메뉴 건너뛰기




Volumn 28, Issue 3, 2013, Pages 3114-3125

A versatile probability distribution model for wind power forecast errors and its application in economic dispatch

Author keywords

Cumulative distribution function (CDF); economic dispatch (ED); forecast; forecast span (FS); probability density function (PDF); sequential linear programming (SLP); versatile distribution; wind power

Indexed keywords

CUMULATIVE DISTRIBUTION FUNCTION; ECONOMIC DISPATCH; PROBABILITY DENSITY FUNCTION (PDF); SEQUENTIAL LINEAR PROGRAMMING; VERSATILE DISTRIBUTION;

EID: 84881023971     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2249596     Document Type: Article
Times cited : (261)

References (33)
  • 3
    • 84881021943 scopus 로고    scopus 로고
    • [Online]. Available: http://130.226.56.153/zephyr/publ/GGiebelEtAl- StateOfTheArtInShortTermPrediction-ANEMOSplus-2011.pdf.
  • 4
    • 18944371663 scopus 로고    scopus 로고
    • A new approach to quantify reserve demand in systems with significant installed wind capacity
    • DOI 10.1109/TPWRS.2005.846206
    • R. Doherty and M. O'Malley, "A new approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 587-595, May 2005. (Pubitemid 40699684)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 587-595
    • Doherty, R.1    O'Malley, M.2
  • 5
    • 43849089442 scopus 로고    scopus 로고
    • Stochastic security for operations planning with significant wind power generation
    • DOI 10.1109/TPWRS.2008.919318
    • F. Bouffard and F. D. Galiana, "Stochastic security for operations planning with significant wind power generation," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 306-316, May 2008. (Pubitemid 351695808)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 306-316
    • Bouffard, F.1    Galiana, F.D.2
  • 6
    • 83255181181 scopus 로고    scopus 로고
    • A solution of the economic dispatch problem considering wind power uncertainty
    • Nov.
    • Z.-S. Zhang, Y.-Z. Sun, G.-J. Li, L. Cheng, and J. Lin, "A solution of the economic dispatch problem considering wind power uncertainty," Autom. Elect. Power Syst., vol. 35, no. 22, pp. 125-130, Nov. 2011.
    • (2011) Autom. Elect. Power Syst. , vol.35 , Issue.22 , pp. 125-130
    • Zhang, Z.-S.1    Sun, Y.-Z.2    Li, G.-J.3    Cheng, L.4    Lin, J.5
  • 8
    • 24944575302 scopus 로고    scopus 로고
    • Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market
    • DOI 10.1109/TPWRS.2005.852148
    • A. Fabbri, T. G. S. Roman, J. R. Abbad, and V. H. M Quezada, "Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1440-1446, Aug. 2005. (Pubitemid 41300957)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1440-1446
    • Fabbri, A.1    San Roman, T.G.2    Abbad, J.R.3    Quezada, V.H.M.4
  • 10
    • 19144369129 scopus 로고    scopus 로고
    • On the uncertainty of wind power predictions - Analysis of the forecast accuracy and statistical distribution of errors
    • DOI 10.1115/1.1862266
    • M. Lange, "On the uncertainty of wind power predictions - Analysis of the forecast accuracy and statistical distribution of errors," J. Solar Energy Eng., vol. 127, pp. 177-184, May 2005. (Pubitemid 40715337)
    • (2005) Journal of Solar Energy Engineering, Transactions of the ASME , vol.127 , Issue.2 , pp. 177-184
    • Lange, M.1
  • 11
    • 77954834157 scopus 로고    scopus 로고
    • Intermittent wind generation in optimal power flow dispatching
    • R. A. Jabr and B. C. Pal, "Intermittent wind generation in optimal power flow dispatching," IET Gener., Transm., Distrib., vol. 3, no. 1, pp. 66-74, 2009.
    • (2009) IET Gener., Transm., Distrib. , vol.3 , Issue.1 , pp. 66-74
    • Jabr, R.A.1    Pal, B.C.2
  • 12
    • 67349201354 scopus 로고    scopus 로고
    • A stochastic model for the optimal operation of a wind-thermal power system
    • May
    • V. S. Pappala, I. Erlich, K. Rohrig, and J. Dobschinski, "A stochastic model for the optimal operation of a wind-thermal power system," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 940-950, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 940-950
    • Pappala, V.S.1    Erlich, I.2    Rohrig, K.3    Dobschinski, J.4
  • 13
    • 28244485444 scopus 로고    scopus 로고
    • Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers
    • DOI 10.1109/TPWRS.2005.857930
