메뉴 건너뛰기




Volumn , Issue , 2003, Pages 10-18

Real-time support for mobile robotics

Author keywords

allocation; Distributed real time systems; precedence constraint; schedulability

Indexed keywords

ALLOCATION; COORDINATED BEHAVIOR; DISTRIBUTED REAL TIME SYSTEM; EMERGING APPLICATIONS; FEASIBILITY ANALYSIS; PRECEDENCE CONSTRAINTS; SCHEDULABILITY; SCHEDULING DECISIONS;

EID: 84884174652     PISSN: 10801812     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/RTTAS.2003.1203032     Document Type: Conference Paper
Times cited : (19)

References (28)
  • 1
    • 0033891081 scopus 로고    scopus 로고
    • Period-based load partitioning and assignment for large real-time applications
    • January
    • T. F. Abdelzaher and K. G. Shin. Period-based load partitioning and assignment for large real-time applications. IEEE Transactions on Computers, 49(1):81-87, January 2000.
    • (2000) IEEE Transactions on Computers , vol.49 , Issue.1 , pp. 81-87
    • Abdelzaher, T.F.1    Shin, K.G.2
  • 3
    • 0020720389 scopus 로고
    • Preemptive scheduling of a single machine to minimize maximum cost to release dates and precedence constraints
    • March
    • K. R. Baker, E. L. Lawler, J. K. Lenstra, and A. H. G. R. Kan. Preemptive scheduling of a single machine to minimize maximum cost to release dates and precedence constraints. Operations Research, 31(2):381-386, March 1983.
    • (1983) Operations Research , vol.31 , Issue.2 , pp. 381-386
    • Baker, K.R.1    Lawler, E.L.2    Lenstra, J.K.3    Kan, A.H.G.R.4
  • 4
    • 0035980567 scopus 로고    scopus 로고
    • Scheduling periodic tasks on uniform multiprocessors
    • S. Baruah. Scheduling periodic tasks on uniform multiprocessors. Information Processing Letters, 80(2):97-104, 2001.
    • (2001) Information Processing Letters , vol.80 , Issue.2 , pp. 97-104
    • Baruah, S.1
  • 5
    • 0001326859 scopus 로고    scopus 로고
    • Proportionate progress: A notion of fairness in resource allocation
    • June
    • S. K. Baruah, N. K. Cohen, C. G. Plaxton, and D. A. Varvel. Proportionate progress: A notion of fairness in resource allocation. Algorithmica, 15(2):600-625, June 1996.
    • (1996) Algorithmica , vol.15 , Issue.2 , pp. 600-625
    • Baruah, S.K.1    Cohen, N.K.2    Plaxton, C.G.3    Varvel, D.A.4
  • 7
    • 84976822151 scopus 로고
    • Strong np-completeness results: Motivation, examples, and implications
    • July
    • M. R. Garey and D. S. Johnson. Strong np-completeness results: Motivation, examples, and implications. ACM, 25(3):499-508, July 1978.
    • (1978) ACM , vol.25 , Issue.3 , pp. 499-508
    • Garey, M.R.1    Johnson, D.S.2
  • 9
    • 0029346629 scopus 로고
    • Guaranteeing real-time requirements with resource-based calibration of periodic processes
    • July
    • R. Gerber, S. Hong, and M. Saksena. Guaranteeing real-time requirements with resource-based calibration of periodic processes. IEEE Transactions on Software Engineering, 21(7):579-592, July 1995.
    • (1995) IEEE Transactions on Software Engineering , vol.21 , Issue.7 , pp. 579-592
    • Gerber, R.1    Hong, S.2    Saksena, M.3
  • 14
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard-real-time environment
    • C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogramming in a hard-real-time environment. ACM, 20(1):46-61, 1973.
    • (1973) ACM , vol.20 , Issue.1 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 17
    • 0000204466 scopus 로고    scopus 로고
    • Assignment and scheduling communicating periodic tasks in distributed real-time systems
    • December
    • D. Peng, K. G. Shin, and T. F. Abdelzaher. Assignment and scheduling communicating periodic tasks in distributed real-time systems. IEEE Transactions on Software Engineering, 23(12), December 1997.
    • (1997) IEEE Transactions on Software Engineering , vol.23 , Issue.12
    • Peng, D.1    Shin, K.G.2    Abdelzaher, T.F.3
  • 19
    • 0343258911 scopus 로고    scopus 로고
    • Where do time constraints come from and where do they go
    • November
    • K. Ramamritham. Where do time constraints come from and where do they go? International Journal of Database Management, 7(2):4-10, November 1996.
    • (1996) International Journal of Database Management , vol.7 , Issue.2 , pp. 4-10
    • Ramamritham, K.1
  • 23
    • 0032296746 scopus 로고    scopus 로고
    • Task period selection and schedulability in real-time systems
    • December
    • D. Seto, J. P. Lehoczky, and L. Sha. Task period selection and schedulability in real-time systems. In IEEE real-time systems symposium, pages 188-198, December 1998.
    • (1998) IEEE Real-time Systems Symposium , pp. 188-198
    • Seto, D.1    Lehoczky, J.P.2    Sha, L.3
  • 25
    • 0028207780 scopus 로고
    • Generalized rate monotonic scheduling theory: A framework for developing real-time systems
    • January
    • L. Sha, R. Rajkumar, and S. S. Sathaye. Generalized rate monotonic scheduling theory: A framework for developing real-time systems. Proceedings of the IEEE, 82(1):68-82, January 1994.
    • (1994) Proceedings of the IEEE , vol.82 , Issue.1 , pp. 68-82
    • Sha, L.1    Rajkumar, R.2    Sathaye, S.S.3
  • 26
    • 0037206559 scopus 로고    scopus 로고
    • Deadline-based scheduling of periodic task systems on multiprocessors
    • November
    • A. Srinivasan and S. K. Baruah. Deadline-based scheduling of periodic task systems on multiprocessors. Information Processing Letters, 84(2):93-98, November 2002.
    • (2002) Information Processing Letters , vol.84 , Issue.2 , pp. 93-98
    • Srinivasan, A.1    Baruah, S.K.2
  • 28
    • 84884195329 scopus 로고    scopus 로고
    • On the schedulability analysis for distributed real-time systems
    • May
    • S.Wang and G. Farber. On the schedulability analysis for distributed real-time systems. In Joint IFAC-IFIP WRTP'99 & ARTDB-99, May 1999.
    • (1999) Joint IFAC-IFIP WRTP'99 & ARTDB-99
    • Wang, S.1    Farber, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.