메뉴 건너뛰기




Volumn 51, Issue 21, 2013, Pages 6316-6335

An optimal consignment stock production and replenishment policy with controllable lead time

Author keywords

consignment; integrated production; inventory; lead time; supply chain

Indexed keywords

CONSIGNMENT; CONTROLLABLE LEAD-TIME; EFFICIENT SOLUTION PROCEDURE; INTEGRATED PRODUCTION; INVENTORY; LEADTIME; NUMERICAL EXPERIMENTS; TOTAL EXPECTED COSTS;

EID: 84887825905     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.795668     Document Type: Article
Times cited : (22)

References (36)
  • 1
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee, A. 1986. " A Joint Economic-lot-size Model for Purchaser and Vendor." Decision Sciences 17 (3): 292-311.
    • (1986) Decision Sciences , vol.17 , Issue.3 , pp. 292-311
    • Banerjee, A.1
  • 2
    • 4644312239 scopus 로고    scopus 로고
    • Integrated single vendor single buyer model with stochastic demand and variable lead time
    • Ben-Daya, M., and, M. Hariga. 2004. " Integrated Single Vendor Single Buyer Model with Stochastic Demand and Variable Lead Time." International Journal of Production Economics 92 (1): 75-80.
    • (2004) International Journal of Production Economics , vol.92 , Issue.1 , pp. 75-80
    • Ben-Daya, M.1    Hariga, M.2
  • 3
    • 0006963529 scopus 로고
    • 3rd ed. Upper Saddle River, NJ: Prentice Hall
    • Bolen, W. H. 1988. Contemporary Retailing. 3rd ed. Upper Saddle River, NJ: Prentice Hall.
    • (1988) Contemporary Retailing
    • Bolen, W.H.1
  • 4
    • 0242301655 scopus 로고    scopus 로고
    • Modelling an industrial strategy for inventory management in supply chains: The consignment stock case
    • Braglia, M., and, L. Zavanella. 2003. " Modelling an Industrial Strategy for Inventory Management in Supply Chains: the Consignment Stock Case." International Journal of Production Research 41 (16): 3793-3808.
    • (2003) International Journal of Production Research , vol.41 , Issue.16 , pp. 3793-3808
    • Braglia, M.1    Zavanella, L.2
  • 5
    • 80053573001 scopus 로고    scopus 로고
    • Joint determination of optimal safety stocks and production policy for an imperfect production system
    • Chakraborty, T., and, B. C. Giri. 2012. " Joint Determination of Optimal Safety Stocks and Production Policy for an Imperfect Production System." Applied Mathematical Modelling 36 (2): 712-722.
    • (2012) Applied Mathematical Modelling , vol.36 , Issue.2 , pp. 712-722
    • Chakraborty, T.1    Giri, B.C.2
  • 6
    • 77957709870 scopus 로고    scopus 로고
    • Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
    • Chen, Z. X., and, B. R. Sarker. 2010. " Multi-vendor Integrated Procurement-production System under Shared Transportation and Just-in-time Delivery System." Journal of the Operational Research Society 61 (11): 1654-1666.
    • (2010) Journal of the Operational Research Society , vol.61 , Issue.11 , pp. 1654-1666
    • Chen, Z.X.1    Sarker, B.R.2
  • 7
    • 0001029945 scopus 로고
    • Heuristic policies for inventory ordering problems with long and randomly varying lead times
    • Foote, B., N. Kebriaei, and, H. Kumin. 1988. " Heuristic Policies for Inventory Ordering Problems with Long and Randomly Varying Lead times." Journal of Operations Management 7 (3-4): 115-124.
    • (1988) Journal of Operations Management , vol.7 , Issue.34 , pp. 115-124
    • Foote, B.1    Kebriaei, N.2    Kumin, H.3
  • 8
    • 5644241211 scopus 로고    scopus 로고
    • Revenue-sharing vs. Wholesale-price contracts in assembly systems with random demand
    • Gerchak, Y., and, Y. Wang. 2004. " Revenue-sharing Vs. Wholesale-price Contracts in Assembly Systems with Random Demand." Production and Operations Management 13 (1): 23-33. (Pubitemid 39374557)
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 23-33
    • Gerchak, Y.1    Wang, Y.2
  • 9
    • 79958241177 scopus 로고    scopus 로고
    • Managing inventory with two suppliers under yield uncertainty and risk aversion
