-
1
-
-
84884548877
-
Report to NIST: Visibility Measurement of a Forklift
-
Solicitation Number SB1341-12-RQ-0222 (August).
-
Agronin, M., Albanese, D., 2012. Report to NIST: Visibility Measurement of a Forklift, Solicitation Number SB1341-12-RQ-0222 (August).
-
(2012)
-
-
Agronin, M.1
Albanese, D.2
-
2
-
-
84884535769
-
-
ANSI/ITSDF B56.11.6-2005, Evaluation of Visibility from Powered Industrial Trucks.
-
ANSI/ITSDF B56.11.6-2005, 2005. Evaluation of Visibility from Powered Industrial Trucks.
-
(2005)
-
-
-
3
-
-
84884542759
-
-
ANSI/ITSDF B56.5-2012, Safety Standard for Driverless, Automatic Guided Industrial Vehicles and Automated Functions of Manned Industrial Vehicles.
-
ANSI/ITSDF B56.5-2012, 2012. Safety Standard for Driverless, Automatic Guided Industrial Vehicles and Automated Functions of Manned Industrial Vehicles.
-
(2012)
-
-
-
4
-
-
84884544745
-
Fork Lift Awareness, Presentation by Occupational Safety and Health Administration
-
Baltimore/Washington Office, 2009 Performance Metrics for Intelligent Systems Workshop (PerMIS '09), NIST Special Session, September
-
Austin, M., 2009. Fork Lift Awareness, Presentation by Occupational Safety and Health Administration, Baltimore/Washington Office, 2009 Performance Metrics for Intelligent Systems Workshop (PerMIS '09), NIST Special Session, September 2009.
-
(2009)
-
-
Austin, M.1
-
5
-
-
84884366579
-
Measurement and Evaluation of Visibility Experiments for Powered Industrial Vehicles
-
Report #7837
-
Bostelman, R., Liang, Li P., 2011. Measurement and Evaluation of Visibility Experiments for Powered Industrial Vehicles, NIST Internal, Report #7837.
-
(2011)
NIST Internal
-
-
Bostelman, R.1
Liang Li, P.2
-
6
-
-
84884366579
-
Measurement and Evaluation of Visibility Experiments for Powered Industrial Vehicles
-
NIST Interagency/Internal Report (NISTIR) - 7837 (December).
-
Bostelman, R., Lang, Li P., 2011. Measurement and Evaluation of Visibility Experiments for Powered Industrial Vehicles, National Institute of Standards and Technology, NIST Interagency/Internal Report (NISTIR) - 7837 (December).
-
(2011)
National Institute of Standards and Technology
-
-
Bostelman, R.1
Lang Li, P.2
-
8
-
-
84884544105
-
-
White Paper: Towards Improved Forklift Safety, Pro. 2009 Performance Metrics for Intelligent Systems Workshop (PerMIS), NIST Special, Publication 1112 (September).
-
Bostelman, R., 2009. White Paper: Towards Improved Forklift Safety, Pro. 2009 Performance Metrics for Intelligent Systems Workshop (PerMIS), NIST Special, Publication 1112 (September).
-
(2009)
-
-
Bostelman, R.1
-
9
-
-
84898994203
-
Modeling tower crane operator visibility to minimize the risk of limited situational awareness
-
Cheng T., Teizer J. Modeling tower crane operator visibility to minimize the risk of limited situational awareness. ASCE Journal of Computing in Civil Engineering 2013, 10.1061/(ASCE)CP.1943-5487.0000282.
-
(2013)
ASCE Journal of Computing in Civil Engineering
-
-
Cheng, T.1
Teizer, J.2
-
10
-
-
84878579790
-
Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
-
Cheng T., Teizer J. Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Automation in Construction 2013, 23:3-15.
-
(2013)
Automation in Construction
, vol.23
, pp. 3-15
-
-
Cheng, T.1
Teizer, J.2
-
11
-
-
84876158201
-
Data fusion of real-time location sensing (RTLS) and physiological status monitoring (PSM) for ergonomics analysis of construction workers
-
Cheng T., Migliaccio G.C., Teizer J., Gatti U.C. Data fusion of real-time location sensing (RTLS) and physiological status monitoring (PSM) for ergonomics analysis of construction workers. ASCE Journal of Computing in Civil Engineering 2013, 10.1061/(ASCE)CP.1943-5487.0000222.
-
(2013)
ASCE Journal of Computing in Civil Engineering
-
-
Cheng, T.1
Migliaccio, G.C.2
Teizer, J.3
Gatti, U.C.4
-
12
-
-
84884573095
-
-
Direct Dimensions, Inc., Cockpit Simulation. (accessed 11.07.12).
-
Direct Dimensions, Inc., 2012. Cockpit Simulation. (accessed 11.07.12). http://www.directdimensions.com/port_projects.htm.
-
(2012)
-
-
-
13
-
-
84884565659
-
-
Eyetracking, (accessed 20.08.13).
-
Eyetracking, 2013. (accessed 20.08.13). http://www.smarteye.se.
-
(2013)
-
-
-
14
-
-
58949102918
-
Fast automatic registration of range image from 3D imaging systems using sphere targets
-
Franaszek C., Cheok G., Witzgall C. Fast automatic registration of range image from 3D imaging systems using sphere targets. Automation in Construction 2009, 18:265-274.
-
(2009)
Automation in Construction
, vol.18
, pp. 265-274
-
-
Franaszek, C.1
Cheok, G.2
Witzgall, C.3
-
15
-
-
77956319746
-
Construction Vehicle and Equipment Blind Area Diagrams
-
Report No. 200-2002-00563. (accessed 11.05.08).
