-
1
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
Banerjee, A. 1986. " A Joint Economic-lot-size Model for Purchaser and Vendor." Decision Sciences 17 (3): 292-311.
-
(1986)
Decision Sciences
, vol.17
, Issue.3
, pp. 292-311
-
-
Banerjee, A.1
-
2
-
-
4644312239
-
Integrated single vendor single buyer model with stochastic demand and variable lead time
-
Ben-Daya, M., and, M. Hariga. 2004. " Integrated Single Vendor Single Buyer Model with Stochastic Demand and Variable Lead Time." International Journal of Production Economics 92 (1): 75-80.
-
(2004)
International Journal of Production Economics
, vol.92
, Issue.1
, pp. 75-80
-
-
Ben-Daya, M.1
Hariga, M.2
-
3
-
-
0006963529
-
-
3rd ed. Upper Saddle River, NJ: Prentice Hall
-
Bolen, W. H. 1988. Contemporary Retailing. 3rd ed. Upper Saddle River, NJ: Prentice Hall.
-
(1988)
Contemporary Retailing
-
-
Bolen, W.H.1
-
4
-
-
0242301655
-
Modelling an industrial strategy for inventory management in supply chains: The consignment stock case
-
Braglia, M., and, L. Zavanella. 2003. " Modelling an Industrial Strategy for Inventory Management in Supply Chains: the Consignment Stock Case." International Journal of Production Research 41 (16): 3793-3808.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3793-3808
-
-
Braglia, M.1
Zavanella, L.2
-
5
-
-
80053573001
-
Joint determination of optimal safety stocks and production policy for an imperfect production system
-
Chakraborty, T., and, B. C. Giri. 2012. " Joint Determination of Optimal Safety Stocks and Production Policy for an Imperfect Production System." Applied Mathematical Modelling 36 (2): 712-722.
-
(2012)
Applied Mathematical Modelling
, vol.36
, Issue.2
, pp. 712-722
-
-
Chakraborty, T.1
Giri, B.C.2
-
6
-
-
77957709870
-
Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
-
Chen, Z. X., and, B. R. Sarker. 2010. " Multi-vendor Integrated Procurement-production System under Shared Transportation and Just-in-time Delivery System." Journal of the Operational Research Society 61 (11): 1654-1666.
-
(2010)
Journal of the Operational Research Society
, vol.61
, Issue.11
, pp. 1654-1666
-
-
Chen, Z.X.1
Sarker, B.R.2
-
7
-
-
0001029945
-
Heuristic policies for inventory ordering problems with long and randomly varying lead times
-
Foote, B., N. Kebriaei, and, H. Kumin. 1988. " Heuristic Policies for Inventory Ordering Problems with Long and Randomly Varying Lead times." Journal of Operations Management 7 (3-4): 115-124.
-
(1988)
Journal of Operations Management
, vol.7
, Issue.34
, pp. 115-124
-
-
Foote, B.1
Kebriaei, N.2
Kumin, H.3
-
8
-
-
5644241211
-
Revenue-sharing vs. Wholesale-price contracts in assembly systems with random demand
-
Gerchak, Y., and, Y. Wang. 2004. " Revenue-sharing Vs. Wholesale-price Contracts in Assembly Systems with Random Demand." Production and Operations Management 13 (1): 23-33. (Pubitemid 39374557)
-
(2004)
Production and Operations Management
, vol.13
, Issue.1
, pp. 23-33
-
-
Gerchak, Y.1
Wang, Y.2
-
9
-
-
79958241177
-
Managing inventory with two suppliers under yield uncertainty and risk aversion
-
Giri, B. C. 2011. " Managing Inventory with Two Suppliers under Yield Uncertainty and Risk Aversion." International Journal of Production Economics 133 (1): 80-85.