    • Giri, B. C. 2011. " Managing Inventory with Two Suppliers under Yield Uncertainty and Risk Aversion." International Journal of Production Economics 133 (1): 80-85.
    • (2011) International Journal of Production Economics , vol.133 , Issue.1 , pp. 80-85
    • Giri, B.C.1
  • 10
    • 71849098045 scopus 로고    scopus 로고
    • Cost-effective ordering policies for inventory systems with emergency order
    • Giri, B. C., and, T. Dohi. 2009. " Cost-effective Ordering Policies for Inventory Systems with Emergency Order." Computers and Industrial Engineering 57 (4): 1336-1341.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.4 , pp. 1336-1341
    • Giri, B.C.1    Dohi, T.2
  • 11
    • 77955682916 scopus 로고    scopus 로고
    • Batch sizing with controllable production rates
    • Glock, C. H. 2010. " Batch Sizing with Controllable Production Rates." International Journal of Production Research 48 (20): 5925-5942.
    • (2010) International Journal of Production Research , vol.48 , Issue.20 , pp. 5925-5942
    • Glock, C.H.1
  • 12
    • 80052174893 scopus 로고    scopus 로고
    • Batch sizing with controllable production rates in a multi-stage production system
    • Glock, C. H. 2011. " Batch Sizing with Controllable Production Rates in a Multi-stage Production System." International Journal of Production Research 49 (20): 6017-6039.
    • (2011) International Journal of Production Research , vol.49 , Issue.20 , pp. 6017-6039
    • Glock, C.H.1
  • 13
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • Goyal, S. K. 1976. " An Integrated Inventory Model for a Single Supplier-single Customer Problem." International Journal of Production Research 15 (1): 107-111.
    • (1976) International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 14
    • 0009457668 scopus 로고
    • Determination of optimum production quantity for a two-stage production system
    • Goyal, S. K. 1977. " Determination of Optimum Production Quantity for a Two-stage Production System." Journal of the Operational Research Society 28 (4): 865-870.
    • (1977) Journal of the Operational Research Society , vol.28 , Issue.4 , pp. 865-870
    • Goyal, S.K.1
  • 15
    • 84985781712 scopus 로고
    • A joint economic lot size model for purchaser and vendor: A comment
    • Goyal, S. K. 1988. " A Joint Economic Lot Size Model for Purchaser and Vendor: a Comment." Decision Sciences 19 (1): 236-241.
    • (1988) Decision Sciences , vol.19 , Issue.1 , pp. 236-241
    • Goyal, S.K.1
  • 16
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: A comment
    • Goyal, S. K. 1995. " A One-vendor Multi-buyer Integrated Inventory Model: a Comment." European Journal of Operational Research 82 (1): 209-210.
    • (1995) European Journal of Operational Research , vol.82 , Issue.1 , pp. 209-210
    • Goyal, S.K.1
  • 17
    • 0347763702 scopus 로고    scopus 로고
    • A simple integrated production policy of an imperfect item for vendor and buyer
    • Goyal, S. K., C. Huang, and, K. Chen. 2003. " A Simple Integrated Production Policy of an Imperfect Item for Vendor and Buyer." Production Planning & Control 14 (7): 596-602.
    • (2003) Production Planning & Control , vol.14 , Issue.7 , pp. 596-602
    • Goyal, S.K.1    Huang, C.2    Chen, K.3
  • 18
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem
    • Hill, R. M. 1999. " The Optimal Production and Shipment Policy for the Single-vendor Single-buyer Integrated Production Inventory Problem." International Journal of Production Research 37 (11): 2463-2475.
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2463-2475
    • Hill, R.M.1
  • 19
    • 30844432190 scopus 로고    scopus 로고
    • Another look at the single-vendor single-buyer integrated production-inventory problem
    • DOI 10.1080/00207540500334285, PII N552703X028077
    • Hill, R. M., and, M. Omar. 2006. " Another Look at the Single-vendor Single-buyer Integrated Production-inventory Problem." International Journal of Production Research 44 (4): 791-800. (Pubitemid 43102618)
