메뉴 건너뛰기




Volumn , Issue , 2008, Pages 521-532

Knowledge management paradigms in selected manufacturing case studies

Author keywords

Scheduling; Supply chain planning

Indexed keywords


EID: 84881369181     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1007/978-3-540-78431-9_30     Document Type: Chapter
Times cited : (9)

References (11)
  • 7
    • 0004421071 scopus 로고    scopus 로고
    • An evolution program for the resource-constrained project scheduling problem
    • Cheng R, Gen M (1998) An evolution Program for the Resource-Constrained Project Scheduling Problem, Computer Integrated Manufacturing, Vol. 11, No 3, 274-287
    • (1998) Computer Integrated Manufacturing , vol.11 , Issue.3 , pp. 274-287
    • Cheng, R.1    Gen, M.2
  • 8
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain AS, Meeran S (1999) Deterministic job-shop scheduling: Past, present and future, European Journal of Operational Research, Volume 113, Issue 2, Pages: 390-434
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 10
    • 0037201175 scopus 로고    scopus 로고
    • A study of scheduling problem in agro-food manufacturing systems
    • Gargouri E, Hammadi S, Borne P (2002) A study of scheduling problem in agro-food manufacturing systems, Mathematics and Computers in Simulation, Vol. 60, Issues 3-5, 277-291
    • (2002) Mathematics and Computers in Simulation , vol.60 , Issue.3-5 , pp. 277-291
    • Gargouri, E.1    Hammadi, S.2    Borne, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.