메뉴 건너뛰기




Volumn 91, Issue 8, 2013, Pages 1527-1541

Techno-economical assessment of coal and biomass gasification-based hydrogen production supply chain system

Author keywords

Biomass co firing; CO2 capture; Entrained flow; Gasification; Hydrogen production; Supply chain

Indexed keywords

CARBON DIOXIDE CAPTURE; CARBON DIOXIDE CAPTURE AND STORAGE; CHEMICAL PROCESS SIMULATION; CO-FIRING; DISCRETE EVENT MODELS; ENTRAINED FLOW; HYDROGEN PRODUCTION RATE; TOTAL CAPITAL INVESTMENTS;

EID: 84881545065     PISSN: 02638762     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cherd.2013.02.018     Document Type: Article
Times cited : (62)

References (60)
  • 2
    • 84856741785 scopus 로고    scopus 로고
    • Design and operation of a stochastic hydrogen supply chain network under demand uncertainty
    • Almansoori A., Shah N. Design and operation of a stochastic hydrogen supply chain network under demand uncertainty. Int. J. Hydrogen Energy 2012, 37:3965-3977.
    • (2012) Int. J. Hydrogen Energy , vol.37 , pp. 3965-3977
    • Almansoori, A.1    Shah, N.2
  • 3
    • 17044434279 scopus 로고    scopus 로고
    • Efficiencies of hydrogen storage systems on board fuel cell vehicles
    • Ananthachar V., Duffy J.J. Efficiencies of hydrogen storage systems on board fuel cell vehicles. Sol. Energy 2005, 78:687.
    • (2005) Sol. Energy , vol.78 , pp. 687
    • Ananthachar, V.1    Duffy, J.J.2
  • 4
    • 33847346317 scopus 로고    scopus 로고
    • Energy supply, its demand and security issues for developed and emerging economies
    • Asif M., Muneer T. Energy supply, its demand and security issues for developed and emerging economies. Renew. Sustain. Energy Rev. 2007, 11:1390.
    • (2007) Renew. Sustain. Energy Rev. , vol.11 , pp. 1390
    • Asif, M.1    Muneer, T.2
  • 6
    • 50349093805 scopus 로고    scopus 로고
    • Potential importance of hydrogen as a future solution to environmental and transportation problems
    • Balat M. Potential importance of hydrogen as a future solution to environmental and transportation problems. Int. J. Hydrogen Energy 2008, 33:4013.
    • (2008) Int. J. Hydrogen Energy , vol.33 , pp. 4013
    • Balat, M.1
  • 7
    • 65649151466 scopus 로고    scopus 로고
    • Political, economic and environmental impacts of biomass-based hydrogen
    • Balat M., Balat M. Political, economic and environmental impacts of biomass-based hydrogen. Int. J. Hydrogen Energy 2009, 34:3589-3603.
    • (2009) Int. J. Hydrogen Energy , vol.34 , pp. 3589-3603
    • Balat, M.1    Balat, M.2
  • 8
    • 58549112568 scopus 로고    scopus 로고
    • The future of hydrogen - opportunities and challenges
    • Ball M., Wietschel M. The future of hydrogen - opportunities and challenges. Int. J. Hydrogen Energy 2009, 34:615-627.
    • (2009) Int. J. Hydrogen Energy , vol.34 , pp. 615-627
    • Ball, M.1    Wietschel, M.2
  • 11
    • 84881552320 scopus 로고    scopus 로고
    • British Petroleum Statistical Review of World Energy
    • British Petroleum Statistical Review of World Energy, 2010. http://www.bp.com/.
    • (2010)
  • 12
    • 84881556850 scopus 로고    scopus 로고
    • British Petroleum Statistical Review of World Energy
    • British Petroleum Statistical Review of World Energy, 2012. http://www.bp.com/.
    • (2012)
  • 13
    • 84881550424 scopus 로고    scopus 로고
    • Then BGL coal gasification process-development status, operational experience and potential applications
    • Brown D.J., Hirschfelder H., Williams A.J. Then BGL coal gasification process-development status, operational experience and potential applications. 7-th European Gasification Conference 2006.
    • (2006) 7-th European Gasification Conference
    • Brown, D.J.1    Hirschfelder, H.2    Williams, A.J.3
  • 15
    • 84881544384 scopus 로고    scopus 로고
    • Decarbonizarea combustibililor fosili solizi prin gazeificare
    • Cormos C.C. Decarbonizarea combustibililor fosili solizi prin gazeificare. Presa Universitarǎ Clujeana 2008.