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 791-800
    • Hill, R.M.1    Omar, M.2
  • 20
    • 0036610166 scopus 로고    scopus 로고
    • An integrated vendor-buyer cooperative inventory model for items with imperfect quality
    • DOI 10.1080/09537280110112424
    • Huang, C. 2002. " An Integrated Vendor-buyer Cooperative Inventory Model for Items with Imperfect Quality." Production Planning & Control 13 (4): 355-361. (Pubitemid 34750722)
    • (2002) Production Planning and Control , vol.13 , Issue.4 , pp. 355-361
    • Huang, C.-K.1
  • 21
    • 70449595762 scopus 로고    scopus 로고
    • A note on "modelling an industrial strategy for inventory management in supply chains: The consignment stock case"
    • Huang, Q. Y., and, J. F. Chen. 2009. " A Note on "Modelling an Industrial Strategy for Inventory Management in Supply Chains: the Consignment Stock Case"." International Journal of Production Research 47 (22): 6469-6475.
    • (2009) International Journal of Production Research , vol.47 , Issue.22 , pp. 6469-6475
    • Huang, Q.Y.1    Chen, J.F.2
  • 22
    • 78650213260 scopus 로고    scopus 로고
    • An integrated inventory model involving manufacturing setup cost reduction in compound poisson process
    • Huang, C., T. L. Cheng, T. C. Kao, and, S. K. Goyal. 2011. " An Integrated Inventory Model Involving Manufacturing Setup Cost Reduction in Compound Poisson Process." International Journal of Production Research 49 (4): 1219-1228.
    • (2011) International Journal of Production Research , vol.49 , Issue.4 , pp. 1219-1228
    • Huang, C.1    Cheng, T.L.2    Kao, T.C.3    Goyal, S.K.4
  • 23
    • 0022028138 scopus 로고
    • Q, r inventory model with a mixture of lost sales and time-weighted backorders
    • Kim, D. H., and, K. S. Park. 1985. " (Q, r) Inventory Model with a Mixture of Lost Sales and Time-weighted Backorders." Journal of the Operational Research Society 36 (3): 231-238.
    • (1985) Journal of the Operational Research Society , vol.36 , Issue.3 , pp. 231-238
    • Kim, D.H.1    Park, K.S.2
  • 24
    • 57349175757 scopus 로고    scopus 로고
    • Managing level of consigned inventory with buyers warehouse capacity constraint
    • Lee, W., and, S. P. Wang. 2008. " Managing Level of Consigned Inventory with Buyers Warehouse Capacity Constraint." Production Planning and Control 19 (7): 677-685.
    • (2008) Production Planning and Control , vol.19 , Issue.7 , pp. 677-685
    • Lee, W.1    Wang, S.P.2
  • 25
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • Lu, L. 1995. " A One-vendor Multi-buyer Integrated Inventory Model." European Journal of Operational Research 81 (2): 312-323.
    • (1995) European Journal of Operational Research , vol.81 , Issue.2 , pp. 312-323
    • Lu, L.1
  • 26
    • 34247538584 scopus 로고    scopus 로고
    • How boeing and alcoa implemented a successful vendor managed inventory program
    • Micheau, V. A. 2005. " How Boeing and Alcoa Implemented a Successful Vendor Managed Inventory Program." The Journal of Business Forecasting 24 (1): 17-19. (Pubitemid 40639979)
    • (2005) Journal of business forecasting methods and systems , vol.24 , Issue.1 , pp. 17-19
    • Micheau, V.A.1
  • 27
    • 8644274862 scopus 로고    scopus 로고
    • A model for vending machine services in the soft drink industry
    • Ong, H. L., B. W. Ang, T. N. Goh, and, C. C. Deng. 1996. " A Model for Vending Machine Services in the Soft Drink Industry." Asia-Pacific Journal of Operational Research 13 (2): 209-224. (Pubitemid 126645531)
    • (1996) Asia-Pacific Journal of Operational Research , vol.13 , Issue.2 , pp. 209-224
    • Ong, H.L.1    Ang, B.W.2    Goh, T.N.3    Deng, C.C.4
  • 28
    • 0033285739 scopus 로고    scopus 로고
    • Lead time and ordering cost reductions in continuous review inventory systems with partial backorders