-
(2011)
International Journal of Production Economics
, vol.133
, Issue.1
, pp. 80-85
-
-
Giri, B.C.1
-
10
-
-
71849098045
-
Cost-effective ordering policies for inventory systems with emergency order
-
Giri, B. C., and, T. Dohi. 2009. " Cost-effective Ordering Policies for Inventory Systems with Emergency Order." Computers and Industrial Engineering 57 (4): 1336-1341.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.4
, pp. 1336-1341
-
-
Giri, B.C.1
Dohi, T.2
-
11
-
-
77955682916
-
Batch sizing with controllable production rates
-
Glock, C. H. 2010. " Batch Sizing with Controllable Production Rates." International Journal of Production Research 48 (20): 5925-5942.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.20
, pp. 5925-5942
-
-
Glock, C.H.1
-
12
-
-
80052174893
-
Batch sizing with controllable production rates in a multi-stage production system
-
Glock, C. H. 2011. " Batch Sizing with Controllable Production Rates in a Multi-stage Production System." International Journal of Production Research 49 (20): 6017-6039.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.20
, pp. 6017-6039
-
-
Glock, C.H.1
-
13
-
-
0017416997
-
An integrated inventory model for a single supplier-single customer problem
-
Goyal, S. K. 1976. " An Integrated Inventory Model for a Single Supplier-single Customer Problem." International Journal of Production Research 15 (1): 107-111.
-
(1976)
International Journal of Production Research
, vol.15
, Issue.1
, pp. 107-111
-
-
Goyal, S.K.1
-
14
-
-
0009457668
-
Determination of optimum production quantity for a two-stage production system
-
Goyal, S. K. 1977. " Determination of Optimum Production Quantity for a Two-stage Production System." Journal of the Operational Research Society 28 (4): 865-870.
-
(1977)
Journal of the Operational Research Society
, vol.28
, Issue.4
, pp. 865-870
-
-
Goyal, S.K.1
-
15
-
-
84985781712
-
A joint economic lot size model for purchaser and vendor: A comment
-
Goyal, S. K. 1988. " A Joint Economic Lot Size Model for Purchaser and Vendor: a Comment." Decision Sciences 19 (1): 236-241.
-
(1988)
Decision Sciences
, vol.19
, Issue.1
, pp. 236-241
-
-
Goyal, S.K.1
-
16
-
-
0001539415
-
A one-vendor multi-buyer integrated inventory model: A comment
-
Goyal, S. K. 1995. " A One-vendor Multi-buyer Integrated Inventory Model: a Comment." European Journal of Operational Research 82 (1): 209-210.
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.1
, pp. 209-210
-
-
Goyal, S.K.1
-
17
-
-
0347763702
-
A simple integrated production policy of an imperfect item for vendor and buyer
-
Goyal, S. K., C. Huang, and, K. Chen. 2003. " A Simple Integrated Production Policy of an Imperfect Item for Vendor and Buyer." Production Planning & Control 14 (7): 596-602.