-
Hefner, R., 2004. Construction Vehicle and Equipment Blind Area Diagrams. National Institute for Occupational Safety and Health, Report No. 200-2002-00563. (accessed 11.05.08). http://origin.cdc.gov/niosh/topics/highwayworkzones/BAD/pdfs/catreport2.pdf.
-
(2004)
National Institute for Occupational Safety and Health
-
-
Hefner, R.1
-
16
-
-
79952186241
-
Visibility-related fatalities related to construction equipment
-
Hinze J.W., Teizer J. Visibility-related fatalities related to construction equipment. Journal of Safety Science 2011, 49(5):709-718.
-
(2011)
Journal of Safety Science
, vol.49
, Issue.5
, pp. 709-718
-
-
Hinze, J.W.1
Teizer, J.2
-
17
-
-
84884585207
-
-
ISO/FDIS 13564-1-2012, 2012. (Final Draft International Standard) Powered Industrial Trucks - Test Methods for Verification of Visibility - Part 1: Sit-on and Stand-on Operator Trucks Up to and Including 10 t Capacity.
-
ISO/FDIS 13564-1-2012, 2012. (Final Draft International Standard) Powered Industrial Trucks - Test Methods for Verification of Visibility - Part 1: Sit-on and Stand-on Operator Trucks Up to and Including 10 t Capacity.
-
-
-
-
18
-
-
84867523667
-
Safety first: real-time proactive equipment operator and ground worker warning and alert system in steel manufacturing
-
Marks E., Teizer J. Safety first: real-time proactive equipment operator and ground worker warning and alert system in steel manufacturing. Iron & Steel Technology, AIST 2012, 9(10):56-69.
-
(2012)
Iron & Steel Technology, AIST
, vol.9
, Issue.10
, pp. 56-69
-
-
Marks, E.1
Teizer, J.2
-
19
-
-
84880307639
-
Laser scanning for safe equipment design that increases operator visibility by measuring blind spots
-
Marks, E., Cheng, T., Teizer, J., 2013. Laser scanning for safe equipment design that increases operator visibility by measuring blind spots. ASCE Journal of Construction Engineering and Management. doi:10.1061/(ASCE)CO.1943-7862.0000690.
-
(2013)
ASCE Journal of Construction Engineering and Management
-
-
Marks, E.1
Cheng, T.2
Teizer, J.3
-
20
-
-
84884578428
-
-
NIOSH, Construction Equipment Visibility - Manual Method. (accessed 20.07.12).
-
NIOSH, 2012. Highway Work Zone Safety, Construction Equipment Visibility - Manual Method. (accessed 20.07.12). http://www.cdc.gov/niosh/topics/highwayworkzones/BAD/manualmethod.html.
-
(2012)
Highway Work Zone Safety
-
-
-
21
-
-
84884555324
-
-
NIOSH, Highway Work Zone Safety, Construction Equipment Visibility - Computer Simulation. (accessed 20.07.12).
-
NIOSH, 2012. Highway Work Zone Safety, Construction Equipment Visibility - Computer Simulation. (accessed 20.07.12). http://www.cdc.gov/niosh/topics/highwayworkzones/BAD/compsim.html.
-
(2012)
-
-
-
22
-
-
9244220483
-
-
Department of Health and Human Services, CDC, NIOSH, pp. 5-6
-
Pratt S.G., Fosbroke D.E., Marsh S.M., Pratt S.G., Fosbroke D.E., Marsh S.M. Building Safer Highway Work Zones: Measures to Prevent Worker Injuries from Vehicles and Equipment 2001, Department of Health and Human Services, CDC, NIOSH, pp. 5-6.
-
(2001)
Building Safer Highway Work Zones: Measures to Prevent Worker Injuries from Vehicles and Equipment
-
-
Pratt, S.G.1
Fosbroke, D.E.2
Marsh, S.M.3
Pratt, S.G.4
Fosbroke, D.E.5
Marsh, S.M.6
-
23
-
-
83555173546
-
Coarse head pose estimation of construction equipment operators to formulate dynamic blind spots
-
Ray S.J., Teizer J. Coarse head pose estimation of construction equipment operators to formulate dynamic blind spots. Advanced Engineering Informatics 2012, 26(1):117-130.
-
(2012)
Advanced Engineering Informatics
, vol.26
, Issue.1
, pp. 117-130
-
-
Ray, S.J.1
Teizer, J.2
-
24
-
-
84859624462
-
Real-time construction worker posture analysis for ergonomics training
-
Ray S.J., Teizer J. Real-time construction worker posture analysis for ergonomics training. Advanced Engineering Informatics 2012, 26:439-455.
-
(2012)
Advanced Engineering Informatics
, vol.26
, pp. 439-455
-
-
Ray, S.J.1
Teizer, J.2
-
25
-
-
84884394354
-
Computing blind spots of construction equipment: implementation and evaluation of an automated measurement and visualization method
-
Ray, S.J., Teizer, J., 2013. Computing blind spots of construction equipment: implementation and evaluation of an automated measurement and visualization method. Automation in Construction (in press).
-
(2013)
Automation in Construction (in press).
-
-
Ray, S.J.1
Teizer, J.2
-
27
-
-
77955716869
-
Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
-
Teizer J., Allread B.S., Fullerton C.E., Hinze J. Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction 2010, 19(5):630-640.
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 630-640
-
-
Teizer, J.1
Allread, B.S.2
Fullerton, C.E.3
Hinze, J.4
|