    • Ouyang, L. Y., C. K. Chen, and, H. C. Chang. 1999. " Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders." Journal of the Operational Research Society 50 (12): 1272-1279.
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.12 , pp. 1272-1279
    • Ouyang, L.Y.1    Chen, C.K.2    Chang, H.C.3
  • 29
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • DOI 10.1080/00207540110105680
    • Pan, J. C., and, J. S. Yang. 2002. " A Study of an Integrated Inventory with Controllable Lead Time." International Journal of Production Research 40 (5): 1263-1273. (Pubitemid 34593797)
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.-H.1    Yang, J.-S.2
  • 30
    • 30844445062 scopus 로고    scopus 로고
    • Consignment stock of inventories in the presence of obsolescence
    • DOI 10.1080/00207540500216631, PII L32685370003
    • Persona, A., A. Grassi, and, M. Catena. 2005. " Consignment Stock of Inventories in the Presence of Obsolescence." International Journal of Production Research 43 (23): 4969-4988. (Pubitemid 43102311)
    • (2005) International Journal of Production Research , vol.43 , Issue.23 , pp. 4969-4988
    • Persona, A.1    Grassi, A.2    Catena, M.3
  • 31
    • 0029341804 scopus 로고
    • Stochastic analysis of a continuous review perishable inventory system with positive lead time and poisson demand
    • Ravichandran, N. 1995. " Stochastic Analysis of a Continuous Review Perishable Inventory System with Positive Lead Time and Poisson Demand." European Journal of Operational Research 84 (2): 444-457.
    • (1995) European Journal of Operational Research , vol.84 , Issue.2 , pp. 444-457
    • Ravichandran, N.1
  • 32
    • 0031145351 scopus 로고    scopus 로고
    • Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
    • Sarker, B. R., and, E. R. Coates. 1997. " Manufacturing Setup Cost Reduction under Variable Lead times and Finite Opportunities for Investment." International Journal of Production Economics 49 (3): 237-247. (Pubitemid 127412311)
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 237-247
    • Sarker, B.R.1    Coates, E.R.2
  • 33
    • 77954311055 scopus 로고    scopus 로고
    • Efficiency on consignment
    • Turdsik, R. 2002. " Efficiency on Consignment." Progressive Grocer 81 (2): 29-31.
    • (2002) Progressive Grocer , vol.81 , Issue.2 , pp. 29-31
    • Turdsik, R.1
  • 34
    • 0037431674 scopus 로고    scopus 로고
    • The consignment stock of inventories: Industrial case and performance analysis
    • DOI 10.1016/S0925-5273(02)00300-6, PII S0925527302003006
    • Valentini, G., and, L. Zavanella. 2003. " The Consignment Stock of Inventories: Industrial Case and Performance Analysis." International Journal of Production Economics 81-82 (1): 215-224. (Pubitemid 35385360)
    • (2003) International Journal of Production Economics , vol.81-82 , pp. 215-224
    • Valentini, G.1    Zavanella, L.2
  • 35
    • 0346503081 scopus 로고    scopus 로고
    • An integrated single-vendor single-buyer inventory system with shortage derived algebraically
    • Wu, K., and, L. Ouyang. 2003. " An Integrated Single-vendor Single-buyer Inventory System with Shortage Derived Algebraically." Production Planning and Control 14 (6): 555-561.
    • (2003) Production Planning and Control , vol.14 , Issue.6 , pp. 555-561
    • Wu, K.1    Ouyang, L.2
  • 36
    • 13644278663 scopus 로고    scopus 로고
    • A note on an industrial strategy for stock management in supply chains: Modelling and performance evaluation
    • DOI 10.1080/0020754042000264581
    • Zanoni, S., and, R. W. Grubbstrom. 2004. " A Note on an Industrial Strategy for Stock Management in Supply Chains: Modelling and Performance Evaluation." International Journal of Production Research 42 (20): 4421-4426. (Pubitemid 40232128)
    • (2004) International Journal of Production Research , vol.42 , Issue.20 , pp. 4421-4426
    • Zanoni, S.1    Grubbstrom, R.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.