-
2
-
-
33947301794
-
Reliability-based transmission reinforcement planning associated with large-scale wind farms
-
DOI 10.1109/TPWRS.2006.889126
-
R. Billinton and W. Wangdee, "Reliability-based transmission reinforcement planning associated with large-scale wind farms," IEEE Trans. Power Syst., vol. 22, no. 1, pp. 34-41, Feb. 2007. (Pubitemid 46437713)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.1
, pp. 34-41
-
-
Billinton, R.1
Wangdee, W.2
-
3
-
-
53349097646
-
Design optimization of wind power planning for a country with low-medium-wind-speed profile
-
Sep./Oct.
-
C. Chompoo-inwai, M. Leelajindakrairerk, S. Banjongjit, P. Fuangfoo, and W. J. Lee, "Design optimization of wind power planning for a country with low-medium-wind-speed profile," IEEE Trans. Ind. Appl., vol. 44, no. 5, pp. 1341-1347, Sep./Oct. 2008.
-
(2008)
IEEE Trans. Ind. Appl.
, vol.44
, Issue.5
, pp. 1341-1347
-
-
Chompoo-inwai, C.1
Leelajindakrairerk, M.2
Banjongjit, S.3
Fuangfoo, P.4
Lee, W.J.5
-
4
-
-
68349135406
-
Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation
-
Aug.
-
R. Billinton, G. Yi, and R. Karki, "Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1375-1382, Aug. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.3
, pp. 1375-1382
-
-
Billinton, R.1
Yi, G.2
Karki, R.3
-
5
-
-
56749169513
-
Some of the design and methodology considerations in wind resource assessment
-
R. D. Prasad, R. C. Bansal, and M. Sauturaga, "Some of the design and methodology considerations in wind resource assessment," IET Renew. Power Gener., vol. 3, no. 1, pp. 53-64, 2009.
-
(2009)
IET Renew. Power Gener.
, vol.3
, Issue.1
, pp. 53-64
-
-
Prasad, R.D.1
Bansal, R.C.2
Sauturaga, M.3
-
7
-
-
38949206572
-
Wind energy potential of Gökçeada Island in Turkey
-
DOI 10.1016/j.rser.2006.05.016, PII S136403210600150X
-
N. Eskin, H. Artar, and S. Tolun, "Wind energy potential of Gökçeada Island in Turkey," Renew. Sustain. Energy Rev., vol. 12, no. 3, pp. 839-851, Apr. 2008. (Pubitemid 351232303)
-
(2008)
Renewable and Sustainable Energy Reviews
, vol.12
, Issue.3
, pp. 839-851
-
-
Eskin, N.1
Artar, H.2
Tolun, S.3
-
8
-
-
77949490190
-
Wind power distributions: A review of their applications
-
Jun.
-
D. Villanueva and A. Feijóo, "Wind power distributions: A review of their applications," Renew. Sustain. Energy Rev., vol. 14, no. 5, pp. 1490-1495, Jun. 2010.
-
(2010)
Renew. Sustain. Energy Rev.
, vol.14
, Issue.5
, pp. 1490-1495
-
-
Villanueva, D.1
Feijóo, A.2
-
9
-
-
0026963683
-
Optimum windmill-sitematching
-
Dec.
-
Z.M. Salameh and I. Safari, "Optimum windmill-sitematching," IEEE Trans. Energy Convers., vol. 7, no. 4, pp. 669-676, Dec. 1992.
-
(1992)
IEEE Trans. Energy Convers.
, vol.7
, Issue.4
, pp. 669-676
-
-
Salameh, Z.M.1
Safari, I.2
-
10
-
-
0033327151
-
Site matching of wind turbine generators: A case study
-
Dec.
-
S. H. Jangamshetti and V. G. Rau, "Site matching of wind turbine generators: A case study," IEEE Trans. Energy Convers., vol. 14, no. 4, pp. 1537-1543, Dec. 1999.
-
(1999)
IEEE Trans. Energy Convers.
, vol.14
, Issue.4
, pp. 1537-1543
-
-
Jangamshetti, S.H.1
Rau, V.G.2
-
11
-
-
0035275461
-
Optimum siting of wind turbine generators
-
Mar.
-
S. H. Jangamshetti and V. G. Rau, "Optimum siting of wind turbine generators," IEEE Trans. Energy Convers., vol. 16, no. 1, pp. 8-13, Mar. 2001.
-
(2001)
IEEE Trans. Energy Convers.
, vol.16
, Issue.1
, pp. 8-13
-
-
Jangamshetti, S.H.1
Rau, V.G.2
-
12
-
-
33847636287
-
Performance evaluation of pairing between sites and wind turbines
-
Sep.
-
S. Y. Hu and J. H. Cheng, "Performance evaluation of pairing between sites and wind turbines," Renew. Energy, vol. 32, no. 11, pp. 1934-1947, Sep. 2007.
-
(2007)
Renew. Energy
, vol.32
, Issue.11
, pp. 1934-1947
-
-
Hu, S.Y.1
Cheng, J.H.2
-
13
-
-
0035451707
-
Normalized power curves as a tool for identification of optimum wind turbine generator parameters
-
Sep.
-
S. H. Jangamshetti and V. G. Rau, "Normalized power curves as a tool for identification of optimum wind turbine generator parameters," IEEE Trans. Energy Convers., vol. 16, no. 3, pp. 283-288, Sep. 2001.
-
(2001)
IEEE Trans. Energy Convers.
, vol.16
, Issue.3
, pp. 283-288
-
-
Jangamshetti, S.H.1
Rau, V.G.2
-
14
-
-
66849140807
-
Enhancement of matching turbine generators with wind regime using capacity factor curves strategy
-
Jun.
-
S. J. Huang and H. H. Wan, "Enhancement of matching turbine generators with wind regime using capacity factor curves strategy," IEEE Trans. Energy Convers., vol. 24, no. 2, pp. 551-553, Jun. 2009.
-
(2009)
IEEE Trans. Energy Convers.
, vol.24
, Issue.2
, pp. 551-553
-
-
Huang, S.J.1
Wan, H.H.2
-
15
-
-
0010607563
-
Wind Turbine Generator Systems. Part 1: Safety Requirements
-
Wind Turbine Generator Systems. Part 1: Safety Requirements, IEC Standard 61400-1, 1994.
-
(1994)
IEC Standard 61400-1
-
-
-
16
-
-
0020497503
-
DEVELOPMENT OF A NEW PROCEDURE FOR RELIABILITY MODELING OF WIND TURBINE GENERATORS
-
P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators," IEEE Trans. Power Apparat. Syst., vol. 102, no. 1, pp. 134-143, Jan. 1983. (Pubitemid 13493658)
-
(1983)
IEEE transactions on power apparatus and systems
, vol.PAS-102
, Issue.1
, pp. 134-143
-
-
Giorsetto, P.1
Utsurogi, K.F.2
|