-
(2003)
Production Planning & Control
, vol.14
, Issue.7
, pp. 596-602
-
-
Goyal, S.K.1
Huang, C.2
Chen, K.3
-
18
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem
-
Hill, R. M. 1999. " The Optimal Production and Shipment Policy for the Single-vendor Single-buyer Integrated Production Inventory Problem." International Journal of Production Research 37 (11): 2463-2475.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2463-2475
-
-
Hill, R.M.1
-
19
-
-
30844432190
-
Another look at the single-vendor single-buyer integrated production-inventory problem
-
DOI 10.1080/00207540500334285, PII N552703X028077
-
Hill, R. M., and, M. Omar. 2006. " Another Look at the Single-vendor Single-buyer Integrated Production-inventory Problem." International Journal of Production Research 44 (4): 791-800. (Pubitemid 43102618)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.4
, pp. 791-800
-
-
Hill, R.M.1
Omar, M.2
-
20
-
-
0036610166
-
An integrated vendor-buyer cooperative inventory model for items with imperfect quality
-
DOI 10.1080/09537280110112424
-
Huang, C. 2002. " An Integrated Vendor-buyer Cooperative Inventory Model for Items with Imperfect Quality." Production Planning & Control 13 (4): 355-361. (Pubitemid 34750722)
-
(2002)
Production Planning and Control
, vol.13
, Issue.4
, pp. 355-361
-
-
Huang, C.-K.1
-
21
-
-
70449595762
-
A note on "modelling an industrial strategy for inventory management in supply chains: The consignment stock case"
-
Huang, Q. Y., and, J. F. Chen. 2009. " A Note on "Modelling an Industrial Strategy for Inventory Management in Supply Chains: the Consignment Stock Case"." International Journal of Production Research 47 (22): 6469-6475.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.22
, pp. 6469-6475
-
-
Huang, Q.Y.1
Chen, J.F.2
-
22
-
-
78650213260
-
An integrated inventory model involving manufacturing setup cost reduction in compound poisson process
-
Huang, C., T. L. Cheng, T. C. Kao, and, S. K. Goyal. 2011. " An Integrated Inventory Model Involving Manufacturing Setup Cost Reduction in Compound Poisson Process." International Journal of Production Research 49 (4): 1219-1228.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.4
, pp. 1219-1228
-
-
Huang, C.1
Cheng, T.L.2
Kao, T.C.3
Goyal, S.K.4
-
23
-
-
0022028138
-
Q, r inventory model with a mixture of lost sales and time-weighted backorders
-
Kim, D. H., and, K. S. Park. 1985. " (Q, r) Inventory Model with a Mixture of Lost Sales and Time-weighted Backorders." Journal of the Operational Research Society 36 (3): 231-238.
-
(1985)
Journal of the Operational Research Society
, vol.36
, Issue.3
, pp. 231-238
-
-
Kim, D.H.1
Park, K.S.2
-
24
-
-
57349175757
-
Managing level of consigned inventory with buyers warehouse capacity constraint
-
Lee, W., and, S. P. Wang. 2008. " Managing Level of Consigned Inventory with Buyers Warehouse Capacity Constraint." Production Planning and Control 19 (7): 677-685.
-
(2008)
Production Planning and Control
, vol.19
, Issue.7
, pp. 677-685
-
-
Lee, W.1
Wang, S.P.2
-
25
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu, L. 1995. " A One-vendor Multi-buyer Integrated Inventory Model." European Journal of Operational Research 81 (2): 312-323.
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 312-323
-
-
Lu, L.1
-
26
-
-
34247538584
-
How boeing and alcoa implemented a successful vendor managed inventory program
-
Micheau, V. A. 2005. " How Boeing and Alcoa Implemented a Successful Vendor Managed Inventory Program." The Journal of Business Forecasting 24 (1): 17-19. (Pubitemid 40639979)
-
(2005)
Journal of business forecasting methods and systems
, vol.24
, Issue.1
, pp. 17-19
-
-
Micheau, V.A.1
-
27
-
-
8644274862
-
A model for vending machine services in the soft drink industry
-
Ong, H. L., B. W. Ang, T. N. Goh, and, C. C. Deng. 1996. " A Model for Vending Machine Services in the Soft Drink Industry." Asia-Pacific Journal of Operational Research 13 (2): 209-224. (Pubitemid 126645531)
-
(1996)
Asia-Pacific Journal of Operational Research
, vol.13
, Issue.2
, pp. 209-224
-
-
Ong, H.L.1
Ang, B.W.2
Goh, T.N.3
Deng, C.C.4
-
28
-
-
0033285739
-
Lead time and ordering cost reductions in continuous review inventory systems with partial backorders
-
Ouyang, L. Y., C. K. Chen, and, H. C. Chang. 1999. " Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders." Journal of the Operational Research Society 50 (12): 1272-1279.
