메뉴 건너뛰기




Volumn 3, Issue PARTS A AND B, 2012, Pages 99-109

Representation: Structural complexity of assemblies to create neural network based assembly time estimation models

Author keywords

Artificial neural networks; Dfa; Graphs

Indexed keywords

COMPUTER AIDED DESIGN; INPUT OUTPUT PROGRAMS; POPULATION STATISTICS;

EID: 84884665842     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC2012-71337     Document Type: Conference Paper
Times cited : (10)

References (26)
  • 3
    • 79960497976 scopus 로고    scopus 로고
    • A comparison of mtm and rtm
    • C.K. Choi and W.H. Ip, "A Comparison of MTM and RTM, " Work Study, vol. 48, no. 2, pp. 57-61, 1999.
    • (1999) Work Study , vol.48 , Issue.2 , pp. 57-61
    • Choi, C.K.1    Ip, W.H.2
  • 5
    • 0032267341 scopus 로고    scopus 로고
    • Product evolution: A reverse engineering and redesign methodology
    • Kevin N. Otto and Kristin L. Wood, "Product Evolution: A Reverse Engineering and Redesign Methodology, " Research in Engineering Design, vol. 10, pp. 226-243, 1998.
    • (1998) Research in Engineering Design , vol.10 , pp. 226-243
    • Otto, K.N.1    Wood, K.L.2
  • 7
    • 0037431955 scopus 로고    scopus 로고
    • Activity-based cost management for design and development stage
    • David Ben-Arieh and Li Qian, "Activity-based Cost Management for Design and Development Stage, " International Journal of Production Economics, no. 83, pp. 169-183, 2003.
    • (2003) International Journal of Production Economics , Issue.83 , pp. 169-183
    • Ben-Arieh, D.1    Qian, L.2
  • 8
    • 0033354365 scopus 로고    scopus 로고
    • Cost estimation during design step: Parametric method versus case based reasoning method
    • P. Duverlie and J.M. Castelain, "Cost Estimation During Design Step: Parametric Method Versus Case based Reasoning Method, " International Journal of Advanced Manufacturing Technology, no. 15, pp. 895-906, 1999.
    • (1999) International Journal of Advanced Manufacturing Technology , Issue.15 , pp. 895-906
    • Duverlie, P.1    Castelain, J.M.2
  • 9
    • 0033416614 scopus 로고    scopus 로고
    • A pragmatic approach to product costing based on standard time estimation
    • Jianxin Jiao and Mitchell M. Tseng, "A Pragmatic Approach to Product Costing Based on Standard Time Estimation, " International Journal of Operations and Production Management, vol. 19, no. 7, pp. 738-755, 1999.
    • (1999) International Journal of Operations and Production Management , vol.19 , Issue.7 , pp. 738-755
    • Jiao, J.1    Tseng, M.M.2
  • 12
    • 34547626244 scopus 로고    scopus 로고
    • Set-up time reduction process and integrated predetermined time system mtm-uas: A study of application in a large size company of automobile industry
    • Mehmet Cakmakci and Mahmut Kemal Karasu, "Set-up Time Reduction Process and Integrated Predetermined Time System MTM-UAS: A Study of Application in a Large Size Company of Automobile Industry, " International Journal of Manufacturing Technology, vol. 33, pp. 334-344, 2007.
    • (2007) International Journal of Manufacturing Technology , vol.33 , pp. 334-344
    • Cakmakci, M.1    Karasu, M.K.2
  • 16
    • 85196986007 scopus 로고    scopus 로고
    • Database support for reverse engineering, product teardown, and redesign as integrated into a mechanical engineering course
    • M Snider, J. Summers, S. Teegavarapu, and Mocko G., "Database Support for Reverse Engineering, Product Teardown, and Redesign as Integrated into a Mechanical Engineering Course, " ASEE Computers in Education Journal, 2007.
    • (2007) ASEE Computers in Education Journal
    • Mocko, G.1    Snider, M.2    Summers, J.3    Teegavarapu, S.4
  • 17
    • 77951827256 scopus 로고    scopus 로고
    • A cad system for extraction of mating features in an assembly
    • Arun Mathew and C.S.P. Rao, "A CAD System for Extraction of Mating Features in an Assembly, " Assembly Automation, vol. 30, no. 2, pp. 142-146, 2010.
    • (2010) Assembly Automation , vol.30 , Issue.2 , pp. 142-146
    • Mathew, A.1    Rao, C.S.P.2
  • 20
    • 0030297904 scopus 로고    scopus 로고
    • Advantages and disadvantages of using artificial neural networks versus logistic regression for predicting medical outcomes
    • Jack V. Tu, "Advantages and Disadvantages of Using Artificial Neural Networks versus Logistic Regression for Predicting Medical Outcomes, " Journal of Clinical Epidemiol, vol. 49, no. 11, pp. 1225-1231, 1996.
    • (1996) Journal of Clinical Epidemiol , vol.49 , Issue.11 , pp. 1225-1231
    • Tu, J.V.1
  • 22
    • 0004393134 scopus 로고
    • Connectionist approach to time series prediction: An empirical test
    • Ramesh Sharda and Rejendra B. Patil, "Connectionist Approach to Time Series Prediction: An Empirical Test, " Journal of Intelligent Manufacturing, vol. 3, pp. 317-323, 1992.
    • (1992) Journal of Intelligent Manufacturing , vol.3 , pp. 317-323
    • Sharda, R.1    Patil, R.B.2
  • 23
    • 0032670062 scopus 로고    scopus 로고
    • Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis
    • Avraham Shtub and Ronen Versano, "Estimating the Cost of Steel Pipe Bending, a Comparison Between Neural Networks and Regression Analysis, " International Journal of Production Economics, vol. 62, pp. 201-207, 1999.
    • (1999) International Journal of Production Economics , vol.62 , pp. 201-207
    • Shtub, A.1    Versano, R.2
  • 24
    • 0030111205 scopus 로고    scopus 로고
    • A comparison of artificial neural network and time series models for forecasting commodity prices
    • Nowrouz Kohzadi, Milton S. Boyd, Bahman Kermanshahi, and Iebeling Kaastra, "A Comparison of Artificial Neural Network and Time Series Models for Forecasting Commodity Prices, " Neurocomputing, vol. 10, pp. 169-181, 1996.
    • (1996) Neurocomputing , vol.10 , pp. 169-181
    • Kohzadi, N.1    Boyd, M.S.2    Kermanshahi, B.3    Kaastra, I.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.