Mixed integer programming of security-constrained daily hydrothermal generation scheduling (SCDHGS)

Author keywords

Daily Hydrothermal Generation Scheduling (DHGS); Dynamic ramp rate; Prohibited operating Zones; Security Constrained Unit Commitment (SCUC); Tighter approximated milp formulation; Valve point loadings

Indexed keywords

COST FUNCTIONS; ELECTRIC UTILITIES; SCHEDULING;

EID: 84885353378     PISSN: 10263098     EISSN: 23453605     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (17)

References (37)
  • 2
    • 0031270315 scopus 로고    scopus 로고
    • An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints
    • Guan, X., Ni, E., Li, R. and Lull, P. B. "An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints", IEEE Transactions on Power Systems, 12, pp. 1775-1780 (1997).
    • (1997) IEEE Transactions on Power Systems , vol.12 , pp. 1775-1780
    • Guan, X.1    Ni, E.2    Li, R.3    Lull, P.B.4
  • 3
    • 0024719920 scopus 로고
    • Short term hydrothermal coordination using multi-pass dynamic programming
    • Yang, J. S. and Chen, N. "Short term hydrothermal coordination using multi-pass dynamic programming", IEEE Transactions on Power Systems, 4, pp. 1050-1056 (1989).
    • (1989) IEEE Transactions on Power Systems , vol.4 , pp. 1050-1056
    • Yang, J.S.1    Chen, N.2
  • 4
    • 82555193427 scopus 로고    scopus 로고
    • A novel mixed-integer linear algorithm to generate unit commitment and dispatching scenarios for reliability test grids
    • Giuntoli, M. and Poli, D. "A novel mixed-integer linear algorithm to generate unit commitment and dispatching scenarios for reliability test grids", International Review Electrical Engineering (IREE), 6(4), pp. 1971-1983 (2011).
    • (2011) International Review Electrical Engineering (IREE) , vol.6 , Issue.4 , pp. 1971-1983
    • Giuntoli, M.1    Poli, D.2
  • 5
    • 34548027768 scopus 로고    scopus 로고
    • Hydrothermal scheduling using benders decomposition: Accelerating techniques
    • Sifuentes, W. S. and Vargas, A. "Hydrothermal scheduling using benders decomposition: accelerating techniques", IEEE Transactions on Power Systems, 22, pp. 1351-1359 (2007).
    • (2007) IEEE Transactions on Power Systems , vol.22 , pp. 1351-1359
    • Sifuentes, W.S.1    Vargas, A.2
  • 6
    • 79955579888 scopus 로고    scopus 로고
    • A modified genetic approach to hydrothermal system with thyristor controlled phase shifter under open market system
    • Srinivasa Rao, C. et al. "A modified genetic approach to hydrothermal system with thyristor controlled phase shifter under open market system", International Review Electrical Engineering (IR. EE), 2(1), pp. 507-514 (2007).
    • (2007) International Review Electrical Engineering (IR. EE) , vol.2 , Issue.1 , pp. 507-514
    • Srinivasa Rao, C.1
  • 7
    • 84855757993 scopus 로고    scopus 로고
    • Cascade hydro power plants optimization with honey bee mating optimization algorithm
    • Gavrilas, M. and Stahie, V. "Cascade hydro power plants optimization with honey bee mating optimization algorithm", International Review Electrical Engineering (IREE), 6(5), pp. 307-314 (2011).
    • (2011) International Review Electrical Engineering (IREE) , vol.6 , Issue.5 , pp. 307-314
    • Gavrilas, M.1    Stahie, V.2
  • 10
    • 33646379100 scopus 로고    scopus 로고
    • AC contingency dispatch based on security-constrained unit commitment
    • Fu, Y., Shahidehpour, M. and Li, Z. "AC contingency dispatch based on security-constrained unit commitment", IEEE Transactions on Power Systems, 21(2), pp. 897-908 (2006).
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.2 , pp. 897-908
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 11
    • 24944563890 scopus 로고    scopus 로고
    • Securityconstrained unit commitment with AC constraints
    • Fu, Y., Shahidehpour, M. and Li, Z. "Securityconstrained unit commitment with AC constraints", IEEE Transactions on Power Systems, 20(3), pp. 1538-1550 (2005).
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1538-1550
