메뉴 건너뛰기




Volumn 44, Issue 2, 2010, Pages 49-62

Optimizing the economic production quantity model with discrete delivery orders

Author keywords

EPQ; Multiple discrete deliveries; Optimization

Indexed keywords


EID: 84889562944     PISSN: 0424267X     EISSN: 18423264     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (18)
  • 1
    • 33751334391 scopus 로고    scopus 로고
    • A deterministic inventory/Production model with general inventory cost rate function and piecewise linear concave production costs
    • Bayindir, Z.P., Birbil, S.I., & Frenk, J.B.G. (2007), A Deterministic Inventory/Production Model with General Inventory Cost Rate Function and Piecewise Linear Concave Production Costs. European Journal of Operational Research, 179, 114-123;
    • (2007) European Journal of Operational Research , vol.179 , pp. 114-123
    • Bayindir, Z.P.1    Birbil, S.I.2    Frenk, J.B.G.3
  • 2
    • 0037954401 scopus 로고    scopus 로고
    • The effect of capital lockup and customer trade credits on the optimal lot size - A confirmation of the EPQ
    • Biskup, D., Simons, D., & Jahnke, H. (2003), The Effect of Capital Lockup and Customer Trade Credits on the Optimal Lot Size - A Confirmation of the EPQ. Computers and Operations Research, 30, 1509-1524;
    • (2003) Computers and Operations Research , vol.30 , pp. 1509-1524
    • Biskup, D.1    Simons, D.2    Jahnke, H.3
  • 3
    • 33746802142 scopus 로고    scopus 로고
    • An elaborative unit cost structure-based fuzzy economic production quantity model
    • Chang, P.T. & Chang, C.H. (2006), An Elaborative Unit Cost Structure-based Fuzzy Economic Production Quantity Model. Mathematical and Computer Modeling, 43, 1337-1356;
    • (2006) Mathematical and Computer Modeling , vol.43 , pp. 1337-1356
    • Chang, P.T.1    Chang, C.H.2
  • 4
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • Chiu, S.W., Wang, S.L., & Chiu, Y.S.P. (2007), Determining the Optimal Run Time for EPQ Model with Scrap, Rework, and Stochastic Breakdowns. European Journal of Operational Research, 180, 664-676;
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.S.P.3
  • 5
    • 0038515381 scopus 로고    scopus 로고
    • The optimal cycle time for EPQ inventory model under permissible delay in payments
    • Chung, K.J. & Huang, Y.F. (2003), The Optimal Cycle Time for EPQ Inventory Model under Permissible Delay in Payments. International Journal of Production Economics, 84, 307-318;
    • (2003) International Journal of Production Economics , vol.84 , pp. 307-318
    • Chung, K.J.1    Huang, Y.F.2
  • 6
    • 23044524189 scopus 로고    scopus 로고
    • EOQ model f or deteriorating items with time-varying demand and partial backlogging
    • Goyal, S.K. (2001), EOQ Model f or Deteriorating Items with Time-varying Demand and Partial Backlogging. Journal of the Operational Research Society, 52, 238-249;
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 238-249
    • Goyal, S.K.1
  • 8
    • 33749665095 scopus 로고    scopus 로고
    • An EPQ model with setup cost and process quality as functions of capital expenditure
    • Hou, K.L. (2007), An EPQ Model with Setup Cost and Process Quality as Functions of Capital Expenditure. Applied Mathematical Modeling, 31, 10-17;
    • (2007) Applied Mathematical Modeling , vol.31 , pp. 10-17
    • Hou, K.L.1
  • 9
    • 33646359183 scopus 로고    scopus 로고
    • A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: A fuzzy geometric programming approach
    • Islam, S. & Roy, T.K. (2006), A Fuzzy EPQ Model with Flexibility and Reliability Consideration and Demand Dependent Unit Production Cost under a Space Constraint: A Fuzzy Geometric Programming Approach. Applied Mathematics and Computation, 176, 531-544;
