-
3
-
-
33847285147
-
An xml based implementation of the value added chain in manufacturing: A ship repair case study
-
Chryssolouris G, Makris S, Xanthakis V, Konstantinis V (2003) An XML based implementation of the Value Added Chain in Manufacturing: A Ship repair Case Study, CIRP Journal of Manufacturing Systems, Vol. 32, No.6
-
(2003)
CIRP Journal of Manufacturing Systems
, vol.32
, Issue.6
-
-
Chryssolouris, G.1
Makris, S.2
Xanthakis, V.3
Konstantinis, V.4
-
4
-
-
33847303250
-
An approach to planning and control of ship repair manufacturing operations
-
Chryssolouris G, Mourtzis D, Makris S (2003) An Approach to Planning and Control of Ship Repair Manufacturing Operations, CIRP Journal of Manufac-Turing Systems, Vol. 32, No.1
-
(2003)
CIRP Journal of Manufac-Turing Systems
, vol.32
, Issue.1
-
-
Chryssolouris, G.1
Mourtzis, D.2
Makris, S.3
-
5
-
-
0442295490
-
Towards the internet based supply chain management for ship repair industry
-
Chryssolouris G, Makris S, Xanthakis V, Mourtzis D (2004) Towards the Internet based Supply Chain Management for ship repair industry, International Journal of Computer Integrated Manufacturing, Vol. 17, pp. 45-57
-
(2004)
International Journal of Computer Integrated Manufacturing
, vol.17
, pp. 45-57
-
-
Chryssolouris, G.1
Makris, S.2
Xanthakis, V.3
Mourtzis, D.4
-
7
-
-
0004421071
-
An evolution program for the resource-constrained project scheduling problem
-
Cheng R, Gen M (1998) An evolution Program for the Resource-Constrained Project Scheduling Problem, Computer Integrated Manufacturing, Vol. 11, No 3, 274-287
-
(1998)
Computer Integrated Manufacturing
, vol.11
, Issue.3
, pp. 274-287
-
-
Cheng, R.1
Gen, M.2
-
8
-
-
0033102020
-
Deterministic job-shop scheduling: Past, present and future
-
Jain AS, Meeran S (1999) Deterministic job-shop scheduling: Past, present and future, European Journal of Operational Research, Volume 113, Issue 2, Pages: 390-434
-
(1999)
European Journal of Operational Research
, vol.113
, Issue.2
, pp. 390-434
-
-
Jain, A.S.1
Meeran, S.2
-
9
-
-
77953650990
-
A multiple-criteria scheduling method for planning of continuous manufacturing processes
-
Udine, Italy
-
Mourtzis D, Xeromerites S, Chryssolouris G (1999) A Multiple-Criteria Scheduling Method for Planning of Continuous Manufacturing Processes. A Food Industry Case Study, Proceedings of the AMST 5th International Conference on Advanced Manufacturing Systems and Technology, Udine, Italy, pp. 197-206
-
(1999)
A Food Industry Case Study, Proceedings of the AMST 5th International Conference on Advanced Manufacturing Systems and Technology
, pp. 197-206
-
-
Mourtzis, D.1
Xeromerites, S.2
Chryssolouris, G.3
-
10
-
-
0037201175
-
A study of scheduling problem in agro-food manufacturing systems
-
Gargouri E, Hammadi S, Borne P (2002) A study of scheduling problem in agro-food manufacturing systems, Mathematics and Computers in Simulation, Vol. 60, Issues 3-5, 277-291
-
(2002)
Mathematics and Computers in Simulation
, vol.60
, Issue.3-5
, pp. 277-291
-
-
Gargouri, E.1
Hammadi, S.2
Borne, P.3
-
11
-
-
0034694452
-
A decision-making approach for nesting scheduling: A textile case
-
Chryssolouris G, Papakostas N, Mourtzis D (2000) A Decision-Making Approach for Nesting Scheduling: A Textile Case, International Journal of Production Research (Vol. 38, No. 17), pp. 4555-4564
-
(2000)
International Journal of Production Research
, vol.38
, Issue.17
, pp. 4555-4564
-
-
Chryssolouris, G.1
Papakostas, N.2
Mourtzis, D.3
|