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 12
    • 0034244118 scopus 로고    scopus 로고
    • Optimal response of a thermal unit to an electricity spot market
    • Arroyo, J. M. and Conejo, A. J. "Optimal response of a thermal unit to an electricity spot market", IEEE Transactions on Power Systems, 15(3), pp. 1098-1104 (2000).
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.3 , pp. 1098-1104
    • Arroyo, J.M.1    Conejo, A.J.2
  • 13
    • 0036577590 scopus 로고    scopus 로고
    • Optimal response of an oligopolistic generating company to a competitive pool-based electric power market
    • Conejo, A. J., Contreras, J., Arroyo, J. M. and de la Torre, S. "Optimal response of an oligopolistic generating company to a competitive pool-based electric power market", IEEE Transactions on Power Systems, 17(2), pp. 424-430 (2002).
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.2 , pp. 424-430
    • Conejo, A.J.1    Contreras, J.2    Arroyo, J.M.3    De La Torre, S.4
  • 14
    • 0036872146 scopus 로고    scopus 로고
    • Self-scheduling of a hydro producer in a pool-based electricity market
    • Conejo, A. J., Contreras, J. and Villamor, F. A. "Self-scheduling of a hydro producer in a pool-based electricity market", IEEE Transactions on Power Systems, 17(4), pp. 1265-1272 (2002).
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.4 , pp. 1265-1272
    • Conejo, A.J.1    Contreras, J.2    Villamor, F.A.3
  • 15
    • 44649137231 scopus 로고    scopus 로고
    • Short-term scheduling with cascaded and head-dependent reservoirs based on mixed, integer linear programming
    • Porto, Portugal, September
    • Gonzalez, J. G. and Castro, G. A. "Short-term scheduling with cascaded and head-dependent reservoirs based on mixed, integer linear programming", IEEE Power Tech'01 Conference, Porto, Portugal, September (2001).
    • (2001) IEEE Power Tech'01 Conference
    • Gonzalez, J.G.1    Castro, G.A.2
  • 16
    • 0028480021 scopus 로고
    • Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
    • Wang, C. and Shahidehpour, M. "Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect", IEEE Transactions on Power Systems, 9(3), pp. 1539-1545 (1994).
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.3 , pp. 1539-1545
    • Wang, C.1    Shahidehpour, M.2
  • 19
    • 36348988575 scopus 로고    scopus 로고
    • Fast SCUC for largescale power systems
    • Fu, Y. and Shahidehpour, M. "Fast SCUC for largescale power systems", IEEE Transactions on Power Systems, 22(4), pp. 2144-2151 (2007).
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2144-2151
    • Fu, Y.1    Shahidehpour, M.2
  • 20
    • 0030283341 scopus 로고    scopus 로고
    • Economic dispatch of generators with prohibited operating zones: A genetic algorithm approach
    • Orero, S. O. and Irving, M. R. "Economic dispatch of generators with prohibited operating zones: A genetic algorithm approach", Proc. Inst. Elect. Eng., Gen., Transm., Distrib., 143(6), pp. 529-534 (1996).
    • (1996) Proc. Inst. Elect. Eng., Gen., Transm., Distrib. , vol.143 , Issue.6 , pp. 529-534
    • Orero, S.O.1    Irving, M.R.2
  • 22
    • 2042536680 scopus 로고    scopus 로고
    • Hybrid PSO-SQP for dynamic economic dispatch with valve-point effect
    • Victoire, T., Jeyakumar, A. "Hybrid PSO-SQP for dynamic economic dispatch with valve-point effect", Electr Power Syst Res 2001, 71(1), pp. 51-9 (2004).
    • (2004) Electr Power Syst Res 2001 , vol.71 , Issue.1 , pp. 51-59
    • Victoire, T.1    Jeyakumar, A.2
  • 23
    • 0027646347 scopus 로고
    • Genetic algorithm solution of economic dispatch with valve point loading
    • Walters, D. C. and Sheble, G. B. "Genetic algorithm solution of economic dispatch with valve point loading", IEEE Transactions on Power Systems, 8(3), pp. 1325-1332 (1993).
    • (1993) IEEE Transactions on Power Systems , vol.8 , Issue.3 , pp. 1325-1332
    • Walters, D.C.1    Sheble, G.B.2
  • 24
    • 33947321134 scopus 로고    scopus 로고
    • A new particle swarm optimization solution to non-convex economic dispatch problems
