-
1
-
-
0033891081
-
Period-based load partitioning and assignment for large real-time applications
-
January
-
T. F. Abdelzaher and K. G. Shin. Period-based load partitioning and assignment for large real-time applications. IEEE Transactions on Computers, 49(1):81-87, January 2000.
-
(2000)
IEEE Transactions on Computers
, vol.49
, Issue.1
, pp. 81-87
-
-
Abdelzaher, T.F.1
Shin, K.G.2
-
3
-
-
0020720389
-
Preemptive scheduling of a single machine to minimize maximum cost to release dates and precedence constraints
-
March
-
K. R. Baker, E. L. Lawler, J. K. Lenstra, and A. H. G. R. Kan. Preemptive scheduling of a single machine to minimize maximum cost to release dates and precedence constraints. Operations Research, 31(2):381-386, March 1983.
-
(1983)
Operations Research
, vol.31
, Issue.2
, pp. 381-386
-
-
Baker, K.R.1
Lawler, E.L.2
Lenstra, J.K.3
Kan, A.H.G.R.4
-
4
-
-
0035980567
-
Scheduling periodic tasks on uniform multiprocessors
-
S. Baruah. Scheduling periodic tasks on uniform multiprocessors. Information Processing Letters, 80(2):97-104, 2001.
-
(2001)
Information Processing Letters
, vol.80
, Issue.2
, pp. 97-104
-
-
Baruah, S.1
-
5
-
-
0001326859
-
Proportionate progress: A notion of fairness in resource allocation
-
June
-
S. K. Baruah, N. K. Cohen, C. G. Plaxton, and D. A. Varvel. Proportionate progress: A notion of fairness in resource allocation. Algorithmica, 15(2):600-625, June 1996.
-
(1996)
Algorithmica
, vol.15
, Issue.2
, pp. 600-625
-
-
Baruah, S.K.1
Cohen, N.K.2
Plaxton, C.G.3
Varvel, D.A.4
-
7
-
-
84976822151
-
Strong np-completeness results: Motivation, examples, and implications
-
July
-
M. R. Garey and D. S. Johnson. Strong np-completeness results: Motivation, examples, and implications. ACM, 25(3):499-508, July 1978.
-
(1978)
ACM
, vol.25
, Issue.3
, pp. 499-508
-
-
Garey, M.R.1
Johnson, D.S.2
-
9
-
-
0029346629
-
Guaranteeing real-time requirements with resource-based calibration of periodic processes
-
July
-
R. Gerber, S. Hong, and M. Saksena. Guaranteeing real-time requirements with resource-based calibration of periodic processes. IEEE Transactions on Software Engineering, 21(7):579-592, July 1995.
-
(1995)
IEEE Transactions on Software Engineering
, vol.21
, Issue.7
, pp. 579-592
-
-
Gerber, R.1
Hong, S.2
Saksena, M.3
-
13
-
-
84884169619
-
-
In University of Massachusetts, Technical Report, January
-
H. Li, J. Sweeney, K. Ramamritham, and R. Grupen. Pre-analyzed resource and time provisioning in distributed real-time systems: An application to mobile robotics. In University of Massachusetts, Technical Report, January 2003.
-
(2003)
Pre-analyzed Resource and Time Provisioning in Distributed Real-time Systems: An Application to Mobile Robotics
-
-
Li, H.1
Sweeney, J.2
Ramamritham, K.3
Grupen, R.4
-
14
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard-real-time environment
-
C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogramming in a hard-real-time environment. ACM, 20(1):46-61, 1973.
-
(1973)
ACM
, vol.20
, Issue.1
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
17
-
-
0000204466
-
Assignment and scheduling communicating periodic tasks in distributed real-time systems
-
December
-
D. Peng, K. G. Shin, and T. F. Abdelzaher. Assignment and scheduling communicating periodic tasks in distributed real-time systems. IEEE Transactions on Software Engineering, 23(12), December 1997.
-
(1997)
IEEE Transactions on Software Engineering
, vol.23
, Issue.12
-
-
Peng, D.1
Shin, K.G.2
Abdelzaher, T.F.3
-
19
-
-
0343258911
-
Where do time constraints come from and where do they go
-
November
-
K. Ramamritham. Where do time constraints come from and where do they go? International Journal of Database Management, 7(2):4-10, November 1996.
-
(1996)
International Journal of Database Management
, vol.7
, Issue.2
, pp. 4-10
-
-
Ramamritham, K.1
-
23
-
-
0032296746
-
Task period selection and schedulability in real-time systems
-
December
-
D. Seto, J. P. Lehoczky, and L. Sha. Task period selection and schedulability in real-time systems. In IEEE real-time systems symposium, pages 188-198, December 1998.
-
(1998)
IEEE Real-time Systems Symposium
, pp. 188-198
-
-
Seto, D.1
Lehoczky, J.P.2
Sha, L.3
-
24
-
-
0030410148
-
On task schedulability in real-time control system
-
December
-
D. Seto, J. P. Lehoczky, L. Sha, and K. G. Shin. On task schedulability in real-time control system. In IEEE real-time systems symposium, pages 13-21, December 1996.
-
(1996)
IEEE Real-time Systems Symposium
, pp. 13-21
-
-
Seto, D.1
Lehoczky, J.P.2
Sha, L.3
Shin, K.G.4
-
25
-
-
0028207780
-
Generalized rate monotonic scheduling theory: A framework for developing real-time systems
-
January
-
L. Sha, R. Rajkumar, and S. S. Sathaye. Generalized rate monotonic scheduling theory: A framework for developing real-time systems. Proceedings of the IEEE, 82(1):68-82, January 1994.
-
(1994)
Proceedings of the IEEE
, vol.82
, Issue.1
, pp. 68-82
-
-
Sha, L.1
Rajkumar, R.2
Sathaye, S.S.3
-
26
-
-
0037206559
-
Deadline-based scheduling of periodic task systems on multiprocessors
-
November
-
A. Srinivasan and S. K. Baruah. Deadline-based scheduling of periodic task systems on multiprocessors. Information Processing Letters, 84(2):93-98, November 2002.
-
(2002)
Information Processing Letters
, vol.84
, Issue.2
, pp. 93-98
-
-
Srinivasan, A.1
Baruah, S.K.2
-
27
-
-
0036061286
-
Coordinated teams of reactive mobile platforms
-
Washington, D.C., May
-
J. Sweeney, T. Brunette, Y. Yang, and R. Grupen. Coordinated teams of reactive mobile platforms. In Proceedings of the 2002 IEEE Conference on Robotics and Automation, Washington, D.C., May 2002.
-
(2002)
Proceedings of the 2002 IEEE Conference on Robotics and Automation
-
-
Sweeney, J.1
Brunette, T.2
Yang, Y.3
Grupen, R.4
-
28
-
-
84884195329
-
On the schedulability analysis for distributed real-time systems
-
May
-
S.Wang and G. Farber. On the schedulability analysis for distributed real-time systems. In Joint IFAC-IFIP WRTP'99 & ARTDB-99, May 1999.
-
(1999)
Joint IFAC-IFIP WRTP'99 & ARTDB-99
-
-
Wang, S.1
Farber, G.2
|