon supply chain with price-only contracts and sub-supply chain coordination
-
Seifert RW, Zequeira RI and Liao S (2012). A three-echelon supply chain with price-only contracts and sub-supply chain coordination. International Journal of Production Economics 138(2): 345-353.
-
(2012)
International Journal of Production Economics
, vol.138
, Issue.2
, pp. 345-353
-
-
Seifert, R.W.1
Zequeira, R.I.2
Liao, S.3
-
25
-
-
78649780193
-
Integrated location and twoechelon inventory network design under uncertainty
-
Shu J, Ma QA and Li SJ (2010). Integrated location and twoechelon inventory network design under uncertainty. Annals of Operations Research 181(1): 233-247.
-
(2010)
Annals of Operations Research
, vol.181
, Issue.1
, pp. 233-247
-
-
Shu, J.1
Ma, Q.2
Li, S.3
-
26
-
-
78651330103
-
Optimizing inventory policy for products with time-sensitive deteriorating rates in a multiechelon supply chain
-
Wang K-J, Lin YS and Yu JCP (2011). Optimizing inventory policy for products with time-sensitive deteriorating rates in a multiechelon supply chain. International Journal of Production Economics 130(1): 66-76.
-
(2011)
International Journal of Production Economics
, vol.130
, Issue.1
, pp. 66-76
-
-
Wang, K.-J.1
Lin, Y.2
Yu, J.C.P.3
-
27
-
-
8344220512
-
An assembly-type supply-chain system controlled by kanbans under just-in-time philosophy
-
Wang S and Sarker BR (2005). An assembly-type supply-chain system controlled by kanbans under just-in-time philosophy. European Journal of Operational Research 162(1): 153-172.
-
(2005)
European Journal of Operational Research
, vol.162
, Issue.1
, pp. 153-172
-
-
Wang, S.1
Sarker, B.R.2
-
28
-
-
0036577464
-
The economic lot size of the integrated vendor-buyer inventory system derived without derivatives
-
Wee HM and Yang PC (2002). The economic lot size of the integrated vendor-buyer inventory system derived without derivatives. Optimal Control Applications and Methods 23(3): 163-162.
-
(2002)
Optimal Control Applications and Methods
, vol.23
, Issue.3
, pp. 163-162
-
-
Wee, H.1
Yang, P.2
-
29
-
-
2942620832
-
The optimal and heuristic solutions of a distribution network
-
Wee HM and Yang PC (2004). The optimal and heuristic solutions of a distribution network. European Journal of Operation Research 158(3): 626-632.
-
(2004)
European Journal of Operation Research
, vol.158
, Issue.3
, pp. 626-632
-
-
Wee, H.1
Yang, P.2
-
30
-
-
0346503081
-
An integrated single-vendor singlebuyer inventory system with shortage derived algebraically
-
Wu KS and Ouyang LY (2003). An integrated single-vendor singlebuyer inventory system with shortage derived algebraically. Production Planning and Control 14(6): 555-561.
-
(2003)
Production Planning and Control
, vol.14
, Issue.6
, pp. 555-561
-
-
Ks, W.1
Ly, O.2
-
31
-
-
1342266030
-
Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
-
Yang JS and Pan JCH (2004). Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research 42(5): 853-863.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.5
, pp. 853-863
-
-
Yang, J.1
Pan, J.C.H.2
-
32
-
-
78650647991
-
Optimal deteriorating items inventory model with a three-echelon supply chain strategic alliance
-
Yu JCP (2010). Optimal deteriorating items inventory model with a three-echelon supply chain strategic alliance. Asia-Pacific Journal of Operational Research 27(6): 693-711.
-
(2010)
Asia-Pacific Journal of Operational Research
, vol.27
, Issue.6
, pp. 693-711
-
-
Yu, J.C.P.1
-
33
-
-
84857458066
-
A vendor managed inventory supply chain with deteriorating raw materials and products
-
Yu Y, Wang Z and Liang L (2012). A vendor managed inventory supply chain with deteriorating raw materials and products. International Journal of Production Economics 136(2): 266-274.
-
(2012)
International Journal of Production Economics
, vol.136
, Issue.2
, pp. 266-274
-
-
Yu, Y.1
Wang, Z.2
Liang, L.3
-
34
-
-
33846271080
-
Optimal production and shipment models for a single-vendor single-buyer integrated system
-
Zhou YW and Wang SD (2007). Optimal production and shipment models for a single-vendor single-buyer integrated system. European Journal of Operational Research 180(1): 309-328.
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.1
, pp. 309-328
-
-
Zhou, Y.1
Wang, S.2
|