    • Selvakumar, A. I. and Thanushkodi, K. "A new particle swarm optimization solution to non-convex economic dispatch problems", IEEE Transactions on Power Systems, 22(1), pp. 42-51 (2007).
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.1 , pp. 42-51
    • Selvakumar, A.I.1    Thanushkodi, K.2
  • 25
    • 68349155820 scopus 로고    scopus 로고
    • Non-convex economic dispatch with AC constraints by a new real coded genetic algorithm
    • Amjady, N. and Rad, H. N. "Non-convex economic dispatch with AC constraints by a new real coded genetic algorithm", IEEE Transactions on Power Systems, 24(3), pp. 1489-1502 (2009).
    • (2009) IEEE Transactions on Power Systems , vol.24 , Issue.3 , pp. 1489-1502
    • Amjady, N.1    Rad, H.N.2
  • 27
    • 0034244118 scopus 로고    scopus 로고
    • Optimal response of a thermal unit to an electricity spot market
    • Arroyo, J. M. and Conejo, A. J. "Optimal response of a thermal unit to an electricity spot market", IEEE Transactions on Power Systems, 15(3), pp. 1098-1104 (2000).
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.3 , pp. 1098-1104
    • Arroyo, J.M.1    Conejo, A.J.2
  • 28
    • 28244479344 scopus 로고    scopus 로고
    • Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming
    • Li, T. and Shahidehpour, M. "Price-based unit commitment: a case of Lagrangian relaxation versus mixed integer programming", IEEE Transactions on Power Systems, 20(4), pp. 2015-2025 (2005).
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 29
    • 18944367302 scopus 로고    scopus 로고
    • Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets
    • Li, Z. and Shahidehpour, M. "Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets", IEEE Transactions on Power Systems, 20(2), pp. 1079-1088 (2005).
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 1079-1088
    • Li, Z.1    Shahidehpour, M.2
  • 30
    • 44649156381 scopus 로고    scopus 로고
    • Hydrothermal self-scheduling problem in a day-ahead electricity market
    • Bisanovic, S., Hajro, M. and Dlakic, M. "Hydrothermal self-scheduling problem in a day-ahead electricity market", Electric Power System Research, 78(9), pp. 1579-1596 (2008).
    • (2008) Electric Power System Research , vol.78 , Issue.9 , pp. 1579-1596
    • Bisanovic, S.1    Hajro, M.2    Dlakic, M.3
  • 31
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • Wu, L., Shahidehpour, M. and Li, T. "Stochastic security-constrained unit commitment", IEEE Transactions on Power Systems, 22(2), pp. 800-811 (2007).
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 32
    • 34548029408 scopus 로고    scopus 로고
    • Risk-constrained generation asset arbitrage in power systems
    • Li, T. and Shahidehpour, M. "Risk-constrained generation asset arbitrage in power systems", IEEE Transactions on Power Systems, 22(3), pp. 1330-1339 (2007).
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1330-1339
    • Li, T.1    Shahidehpour, M.2
  • 33
    • 84861908237 scopus 로고    scopus 로고
    • Mixed integer programming of multi objective hydro-thermal self scheduling
    • Ahmadi, A., Aghaei, J., Shayanfar, H. A. and Rabiee, A. "Mixed integer programming of multi objective hydro-thermal self scheduling", Applied Soft Computing, 12, pp. 2137-2146 (2012).
    • (2012) Applied Soft Computing , vol.12 , pp. 2137-2146
    • Ahmadi, A.1    Aghaei, J.2    Shayanfar, H.A.3    Rabiee, A.4
  • 35
    • 84928326681 scopus 로고    scopus 로고
    • [Online]. Available: http://motor.ece.iit.edu/data/SCUC-118test.xls
  • 36
    • 84928326101 scopus 로고    scopus 로고
    • [Online]. Available: http://motor.ece.iit.edu/data/118-nonsmooth.xls
  • 37
    • 0003730982 scopus 로고
    • Redwood City, CA: The Scientific Press
    • Brooke, A., Kendrick, D. and Meeraus, A., GAMS: A User's Guide. Redwood City, CA: The Scientific Press, 1990. [Online]. Available: http://www.gams.com/docs/document.htm.
    • (1990) GAMS: A User's Guide
    • Brooke, A.1    Kendrick, D.2    Meeraus, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.