메뉴 건너뛰기




Volumn 2, Issue , 2008, Pages 695-730

Integration in Supply Chain Management

Author keywords

Dynamic market; Mathematical models; Physical models; Supply chain management

Indexed keywords


EID: 84890241206     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1002/9783527619856.ch23     Document Type: Chapter
Times cited : (5)

References (57)
  • 2
    • 0034307297 scopus 로고    scopus 로고
    • Economic Risk Management for Design and Planning of Chemical Manufacturing Supply Chains
    • Applequist G. E. Pekny J. F. Reklaitis G. V. Economic Risk Management for Design and Planning of Chemical Manufacturing Supply Chains. Computers and Chemical Engineering 24 (2000) p. 2211-2222
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2211-2222
    • Applequist, G.E.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 5
    • 84890238264 scopus 로고    scopus 로고
    • Foundations of Computer-Aided Process Operations: A View to the Future Integration or R&D Manufacturing and the Global Supply Chain
    • Austin, Texas
    • Grossmann I. E. McDonald C. M. Foundations of Computer-Aided Process Operations: A View to the Future Integration or R&D Manufacturing and the Global Supply Chain, CACHE Corp., Austin, Texas 2003
    • (2003) CACHE Corp.
    • Grossmann, I.E.1    McDonald, C.M.2
  • 7
    • 0002823699 scopus 로고
    • Managing Supply Chain Inventory: Pitfalls and Opportunities
    • Spring
    • Lee H. L. Killington C. Managing Supply Chain Inventory: Pitfalls and Opportunities. Sloan Management Review, Spring (1992) p. 65-73
    • (1992) Sloan Management Review , pp. 65-73
    • Lee, H.L.1    Killington, C.2
  • 8
    • 0042244076 scopus 로고
    • Facility Location Analysis is Just the Beginning
    • Geoffrion A. M. Powers R. F. Facility Location Analysis is Just the Beginning. Interfaces 10 (1980) p. 22-30
    • (1980) Interfaces , vol.10 , pp. 22-30
    • Geoffrion, A.M.1    Powers, R.F.2
  • 10
    • 0019539238 scopus 로고
    • Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
    • Williams J. F. Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons. Management Science 27 (1981) p. 336-352
    • (1981) Management Science , vol.27 , pp. 336-352
    • Williams, J.F.1
  • 11
    • 0020543858 scopus 로고
    • A Hybrid Algorithm for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures
    • Williams J. F. A Hybrid Algorithm for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures. Management Science 29 (1983) p. 77-92
    • (1983) Management Science , vol.29 , pp. 77-92
    • Williams, J.F.1
  • 12
    • 0023981910 scopus 로고
    • Takahashi Muramatsu R. Inte-grated Production Inventory and Distribution Systems
    • Ischii K. K. Takahashi Muramatsu R. Inte-grated Production Inventory and Distribution Systems. International Journal of Production Research 26 (1988) p. 473-482
    • (1988) International Journal of Production Research , vol.26 , pp. 473-482
    • Ischii, K.K.1
  • 13
    • 0002893158 scopus 로고
    • Resource Deployment Analysis of Global Manufacturing and Distribution Networks
    • Cohen M. A. Lee H. L. Resource Deployment Analysis of Global Manufacturing and Distribution Networks. Journal of Manufacturing and Operations Management 2 (1989) p. 81-104
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 81-104
    • Cohen, M.A.1    Lee, H.L.2
  • 14
    • 0000603141 scopus 로고
    • Impact of Production Scale Economizes Manufacturing Complexity and Transportation Costs on Supply Chain Facility Networks
    • Cohen M. A. Moon S. Impact of Production Scale Economizes Manufacturing Complexity and Transportation Costs on Supply Chain Facility Networks. Journal of Manufacturing and Operations Management 3 (1990) p. 35-46
    • (1990) Journal of Manufacturing and Operations Management , vol.3 , pp. 35-46
    • Cohen, M.A.1    Moon, S.2
  • 15
    • 0027627690 scopus 로고
    • Consoli-dating Product Sizes to Minimize Inventory Levels for a Multi-Stage Production and Distribution Systems
    • Newhart D. D. Stott K. L. Vasko F. J. Consoli-dating Product Sizes to Minimize Inventory Levels for a Multi-Stage Production and Distribution Systems, Journal of the Operational Research Society 44(7) (1993) p. 637-644
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.7 , pp. 637-644