    • (2008) Presa Universitarǎ Clujeana
    • Cormos, C.C.1
  • 17
    • 67650756456 scopus 로고    scopus 로고
    • Assessment of hydrogen and electricity co-production schemes based on gasification process with carbon capture and storage
    • Cormos C.C. Assessment of hydrogen and electricity co-production schemes based on gasification process with carbon capture and storage. Int. J. Hydrogen Energy 2009, 34:6066-6070.
    • (2009) Int. J. Hydrogen Energy , vol.34 , pp. 6066-6070
    • Cormos, C.C.1
  • 18
    • 77953912293 scopus 로고    scopus 로고
    • Evaluation of energy integration aspects for IGCC-based hydrogen and electricity co-production with carbon capture and storage
    • Cormos C.C. Evaluation of energy integration aspects for IGCC-based hydrogen and electricity co-production with carbon capture and storage. Int. J. Hydrogen Energy 2010, 35:7485.
    • (2010) Int. J. Hydrogen Energy , vol.35 , pp. 7485
    • Cormos, C.C.1
  • 19
    • 84860836406 scopus 로고    scopus 로고
    • Conceptual design of typical power plant configurations for the estimation of reference capital costs including material
    • Report IE/2010/07/23 107058, Cluj-Napoca, Romania.
    • Cormos, C.C., 2010. Conceptual design of typical power plant configurations for the estimation of reference capital costs including material. Report IE/2010/07/23 107058, Cluj-Napoca, Romania.
    • (2010)
    • Cormos, C.C.1
  • 20
    • 84858284792 scopus 로고    scopus 로고
    • Hydrogen and power co-generation based on coal and biomass/solid wastes co-gasification with carbon capture and storage
    • Cormos C.C. Hydrogen and power co-generation based on coal and biomass/solid wastes co-gasification with carbon capture and storage. Int. J. Hydrogen Energy 2012, 37:5637-5648.
    • (2012) Int. J. Hydrogen Energy , vol.37 , pp. 5637-5648
    • Cormos, C.C.1
  • 21
    • 84860840111 scopus 로고    scopus 로고
    • Integrated assessment of IGCC power generation technology with carbon capture and storage (CCS)
    • Cormos C.C. Integrated assessment of IGCC power generation technology with carbon capture and storage (CCS). Energy 2012, 42:434-445.
    • (2012) Energy , vol.42 , pp. 434-445
    • Cormos, C.C.1
  • 22
    • 84857646088 scopus 로고    scopus 로고
    • Models, methods and approaches for the planning and design of the future hydrogen supply chain
    • Dagdougui H. Models, methods and approaches for the planning and design of the future hydrogen supply chain. Int. J. Hydrogen Energy 2012, 37:5318.
    • (2012) Int. J. Hydrogen Energy , vol.37 , pp. 5318
    • Dagdougui, H.1
  • 23
    • 78650744693 scopus 로고    scopus 로고
    • Air separation and flue gas compression and purification units for oxy-coal combustion systems
    • Darde A., Prabhakarb R., Tranierc J.P., Perrin N. Air separation and flue gas compression and purification units for oxy-coal combustion systems. Energy Procedia 2008, 1:528.
    • (2008) Energy Procedia , vol.1 , pp. 528
    • Darde, A.1    Prabhakarb, R.2    Tranierc, J.P.3    Perrin, N.4
  • 24
    • 0003405496 scopus 로고    scopus 로고
    • EIA (Energy Information Administration), U.S. Departement of Energy
    • EIA (Energy Information Administration) Annual Energy Review 2007, U.S. Departement of Energy.
    • (2007) Annual Energy Review
  • 26
    • 84881541903 scopus 로고    scopus 로고
    • 2012. http://www.energy.siemens.com/.
    • (2012)
  • 29
    • 72149100158 scopus 로고    scopus 로고
    • Study of hydrogen production in light assisted microbial electrolysis cell operated with dye sensitized solar cell
    • Folusho F., Ajayi Kim K., Chae K., Choi M. Study of hydrogen production in light assisted microbial electrolysis cell operated with dye sensitized solar cell. Int. J. Hydrogen Energy 2009, 34:9297.
    • (2009) Int. J. Hydrogen Energy , vol.34 , pp. 9297
    • Folusho, F.1    Ajayi Kim, K.2    Chae, K.3    Choi, M.4
