메뉴 건너뛰기




Volumn 86, Issue 9, 2013, Pages 2357-2370

Multi-sprint planning and smooth replanning: An optimization model

Author keywords

Agile methods; Linear programming; Optimization models; Scrum; Software engineering

Indexed keywords

AGILE METHODS; GENERALIZED ASSIGNMENT PROBLEM; HEURISTIC SOLUTIONS; INHERENT FLEXIBILITY; LINEAR PROGRAMMING FORMULATION; OPTIMIZATION MODELS; PROJECT EXECUTION; SCRUM;

EID: 84881475474     PISSN: 01641212     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jss.2013.04.028     Document Type: Article
Times cited : (18)

References (47)
  • 3
    • 0037563233 scopus 로고    scopus 로고
    • Rescheduling of identical parallel machines under machine eligibility constraints
    • O. Alagoz, and M. Azizoglu Rescheduling of identical parallel machines under machine eligibility constraints European Journal of Operational Research 149 2003 523 532
    • (2003) European Journal of Operational Research , vol.149 , pp. 523-532
    • Alagoz, O.1    Azizoglu, M.2
  • 4
    • 0032595618 scopus 로고    scopus 로고
    • Embracing change with extreme programming
    • K. Beck Embracing change with extreme programming IEEE Computer 32 1999 70 77
    • (1999) IEEE Computer , vol.32 , pp. 70-77
    • Beck, K.1
  • 8
    • 39449130107 scopus 로고    scopus 로고
    • Agile requirements engineering practices: An empirical study
    • L. Cao, and B. Ramesh Agile requirements engineering practices: an empirical study IEEE Software 25 2008 60 67
    • (2008) IEEE Software , vol.25 , pp. 60-67
    • Cao, L.1    Ramesh, B.2
  • 9
    • 0001917497 scopus 로고    scopus 로고
    • Branch-and-cut algorithms
    • M. Dell'Amico, F. Maffioli, S. Martello, Wiley Interscience Series in Discrete Mathematics
    • A. Caprara, and M. Fischetti Branch-and-cut algorithms M. Dell'Amico, F. Maffioli, S. Martello, Annotated Bibliographies in Combinatorial Optimization 1997 Wiley Interscience Series in Discrete Mathematics 45 63
    • (1997) Annotated Bibliographies in Combinatorial Optimization , pp. 45-63
    • Caprara, A.1    Fischetti, M.2
  • 14
    • 44649189162 scopus 로고    scopus 로고
    • Empirical studies of agile software development: A systematic review
    • T. Dybå, and T. Dingsøyr Empirical studies of agile software development: a systematic review Information & Software Technology 50 2008 833 859
    • (2008) Information & Software Technology , vol.50 , pp. 833-859
    • Dybå, T.1    Dingsøyr, T.2
  • 15
    • 0034288713 scopus 로고    scopus 로고
    • Probe backtrack search for minimal perturbation in dynamic scheduling
    • H. El Sakkout, and M. Wallace Probe backtrack search for minimal perturbation in dynamic scheduling Constraints 5 2000 359 388
    • (2000) Constraints , vol.5 , pp. 359-388
    • El Sakkout, H.1    Wallace, M.2
  • 16
    • 0348170707 scopus 로고    scopus 로고
    • The multidimensional 0-1 knapsack problem: An overview
    • A. Fréville The multidimensional 0-1 knapsack problem: an overview European Journal of Operational Research 155 2004 1 21
    • (2004) European Journal of Operational Research , vol.155 , pp. 1-21
    • Fréville, A.1
  • 17
    • 11844264822 scopus 로고    scopus 로고
    • Linear-programming-based heuristics for project capacity planning
    • N. Gademann, and M. Schutten Linear-programming-based heuristics for project capacity planning IIE Transactions 37 2005 153 165
    • (2005) IIE Transactions , vol.37 , pp. 153-165
    • Gademann, N.1    Schutten, M.2
  • 18
    • 84866668458 scopus 로고    scopus 로고
    • Sprint planning optimization in agile data warehouse design
    • Vienna, Austria
    • M. Golfarelli, S. Rizzi, and E. Turricchia Sprint planning optimization in agile data warehouse design Proc. DaWaK Vienna, Austria 2012 30 41
    • (2012) Proc. DaWaK , pp. 30-41
    • Golfarelli, M.1    Rizzi, S.2    Turricchia, E.3
  • 19
    • 0742307215 scopus 로고    scopus 로고
    • Software release planning: An evolutionary and iterative approach
    • D. Greer, and G. Ruhe Software release planning: an evolutionary and iterative approach Information & Software Technology 46 2004 243 253
    • (2004) Information & Software Technology , vol.46 , pp. 243-253
    • Greer, D.1    Ruhe, G.2
  • 21
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: A review and classification of procedures
    • W. Herroelen, and R. Leus Robust and reactive project scheduling: a review and classification of procedures International Journal of Production Research 42 2004 1599 1620
    • (2004) International Journal of Production Research , vol.42 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 24
    • 84877919713 scopus 로고    scopus 로고
    • The software value map - An exhaustive collection of value aspects for the development of software intensive products
    • in press
    • M. Khurum, T. Gorschek, and M. Wilson The software value map - an exhaustive collection of value aspects for the development of software intensive products Journal of Software: Evolution and Process 2012 in press