-
(1999)
Journal of the Operational Research Society
, vol.50
, Issue.12
, pp. 1272-1279
-
-
Ouyang, L.Y.1
Chen, C.K.2
Chang, H.C.3
-
29
-
-
0037139670
-
A study of an integrated inventory with controllable lead time
-
DOI 10.1080/00207540110105680
-
Pan, J. C., and, J. S. Yang. 2002. " A Study of an Integrated Inventory with Controllable Lead Time." International Journal of Production Research 40 (5): 1263-1273. (Pubitemid 34593797)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1263-1273
-
-
Pan, J.C.-H.1
Yang, J.-S.2
-
30
-
-
30844445062
-
Consignment stock of inventories in the presence of obsolescence
-
DOI 10.1080/00207540500216631, PII L32685370003
-
Persona, A., A. Grassi, and, M. Catena. 2005. " Consignment Stock of Inventories in the Presence of Obsolescence." International Journal of Production Research 43 (23): 4969-4988. (Pubitemid 43102311)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.23
, pp. 4969-4988
-
-
Persona, A.1
Grassi, A.2
Catena, M.3
-
31
-
-
0029341804
-
Stochastic analysis of a continuous review perishable inventory system with positive lead time and poisson demand
-
Ravichandran, N. 1995. " Stochastic Analysis of a Continuous Review Perishable Inventory System with Positive Lead Time and Poisson Demand." European Journal of Operational Research 84 (2): 444-457.
-
(1995)
European Journal of Operational Research
, vol.84
, Issue.2
, pp. 444-457
-
-
Ravichandran, N.1
-
32
-
-
0031145351
-
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
-
Sarker, B. R., and, E. R. Coates. 1997. " Manufacturing Setup Cost Reduction under Variable Lead times and Finite Opportunities for Investment." International Journal of Production Economics 49 (3): 237-247. (Pubitemid 127412311)
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.3
, pp. 237-247
-
-
Sarker, B.R.1
Coates, E.R.2
-
33
-
-
77954311055
-
Efficiency on consignment
-
Turdsik, R. 2002. " Efficiency on Consignment." Progressive Grocer 81 (2): 29-31.
-
(2002)
Progressive Grocer
, vol.81
, Issue.2
, pp. 29-31
-
-
Turdsik, R.1
-
34
-
-
0037431674
-
The consignment stock of inventories: Industrial case and performance analysis
-
DOI 10.1016/S0925-5273(02)00300-6, PII S0925527302003006
-
Valentini, G., and, L. Zavanella. 2003. " The Consignment Stock of Inventories: Industrial Case and Performance Analysis." International Journal of Production Economics 81-82 (1): 215-224. (Pubitemid 35385360)
-
(2003)
International Journal of Production Economics
, vol.81-82
, pp. 215-224
-
-
Valentini, G.1
Zavanella, L.2
-
35
-
-
0346503081
-
An integrated single-vendor single-buyer inventory system with shortage derived algebraically
-
Wu, K., and, L. Ouyang. 2003. " An Integrated Single-vendor Single-buyer Inventory System with Shortage Derived Algebraically." Production Planning and Control 14 (6): 555-561.
-
(2003)
Production Planning and Control
, vol.14
, Issue.6
, pp. 555-561
-
-
Wu, K.1
Ouyang, L.2
-
36
-
-
13644278663
-
A note on an industrial strategy for stock management in supply chains: Modelling and performance evaluation
-
DOI 10.1080/0020754042000264581
-
Zanoni, S., and, R. W. Grubbstrom. 2004. " A Note on an Industrial Strategy for Stock Management in Supply Chains: Modelling and Performance Evaluation." International Journal of Production Research 42 (20): 4421-4426. (Pubitemid 40232128)
-
(2004)
International Journal of Production Research
, vol.42
, Issue.20
, pp. 4421-4426
-
-
Zanoni, S.1
Grubbstrom, R.W.2
|