  • 30
    • 78049279690 scopus 로고    scopus 로고
    • Supply chain and logistics issues of bio-energy production
    • Gold S., Seuring S. Supply chain and logistics issues of bio-energy production. J. Cleaner Prod. 2011, 19:32-42.
    • (2011) J. Cleaner Prod. , vol.19 , pp. 32-42
    • Gold, S.1    Seuring, S.2
  • 31
    • 77951126796 scopus 로고    scopus 로고
    • Feasibility of an energy conversion system in Canada involving large-scale integrated hydrogen production using solid fuels
    • Gnanapragasam N.V., Reddy B.V., Rosen M. Feasibility of an energy conversion system in Canada involving large-scale integrated hydrogen production using solid fuels. Int. J. Hydrogen Energy 2010, 35:4788-4807.
    • (2010) Int. J. Hydrogen Energy , vol.35 , pp. 4788-4807
    • Gnanapragasam, N.V.1    Reddy, B.V.2    Rosen, M.3
  • 33
    • 84902411079 scopus 로고    scopus 로고
    • Gulf Professional Publishing, Elsevier Science, Burlington
    • Higman C., Van der Burgt M. Gasification 2008, Gulf Professional Publishing, Elsevier Science, Burlington. 2nd ed.
    • (2008) Gasification
    • Higman, C.1    Van der Burgt, M.2
  • 34
    • 57649107180 scopus 로고    scopus 로고
    • An overview of hydrogen production technologies
    • Hollada J.D., Hu J., King D.L., Wang Y. An overview of hydrogen production technologies. Catal. Today 2009, 139:244.
    • (2009) Catal. Today , vol.139 , pp. 244
    • Hollada, J.D.1    Hu, J.2    King, D.L.3    Wang, Y.4
  • 35
    • 80054026529 scopus 로고    scopus 로고
    • Steam co-gasification of coal and biomass derived chars with synergy effect as an innovative way of hydrogen-rich gas production
    • Howaniec N., Smolinski A., Stanczyk K., Pichlak M. Steam co-gasification of coal and biomass derived chars with synergy effect as an innovative way of hydrogen-rich gas production. Int. J. Hydrogen Energy 2011, 3(6):14455-14463.
    • (2011) Int. J. Hydrogen Energy , vol.3 , Issue.6 , pp. 14455-14463
    • Howaniec, N.1    Smolinski, A.2    Stanczyk, K.3    Pichlak, M.4
  • 36
    • 84881551130 scopus 로고    scopus 로고
    • International Energy Agency (IEA), Greenhouse Gas R&D Programme (GHG). Potential for improvement in gasification combined cycle power generation with CO2 capture. Report PH4/19.
    • International Energy Agency (IEA), 2003. Greenhouse Gas R&D Programme (GHG). Potential for improvement in gasification combined cycle power generation with CO2 capture. Report PH4/19.
    • (2003)
  • 37
    • 84881555722 scopus 로고    scopus 로고
    • International Energy Agency (IEA), Greenhouse Gas R&D Programme (GHG). Co-production of hydrogen and electricity by coal gasification with CO2 capture. Report 13/2007.
    • International Energy Agency (IEA), 2007. Greenhouse Gas R&D Programme (GHG). Co-production of hydrogen and electricity by coal gasification with CO2 capture. Report 13/2007.
    • (2007)
  • 38
    • 84881545467 scopus 로고    scopus 로고
    • IRENA report, Biomass for power generation.
    • IRENA report, 2012. Biomass for power generation. http://www.irena.org/.
    • (2012)
  • 39
    • 34347260787 scopus 로고    scopus 로고
    • The future of coal. European Commission
    • DG Joint Research Centre-Institute for Energy. EUR report 22744.
    • Kavalov, B., Peteves, S.D., 2007. The future of coal. European Commission. DG Joint Research Centre-Institute for Energy. EUR report 22744.
    • (2007)
    • Kavalov, B.1    Peteves, S.D.2
  • 40
    • 84881552490 scopus 로고    scopus 로고
    • Mathematical modeling and simulation of coal co-gasificaiton with waste/biomass in an entrained-flow gasifier
    • Maxim V., Cormos C.C., Agachi P.S. Mathematical modeling and simulation of coal co-gasificaiton with waste/biomass in an entrained-flow gasifier. Stud. Chem. 2010, 2:57.
    • (2010) Stud. Chem. , vol.2 , pp. 57
    • Maxim, V.1    Cormos, C.C.2    Agachi, P.S.3
  • 43
    • 35548936584 scopus 로고    scopus 로고