    • (2012) Journal of Software: Evolution and Process
    • Khurum, M.1    Gorschek, T.2    Wilson, M.3
  • 25
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • R. Kolisch, and R. Padman An integrated survey of deterministic project scheduling Omega 29 2001 249 272
    • (2001) Omega , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 26
    • 0038044512 scopus 로고    scopus 로고
    • Iterative and incremental development: A brief history
    • C. Larman, and V.R. Basili Iterative and incremental development: a brief history IEEE Computer 36 2003 47 56
    • (2003) IEEE Computer , vol.36 , pp. 47-56
    • Larman, C.1    Basili, V.R.2
  • 27
    • 79751537620 scopus 로고    scopus 로고
    • An integrated approach for requirement selection and scheduling in software release planning
    • C. Li, M. van den Akker, S. Brinkkemper, and G. Diepen An integrated approach for requirement selection and scheduling in software release planning Requir. Eng. 15 2010 375 396
    • (2010) Requir. Eng. , vol.15 , pp. 375-396
    • Li, C.1    Van Den Akker, M.2    Brinkkemper, S.3    Diepen, G.4
  • 32
    • 38149148052 scopus 로고
    • Project and portfolio planning cycle: Project based management for multi-project challenge
    • A. Platje, H. Seidel, and S. Wadman Project and portfolio planning cycle: project based management for multi-project challenge International Journal of Project Management 12 1994 100 107
    • (1994) International Journal of Project Management , vol.12 , pp. 100-107
    • Platje, A.1    Seidel, H.2    Wadman, S.3
  • 33
    • 70149113686 scopus 로고    scopus 로고
    • Value creation by agile projects: Methodology or mystery?
    • Oulu, Finland
    • Z. Racheva, M. Daneva, and K. Sikkel Value creation by agile projects: methodology or mystery? Proc. PROFES Oulu, Finland 2009 141 155
    • (2009) Proc. PROFES , pp. 141-155
    • Racheva, Z.1    Daneva, M.2    Sikkel, K.3
  • 35
    • 70149091457 scopus 로고    scopus 로고
    • Integrating value and utility concepts into a value decomposition model for value-based software engineering
    • Oulu, Finland
    • M. Rönkkö, C. Frühwirth, and S. Biffl Integrating value and utility concepts into a value decomposition model for value-based software engineering Proc. PROFES Oulu, Finland 2009 362 374
    • (2009) Proc. PROFES , pp. 362-374
    • Rönkkö, M.1    Frühwirth, C.2    Biffl, S.3
  • 36
    • 61849169018 scopus 로고    scopus 로고
    • Guidelines for conducting and reporting case study research in software engineering
    • P. Runeson, and M. Höst Guidelines for conducting and reporting case study research in software engineering Empirical Software Engineering 14 2009 131 164
    • (2009) Empirical Software Engineering , vol.14 , pp. 131-164
    • Runeson, P.1    Höst, M.2
  • 37
    • 1542526699 scopus 로고
    • Predictive and reactive scheduling with the MicroBoss production scheduling and control system
    • Chambéry, France
    • N. Sadeh, S. Otsuka, and R. Schelaback Predictive and reactive scheduling with the MicroBoss production scheduling and control system Proc. IJCAI Chambéry, France 1993 293 306
    • (1993) Proc. IJCAI , pp. 293-306
    • Sadeh, N.1    Otsuka, S.2    Schelaback, R.3
  • 38
    • 33646911473 scopus 로고    scopus 로고
    • Supporting software release planning decisions for evolving systems
    • M.O. Saliu, and G. Ruhe Supporting software release planning decisions for evolving systems Proc. SEW 2005 14 26
    • (2005) Proc. SEW , pp. 14-26
    • Saliu, M.O.1    Ruhe, G.2
  • 39
    • 37849029618 scopus 로고    scopus 로고
    • Bi-objective release planning for evolving software systems
    • M.O. Saliu, and G. Ruhe Bi-objective release planning for evolving software systems Proc. ESEC/SIGSOFT FSE 2007 105 114
    • (2007) Proc. ESEC/SIGSOFT FSE , pp. 105-114
    • Saliu, M.O.1    Ruhe, G.2
  • 40
  • 42
    • 79953719649 scopus 로고    scopus 로고
    • Conceptual scheduling model and optimized release scheduling for agile environments
    • A. Szoke Conceptual scheduling model and optimized release scheduling for agile environments Information & Software Technology 53 2011 574 591
    • (2011) Information & Software Technology , vol.53 , pp. 574-591
    • Szoke, A.1
  • 46
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • G.E. Vieira, J.W. Herrmann, and E. Lin Rescheduling manufacturing systems: a framework of strategies, policies, and methods Journal of Scheduling 6 2003 39 62
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 47
    • 1842427471 scopus 로고    scopus 로고
    • A new method for technology valuation in monetary value: Procedure and application
    • P. Yongtae, and P. Gwangman A new method for technology valuation in monetary value: procedure and application Technovation 24 2004 387 394
    • (2004) Technovation , vol.24 , pp. 387-394
    • Yongtae, P.1    Gwangman, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.