메뉴 건너뛰기




Volumn 4, Issue 5, 2013, Pages 360-369

Fuzzy stochastic inequality and equality possibility constraints and their application in a production-inventory model via optimal control method

Author keywords

Bang Bang control; Fuzzy equality; Fuzzy stochastic inequality; Interval number

Indexed keywords

BANG-BANG CONTROL; FUZZY EQUALITY; FUZZY STOCHASTIC INEQUALITY; INEQUALITY CONSTRAINT; INTERVAL NUMBER; NUMERICAL EXPERIMENTS; OPTIMAL CONTROL METHODS; PRODUCTION INVENTORY MODEL;

EID: 84883458661     PISSN: 18777503     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jocs.2012.03.005     Document Type: Article
Times cited : (18)

References (27)
  • 1
    • 0028769377 scopus 로고
    • Multi-level production-inventory control: material requirements planning or reorder point policies?
    • Axsater S., Rosling K. Multi-level production-inventory control: material requirements planning or reorder point policies?. European Journal of Operational Research 1994, 75:405-412.
    • (1994) European Journal of Operational Research , vol.75 , pp. 405-412
    • Axsater, S.1    Rosling, K.2
  • 3
    • 84883448369 scopus 로고    scopus 로고
    • Manufacturing systems with random breakdowns and deteriorating items
    • Boukas E.K., Liu Z.K. Manufacturing systems with random breakdowns and deteriorating items. Autometica 2000.
    • (2000) Autometica
    • Boukas, E.K.1    Liu, Z.K.2
  • 4
    • 0030403231 scopus 로고    scopus 로고
    • Analysis of optimal production and advertising polices
    • Cho D.I. Analysis of optimal production and advertising polices. International Journal of System Science 1996, 27:1297-1305.
    • (1996) International Journal of System Science , vol.27 , pp. 1297-1305
    • Cho, D.I.1
  • 7
    • 0036568439 scopus 로고    scopus 로고
    • Note on economic production quantity model for items with imperfect quality a practical approach
    • Goyal S.K., Cardenas-Barron L.E. Note on economic production quantity model for items with imperfect quality a practical approach. International Journal of Production Economics 2002, 77:85-87.
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Cardenas-Barron, L.E.2
  • 8
    • 0037119865 scopus 로고    scopus 로고
    • Nearest interval approximation of a fuzzy number
    • Grzegorzewski P. Nearest interval approximation of a fuzzy number. Fuzzy Sets and Systems 2002, 130:321-330.
    • (2002) Fuzzy Sets and Systems , vol.130 , pp. 321-330
    • Grzegorzewski, P.1
  • 10
    • 0344979988 scopus 로고    scopus 로고
    • A theorem of renewal process for fuzzy random variables and its application
    • Hwang C.M. A theorem of renewal process for fuzzy random variables and its application. Fuzzy Sets and Systems 2000, 116:237-244.
    • (2000) Fuzzy Sets and Systems , vol.116 , pp. 237-244
    • Hwang, C.M.1
  • 12
    • 0031622471 scopus 로고    scopus 로고
    • The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs
    • Jaber M.Y., Bonney M. The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs. Production Planning and Control 1998, 9:20-27.
    • (1998) Production Planning and Control , vol.9 , pp. 20-27
    • Jaber, M.Y.1    Bonney, M.2
  • 13
    • 0000804474 scopus 로고    scopus 로고
    • Chance constraint programming with fuzzy parameters
    • Liu B., Iwamura K.B. Chance constraint programming with fuzzy parameters. Fuzzy Sets and Systems 1998, 94:227-237.
    • (1998) Fuzzy Sets and Systems , vol.94 , pp. 227-237
    • Liu, B.1    Iwamura, K.B.2
  • 14
    • 0000058741 scopus 로고    scopus 로고
    • A note on chance constrained programming with fuzzy coefficients
    • Liu B., Iwamura K.B. A note on chance constrained programming with fuzzy coefficients. Fuzzy Sets and Systems 1998, 100:229-233.
    • (1998) Fuzzy Sets and Systems , vol.100 , pp. 229-233
    • Liu, B.1    Iwamura, K.B.2
  • 15
    • 3142673615 scopus 로고    scopus 로고
    • Optimisation under hybrid uncertainty
    • Luhandjula M.K. Optimisation under hybrid uncertainty. Fuzzy sets and Systems 2004, 146:187-203.
    • (2004) Fuzzy sets and Systems , vol.146 , pp. 187-203
    • Luhandjula, M.K.1
  • 16
    • 27344455374 scopus 로고    scopus 로고
    • Fuzzy inventory model with two warehouses under possibility constraints
    • Maiti M.K., Maiti M. Fuzzy inventory model with two warehouses under possibility constraints. Fuzzy Sets and Systems 2006, 157:52-73.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 52-73
    • Maiti, M.K.1    Maiti, M.2
  • 17
    • 26844535301 scopus 로고    scopus 로고
    • Numerical approach of multi-objective optimal control problem in imprecise environment
    • Maity K., Maiti M. Numerical approach of multi-objective optimal control problem in imprecise environment. Fuzzy Optimization and Decision Making 2005, 4:313-330.
    • (2005) Fuzzy Optimization and Decision Making , vol.4 , pp. 313-330
    • Maity, K.1    Maiti, M.2
  • 18
    • 33750448614 scopus 로고    scopus 로고
    • Possibility and necessity constraints and their defuzzification-a multi-item production-inventory scenario via optimal control theory
    • Maity K., Maiti M. Possibility and necessity constraints and their defuzzification-a multi-item production-inventory scenario via optimal control theory. European Journal of Operational Research 2007, 882-896.
    • (2007) European Journal of Operational Research , pp. 882-896
    • Maity, K.1    Maiti, M.2
  • 19
    • 78549253782 scopus 로고    scopus 로고
    • Possibility and necessity representations of fuzzy inequality and its application to two warehouse production-inventory problem
    • Maity K. Possibility and necessity representations of fuzzy inequality and its application to two warehouse production-inventory problem. Applied Mathematical Modelling 2011, 35:1252-1263.
    • (2011) Applied Mathematical Modelling , vol.35 , pp. 1252-1263
    • Maity, K.1
  • 20
    • 0002198641 scopus 로고    scopus 로고
    • Optimal control of production and remanufacturing in a simple recovery model with linear cost functions
    • Minner S., Kleber R. Optimal control of production and remanufacturing in a simple recovery model with linear cost functions. Spektrum 2001, 23:3-24.
    • (2001) Spektrum , vol.23 , pp. 3-24
    • Minner, S.1    Kleber, R.2
  • 22
    • 0022613610 scopus 로고
    • Optimal lotsizing, process quality improvement and set-up cost reduction
    • Porteous E.L. Optimal lotsizing, process quality improvement and set-up cost reduction. Operation Research 1986, 34:137-144.
    • (1986) Operation Research , vol.34 , pp. 137-144
    • Porteous, E.L.1
  • 25
    • 0031185458 scopus 로고    scopus 로고
    • A replenishment policy for items with a price-dependent demand and varying rate of deterioration
    • Wee H.M. A replenishment policy for items with a price-dependent demand and varying rate of deterioration. Production Planning and Control 1997, 8:494-499.
    • (1997) Production Planning and Control , vol.8 , pp. 494-499
    • Wee, H.M.1
  • 27
    • 49349133217 scopus 로고
    • Fuzzy sets as a basis for a theory of possibility
    • Zadeh L.A. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems 1978, 1:3-28.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 3-28
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.