    • Newhart, D.D.1    Stott, K.L.2    Vasko, F.J.3
  • 16
    • 0004499349 scopus 로고
    • Global Supply Chain Management at Digital Equipment Corporation
    • Arntzen B. C. Brown G. G. Harrison T. P. Trafton L. L. Global Supply Chain Management at Digital Equipment Corporation. Interfaces 25 (1995) p. 69-93
    • (1995) Interfaces , vol.25 , pp. 69-93
    • Arntzen, B.C.1    Brown, G.G.2    Harrison, T.P.3    Trafton, L.L.4
  • 17
    • 0029713395 scopus 로고    scopus 로고
    • Mathematical Programming Techniques to De-bottleneck the Supply Chain of Fine Chemical Industries
    • Vaudouris V. T. Mathematical Programming Techniques to De-bottleneck the Supply Chain of Fine Chemical Industries. Computers and Chemical Engineering 20(Suppl.) (1996) p. S1269-1275
    • (1996) Computers and Chemical Engineering , vol.20 , Issue.SUPPL.
    • Vaudouris, V.T.1
  • 18
    • 84890190759 scopus 로고    scopus 로고
    • Blending ORIMS Judge-ment and GIS: Restructuring P&G's Supply Chain
    • Camm J. D. Charman F. A. Evans J. R. Sweeney D. J. Wegryn G. W. Blending ORIMS Judge-ment and GIS: Restructuring P&G's Supply Chain. Research 27 (1997) p. 120-142
    • (1997) Research , vol.27 , pp. 120-142
    • Camm, J.D.1    Charman, F.A.2    Evans, J.R.3    Sweeney, D.J.4    Wegryn, G.W.5
  • 21
    • 0023984228 scopus 로고
    • Integrated Analysis of Global Manufacturing and Distribution Systems: Models and Methods
    • Cohen M. A. Lee H. L. Integrated Analysis of Global Manufacturing and Distribution Systems: Models and Methods. Operations Research 36 (1988) p. 216-228
    • (1988) Operations Research , vol.36 , pp. 216-228
    • Cohen, M.A.1    Lee, H.L.2
  • 22
    • 0025749462 scopus 로고
    • Evaluation of One-for-One Replenishment Policies for Multi-Echelon Inventory Systems
    • Svoronos A. Zipkin P. Evaluation of One-for-One Replenishment Policies for Multi-Echelon Inventory Systems. Management Sciences 37 (1991) p. 68-83
    • (1991) Management Sciences , vol.37 , pp. 68-83
    • Svoronos, A.1    Zipkin, P.2
  • 23
    • 0027912829 scopus 로고
    • Performance Charac-teristics of Stochastic Integrated Production: Distribution Systems
    • Pyke D. F. Cohen M. A. Performance Charac-teristics of Stochastic Integrated Production: Distribution Systems. European Journal of Operational Research 68 (1993) p. 23-48
    • (1993) European Journal of Operational Research , vol.68 , pp. 23-48
    • Pyke, D.F.1    Cohen, M.A.2
  • 24
    • 0028408276 scopus 로고
    • Multi-Product Integrated Production-Distribution Systems
    • Pyke D. F. Cohen M. A. Multi-Product Integrated Production-Distribution Systems. European Journal of Operational Research 74(1) (1994) p. 18-49
    • (1994) European Journal of Operational Research , vol.74 , Issue.1 , pp. 18-49
    • Pyke, D.F.1    Cohen, M.A.2
  • 25
    • 0031108822 scopus 로고    scopus 로고
    • Information Distortion in a Supply Chain: The Bullwhip Effect
    • Lee H. L. Padmanabhan V. Whang S. Information Distortion in a Supply Chain: The Bullwhip Effect. Management Science 43 (1997) p. 546-558
    • (1997) Management Science , vol.43 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 27
    • 0003041566 scopus 로고
    • Scenario Planning at Southern California Edison
    • Mobasheri F. Orren L. H. Sioshansi F. P. Scenario Planning at Southern California Edison. Interfaces 19 (1984) p. 31-44
    • (1984) Interfaces , vol.19 , pp. 31-44
    • Mobasheri, F.1    Orren, L.H.2    Sioshansi, F.P.3
  • 28
    • 0039270669 scopus 로고    scopus 로고
    • Generation Scenarios for the Towers: Instrument System
    • Mulvey J. M. Generation Scenarios for the Towers: Instrument System. Interfaces 26 (1996) p. 1-15
    • (1996) Interfaces , vol.26 , pp. 1-15
    • Mulvey, J.M.1
  • 29
    • 0033890310 scopus 로고    scopus 로고
    • Selecting Scenarios for Environ-mental Disaster Planning
    • Jenkins L. Selecting Scenarios for Environ-mental Disaster Planning. European Journal of Operation and Research 121 (1999) p. 275-286
    • (1999) European Journal of Operation and Research , vol.121 , pp. 275-286
    • Jenkins, L.1
  • 30
    • 0034387708 scopus 로고    scopus 로고
    • Mid-Term Supply Chain Planning Under Demand Uncertainty: Customer Demand Satisfaction and Inventory Management