    • Techno-economic assessment of hydrogen production processes for the hydrogen economy for the short and medium term
    • Muller-Langer F., Tzimas E., Kaltschmidtt M., Peteves S. Techno-economic assessment of hydrogen production processes for the hydrogen economy for the short and medium term. Int. J. Hydrogen Energy 2007, 32:3797-3810.
    • (2007) Int. J. Hydrogen Energy , vol.32 , pp. 3797-3810
    • Muller-Langer, F.1    Tzimas, E.2    Kaltschmidtt, M.3    Peteves, S.4
  • 47
    • 84881552663 scopus 로고    scopus 로고
    • Press, Co-Production of Electricity and Hydrogen from Coal and Biomass Gasification.
    • Pérez-Fortes, M., Bojarski, A.D., Puigjaner, L., Press 2011. Co-Production of Electricity and Hydrogen from Coal and Biomass Gasification.
    • (2011)
    • Pérez-Fortes, M.1    Bojarski, A.D.2    Puigjaner, L.3
  • 48
    • 60049093207 scopus 로고    scopus 로고
    • Logistics issues of biomass: the storage problem and the multi-biomass supply chain
    • Rentizelas A.A., Tolis A.J., Tatsiopoulo s I.P. Logistics issues of biomass: the storage problem and the multi-biomass supply chain. Renew. Sustain. Energy Rev. 2009, 13:887-894.
    • (2009) Renew. Sustain. Energy Rev. , vol.13 , pp. 887-894
    • Rentizelas, A.A.1    Tolis, A.J.2    Tatsiopoulo s, I.P.3
  • 50
    • 84860834015 scopus 로고    scopus 로고
    • Dynamis project: Report. D2.4.3 Final report on concept evaluation. Trondheim, Norway
    • International Energy Agency (IEA), 2007. Power Plant Assessment program. version 3.02, Cheltenham, UK.
    • Rokke, P., Kvamsdal, H., Santos, S., Hudson, V., Goy, C., Tzimas, E., et al. 2007. Dynamis project: Report. D2.4.3 Final report on concept evaluation. Trondheim, Norway. International Energy Agency (IEA), 2007. Power Plant Assessment program. version 3.02, Cheltenham, UK.
    • (2007)
    • Rokke, P.1    Kvamsdal, H.2    Santos, S.3    Hudson, V.4    Goy, C.5    Tzimas, E.6
  • 51
    • 33749241512 scopus 로고    scopus 로고
    • Advantages of integration with industry for electrolytic hydrogen production
    • Saxe M., Alvfors P. Advantages of integration with industry for electrolytic hydrogen production. Energy 2007, 32:42.
    • (2007) Energy , vol.32 , pp. 42
    • Saxe, M.1    Alvfors, P.2
  • 54
    • 34249887931 scopus 로고    scopus 로고
    • Critical factors in the design operation and economics of coal gasification plants: the case of the flexible co-production of hydrogen and electricity
    • Starr F., Tzimas E., Peteves S. Critical factors in the design operation and economics of coal gasification plants: the case of the flexible co-production of hydrogen and electricity. Int. J. Hydrogen Energy 2007, 32:1477-1485.
    • (2007) Int. J. Hydrogen Energy , vol.32 , pp. 1477-1485
    • Starr, F.1    Tzimas, E.2    Peteves, S.3
  • 57
    • 33646499844 scopus 로고    scopus 로고
    • Numerical simulation of coal gasification in entrained flow coal gasifier
    • Watanabe H., Otaka M. Numerical simulation of coal gasification in entrained flow coal gasifier. Fuel 2006, 85:1935-1943.
    • (2006) Fuel , vol.85 , pp. 1935-1943
    • Watanabe, H.1    Otaka, M.2
  • 58
    • 33644854452 scopus 로고    scopus 로고
    • Conceptual design and simulation study of a co-gasification technology
    • Yuehong Z., Hao W., Zhihong X. Conceptual design and simulation study of a co-gasification technology. Energy Convers. Manage. 2006, 47:1416-1428.
    • (2006) Energy Convers. Manage. , vol.47 , pp. 1416-1428
    • Yuehong, Z.1    Hao, W.2    Zhihong, X.3
  • 60
    • 76849102552 scopus 로고    scopus 로고
    • Recent progress in alkaline water electrolysis for hydrogen production and applications
    • Zeng K., Zhang D. Recent progress in alkaline water electrolysis for hydrogen production and applications. Prog. Energy Combust. Sci. 2010, 36:307.
    • (2010) Prog. Energy Combust. Sci. , vol.36 , pp. 307
    • Zeng, K.1    Zhang, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.