메뉴 건너뛰기




Volumn , Issue , 2013, Pages 734-740

Supporting industrial use of probabilistic timing analysis with explicit argumentation

Author keywords

[No Author keywords available]

Indexed keywords

HARDWARE AND SOFTWARE; INDUSTRIAL PRACTICES; INDUSTRIAL USE; MEASUREMENT-BASED; SOFTWARE PROGRAM; TIMING ANALYSIS; UPPER BOUND; WORST-CASE EXECUTION TIME ANALYSIS;

EID: 84889013872     PISSN: 19354576     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/INDIN.2013.6622975     Document Type: Conference Paper
Times cited : (14)

References (24)
  • 3
    • 43949126892 scopus 로고    scopus 로고
    • The worst-case execution-time problem overview of methods and survey of tools
    • May
    • Wilhelm R.et al., "The worst-case execution-time problem overview of methods and survey of tools," ACM Transactions on Embedded Computing Systems, vol.7, pp.1-53, May 2008.
    • (2008) ACM Transactions on Embedded Computing Systems , vol.7 , pp. 1-53
    • Wilhelm, R.1
  • 5
    • 70449579129 scopus 로고    scopus 로고
    • Using randomized caches in probabilistic real-time systems
    • E.Quinones, E.Berger, G.Bernat, and F.Cazorla, "Using Randomized Caches in Probabilistic Real-Time Systems," in ECRTS, 2009.
    • (2009) ECRTS
    • Quinones, E.1    Berger, E.2    Bernat, G.3    Cazorla, F.4
  • 8
    • 84889014492 scopus 로고    scopus 로고
    • PROARTIS Probabilistically analysable real-time systems 2010 , http://www.proartis-project.eu
    • PROARTIS, "Probabilistically analysable real-time systems," feb 2010, http://www.proartis-project.eu/.[Online].Available: http://www.proartis- project.eu
  • 9
    • 84889074528 scopus 로고    scopus 로고
    • RTCA and EUROCAE, DO-178B / ED-12B, Software Considerations in Airborne Systems and Equipment Certification, 1992
    • RTCA and EUROCAE, DO-178B / ED-12B, Software Considerations in Airborne Systems and Equipment Certification, 1992.
  • 10
    • 84888993928 scopus 로고    scopus 로고
    • International Organization for Standardization, ISO/DIS 26262.Road Vehicles-Functional Safety, 2009
    • International Organization for Standardization, ISO/DIS 26262.Road Vehicles-Functional Safety, 2009.
  • 14
  • 16
    • 84877530347 scopus 로고    scopus 로고
    • Guidelines and methods for conducting the safety assessment process on civil airborne systems and equipment
    • , "Guidelines and methods for conducting the safety assessment process on civil airborne systems and equipment," ARP4761, 2001.
    • (2001) ARP4761
  • 18
    • 49649115872 scopus 로고    scopus 로고
    • Obstacles in Worst-Case execution time analysis
    • R.Kirner and P.Puschner, "Obstacles in Worst-Case execution time analysis," in ISORC, 2008.
    • (2008) ISORC
    • Kirner, R.1    Puschner, P.2
  • 19
    • 67650788815 scopus 로고    scopus 로고
    • Safe measurement-based WCET estimation
    • J.-F.Deverge and I.Puaut, "Safe measurement-based WCET estimation," in WCET Workshop, 2005.
    • (2005) WCET Workshop
    • Deverge, J.-F.1    Puaut, I.2
  • 21
    • 84889028094 scopus 로고    scopus 로고
    • Certification Authorities Software Team (CAST), Guidelines for Proposing Alternate Means of Compliance to DO-178B, 2000
    • Certification Authorities Software Team (CAST), Guidelines for Proposing Alternate Means of Compliance to DO-178B, 2000.
  • 22
    • 70349156358 scopus 로고    scopus 로고
    • A generic goal-based certification argument for the justification of formal analysis
    • I.Habli and T.Kelly, "A generic goal-based certification argument for the justification of formal analysis," Electronic Notes in Theoretical Computer Science (ENTCS), pp.27-39, 2009.
    • (2009) Electronic Notes in Theoretical Computer Science (ENTCS) , pp. 27-39
    • Habli, I.1    Kelly, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.