    • (2006) Applied Mathematics and Computation , vol.176 , pp. 531-544
    • Islam, S.1    Roy, T.K.2
  • 10
    • 0002953454 scopus 로고    scopus 로고
    • Economic production quantity for fuzzy demand quantity and fuzzy production quantity
    • Lee, H.M. & Yao, J.S. (1998), Economic Production Quantity for Fuzzy Demand Quantity and Fuzzy Production Quantity. European Journal of Operational Research, 109, 203-211;
    • (1998) European Journal of Operational Research , vol.109 , pp. 203-211
    • Lee, H.M.1    Yao, J.S.2
  • 11
    • 33846902773 scopus 로고    scopus 로고
    • Analysis of postponement strategy by EPQ based models with planned backorders
    • Li, J., Cheng, T.C.E., & Wang, S. (2007), Analysis of Postponement Strategy by EPQ Based Models with Planned Backorders. International Journal of Production Economics, 107, 31-38;
    • (2007) International Journal of Production Economics , vol.107 , pp. 31-38
    • Li, J.1    Cheng, T.C.E.2    Wang, S.3
  • 12
    • 33750797755 scopus 로고    scopus 로고
    • On an EPQ model for deteriorating items under permissible delay in payments
    • Liao, J. J. (2007), On an EPQ Model for Deteriorating Items under Permissible Delay in Payments. Applied Mathematical Modeling, 31, 393-403;
    • (2007) Applied Mathematical Modeling , vol.31 , pp. 393-403
    • Liao, J.J.1
  • 13
    • 37349077845 scopus 로고    scopus 로고
    • A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space
    • Pasandideh, S.H.R, & Niaki, S.T.A. (2008), A Genetic Algorithm Approach to Optimize a Multi-products EPQ Model with Discrete Delivery Orders and Constrained Space. Applied Mathematics and Computation, 195, 506-514;
    • (2008) Applied Mathematics and Computation , vol.195 , pp. 506-514
    • Pasandideh, S.H.R.1    Niaki, S.T.A.2
  • 14
    • 70449526568 scopus 로고    scopus 로고
    • A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages
    • Pasandideh, S.H.R., Niaki, S.T.A., & Aryan Yeganeh, J. (2010), A Parameter-tuned Genetic Algorithm for Multi-product Economic Production Quantity Model with Space Constraint, Discrete Delivery Orders and Shortages. Advances in Engineering Software, 306, 306-314;
    • (2010) Advances in Engineering Software , vol.306 , pp. 306-314
    • Pasandideh, S.H.R.1    Niaki, S.T.A.2    Aryan Yeganeh, J.3
  • 15
    • 77953610512 scopus 로고    scopus 로고
    • A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework and constrained space
    • http://dx.doi.org/10.1007/s00170-009-2432-x.;
    • Pasandideh, S.H.R., Niaki, S.T.A., & Mirhosseyni, S.S. (2010), A Parameter-tuned Genetic Algorithm to Solve Multi-product Economic Production Quantity Model with Defective Items, Rework and Constrained Space. Published online in the International Journal of Advanced Manufacturing Technology, http://dx.doi.org/10.1007/s00170-009-2432-x.;
    • (2010) Published Online in the International Journal of Advanced Manufacturing Technology
    • Pasandideh, S.H.R.1    Niaki, S.T.A.2    Mirhosseyni, S.S.3
  • 17
    • 67649249270 scopus 로고    scopus 로고
    • An economic order quantity under joint replenishment policy to supply expensive imported raw materials with payment in advance
    • Taleizadeh, A.A., Moghadasi, H., Niaki, S.T.A., & Eftekhari, A. (2008), An Economic Order Quantity under Joint Replenishment Policy to Supply Expensive Imported Raw Materials with Payment in Advance. Journal of Applied Sciences, 23, 4263-4273;
    • (2008) Journal of Applied Sciences , vol.23 , pp. 4263-4273
    • Taleizadeh, A.A.1    Moghadasi, H.2    Niaki, S.T.A.3    Eftekhari, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.