|
Volumn 45, Issue 1, 1996, Pages 35-39
|
ASPEN: Computer-Aided Assembly Sequence Planning and Evaluation System Based on Predetermined Time Standard
a b c |
Author keywords
Assembling; Computer aided planning; Sequencing
|
Indexed keywords
COMPUTER AIDED DESIGN;
COMPUTER SIMULATION;
OPERATIONS RESEARCH;
PRODUCTION CONTROL;
SCHEDULING;
BOOTHROYD'S DESIGN FOR ASSEMBLY (DFA);
COMPUTER AIDED ASSEMBLY SEQUENCE PLANNING AND EVALUATION SYSTEM;
GEOMETRICALLY FEASIBLE SEQUENCES;
METHODS TIME MEASUREMENT (MTM);
COMPUTER AIDED MANUFACTURING;
|
EID: 0029707115
PISSN: 00078506
EISSN: 17260604
Source Type: Journal
DOI: 10.1016/S0007-8506(07)63012-1 Document Type: Article |
Times cited : (41)
|
References (18)
|