    • Gupta A. Maranas C. D. McDonald C. M. Mid-Term Supply Chain Planning Under Demand Uncertainty: Customer Demand Satisfaction and Inventory Management. Computers and Chemical Engineering 24 (2000) p. 2613-2621
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2613-2621
    • Gupta, A.1    Maranas, C.D.2    McDonald, C.M.3
  • 34
    • 84963017835 scopus 로고
    • The Transactions Demand for Cash: An Inventory Theoretic Approach
    • Baumol W. J. The Transactions Demand for Cash: An Inventory Theoretic Approach. The Quarterly Journal of Economics 66 (1952) p. 545-556
    • (1952) The Quarterly Journal of Economics , vol.66 , pp. 545-556
    • Baumol, W.J.1
  • 40
    • 0002518812 scopus 로고    scopus 로고
    • Industrial Dynamics Modeling of Supply Chains
    • Towhill D. R. Industrial Dynamics Modeling of Supply Chains. Logistics Information Managment 9(4) (1996) p. 43-56
    • (1996) Logistics Information Managment , vol.9 , Issue.4 , pp. 43-56
    • Towhill, D.R.1
  • 43
    • 84945548067 scopus 로고    scopus 로고
    • A Model Predictive Control Framework for Robust Management of Multi-Product, Multi-Echelon Demand Networks
    • Barcelona, Spain
    • Brown M. W. Rivera D. E. Carlyle W. M. et al. A Model Predictive Control Framework for Robust Management of Multi-Product, Multi-Echelon Demand Networks. In Pro-ceedings of 15th IFAC world Congress, Barcelona, Spain, 2002
    • (2002) Pro-ceedings of 15th IFAC world Congress
    • Brown, M.W.1    Rivera, D.E.2    Carlyle, W.M.3
  • 45
    • 77956776528 scopus 로고    scopus 로고
    • Supply chain management, through combined Simulation-Optimisation approach
    • (L. Puigjaner, A. Espuna, Eds.), Elsevier, Amsterdam
    • Mele F. D., Espuna A., Puigjaner L. Supply chain management, through combined Simulation-Optimisation approach, in Proceedings ESCAPE-15 (L. Puigjaner, A. Espuna, Eds.), Elsevier, Amsterdam, (2005) p. 1405-1410.
    • (2005) Proceedings ESCAPE-15 , pp. 1405-1410
    • Mele, F.D.1    Espuna, A.2    Puigjaner, L.3
  • 46
    • 84890165336 scopus 로고    scopus 로고
    • Multi-Agent Based Decision System for Process Recon-figuration
    • Guadalajara, Mexico
    • Garcia-Beltrán C. and Feritil S. Multi-Agent Based Decision System for Process Recon-figuration, in Latino-American Control Conference, Guadalajara, Mexico, 2002
    • (2002) Latino-American Control Conference
    • Garcia-Beltrán, C.1    Feritil, S.2
  • 47
    • 0037389186 scopus 로고    scopus 로고
    • Smart Shopper: An Agent-Based Web Approach to Internet Shopping
    • Lin J. You J. Smart Shopper: An Agent-Based Web Approach to Internet Shopping. IEEE Trans Fuzzy Systems 11 (2003) p. 226-237
    • (2003) IEEE Trans Fuzzy Systems , vol.11 , pp. 226-237
    • Lin, J.1    You, J.2
  • 48
    • 84890176611 scopus 로고    scopus 로고
    • Report D2-2 Final Specifications of the Supply Chain Multi-Agent Architecture. Project I-303 (GICASA-D)
    • Report D2-2 Final Specifications of the Supply Chain Multi-Agent Architecture. Project I-303 (GICASA-D) 2003
    • (2003)
  • 49
    • 84890206086 scopus 로고    scopus 로고
    • Report D19 Environmental Impact Considerations Based on Life Cycle Analysis. Project G1RD-CT-2000-00318
    • Report D19 Environmental Impact Considerations Based on Life Cycle Analysis. Project G1RD-CT-2000-00318 2003
    • (2003)
  • 54
    • 4244176917 scopus 로고    scopus 로고
    • Handling the Increasing Complexity of Detailed Batch Process Simulation and Optimization
    • Puigjaner L. Handling the Increasing Complexity of Detailed Batch Process Simulation and Optimization. Computers and Chemical Engineering 23(Suppl.) (1999) p. S929-S943
    • (1999) Computers and Chemical Engineering , vol.23 , Issue.SUPPL.
    • Puigjaner, L.1
  • 56
    • 0037138661 scopus 로고    scopus 로고
    • Proposal to Speed Up the Implementation of an Abnormal Situation Management in the Chemical Process Industry
    • Ruiz D. Benqlilou C. Nougués J. M. Puigjaner L. Proposal to Speed Up the Implementation of an Abnormal Situation Management in the Chemical Process Industry. Industrial and Engineering Chemistry Research 41 (2002) p. 817-824
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 817-824
    • Ruiz, D.1    Benqlilou, C.2    Nougués, J.M.3    Puigjaner, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.