    • V. Miranda and P. S. Hang, "Economic dispatchmodel with fuzzywind constraints and attitudes of dispatchers," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 2143-2145, Nov. 2005. (Pubitemid 41700569)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2143-2145
    • Miranda, V.1    Hang, P.S.2
  • 14
    • 44349093221 scopus 로고    scopus 로고
    • An economic dispatch model incorporating wind power
    • DOI 10.1109/TEC.2007.914171
    • J. Hetzer, D. C. Yu, and K. Bhattarai, "An economic dispatch model incorporating wind power," IEEE Trans. Energy Convers., vol. 23, no. 2, pp. 603-611, Jun. 2008. (Pubitemid 351728801)
    • (2008) IEEE Transactions on Energy Conversion , vol.23 , Issue.2 , pp. 603-611
    • Hetzer, J.1    Yu, D.C.2    Bhattarai, K.3
  • 15
    • 78649368960 scopus 로고    scopus 로고
    • Comparative study on impacts of wind profiles on thermal units scheduling costs
    • M. H. Albadi and E. F. El-Saadany, "Comparative study on impacts of wind profiles on thermal units scheduling costs," IET Renew. Power Gener., vol. 5, no. 1, pp. 26-35, 2011.
    • (2011) IET Renew. Power Gener. , vol.5 , Issue.1 , pp. 26-35
    • Albadi, M.H.1    El-Saadany, E.F.2
  • 17
    • 0031140145 scopus 로고    scopus 로고
    • An efficient predictor-corrector interior point algorithm for security-constrained economic dispatch
    • X. Yan and V. H. Quintana, "An efficient predictor-corrector interior point algorithm for security-constrained economic dispatch," IEEE Trans. Power Syst., vol. 12, no. 2, pp. 803-810, May 1997. (Pubitemid 127771443)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.2 , pp. 803-810
    • Yan, X.1    Quintana, V.H.2
  • 19
    • 42749087557 scopus 로고    scopus 로고
    • Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization
    • Aug
    • L. Wang and C. Singh, "Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization," Elect. Power Syst. Res., vol. 78, no. 8, pp. 1361-1368, Aug. 2008.
    • (2008) Elect. Power Syst. Res. , vol.78 , Issue.8 , pp. 1361-1368
    • Wang, L.1    Singh, C.2
  • 20
    • 33750177208 scopus 로고    scopus 로고
    • Short-term real-power scheduling considering fuzzy factors in an autonomous system using genetic algorithms
    • DOI 10.1049/ip-gtd:20050535
    • Y.-Y. Hong and C.-T. Li, "Short-term real-power scheduling considering fuzzy factors in an autonomous systemusing genetic algorithms," Proc. Inst. Elect. Eng., Gener., Transm., Distrib., vol. 153, no. 6, pp. 684-692, Nov. 2006. (Pubitemid 44601630)
    • (2006) IEE Proceedings: Generation, Transmission and Distribution , vol.153 , Issue.6 , pp. 684-692
    • Hong, Y.-Y.1    Li, C.-T.2
  • 21
    • 34248168515 scopus 로고    scopus 로고
    • Simulated annealing-based optimal wind-thermal coordination scheduling
    • DOI 10.1049/iet-gtd:20060208
    • C.-L. Chen, "Simulated annealing-based optimal wind-thermal coordination scheduling," IET Gener., Transm., Distrib., vol. 1, no. 3, pp. 447-455, 2007. (Pubitemid 46718682)
    • (2007) IET Generation, Transmission and Distribution , vol.1 , Issue.3 , pp. 447-455
    • Chen, C.-L.1
  • 22
    • 36348943626 scopus 로고    scopus 로고
    • Optimal spinning reserve for a wind-thermal power system using EIPSO
    • DOI 10.1109/TPWRS.2007.907519
    • T.-Y. Lee, "Optimal spinning reserve for a wind-thermal power system using EIPSO," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1612-1621, Nov. 2007. (Pubitemid 350141960)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1612-1621
    • Lee, T.-Y.1
  • 24
    • 4043072671 scopus 로고    scopus 로고
    • A solution to the stochastic unit commitment problem using chance constrained programming
    • Aug
    • U. A. Ozturk,M.Mazumdar, and B. A. Norman, "A solution to the stochastic unit commitment problem using chance constrained programming," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1589-1598, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1589-1598
    • Ozturk, U.A.1    Mazumdar, M.2    Norman, B.A.3
  • 25
    • 77954781085 scopus 로고    scopus 로고
    • Statistical characterization of wind power output for a given wind power forecast
    • Starkville, MS, USA
    • A. T. Al-Awami and M. A. El-Sharkawi, "Statistical characterization of wind power output for a given wind power forecast," in Proc. North American Power Symp., Starkville, MS, USA, 2009.
    • (2009) Proc. North American Power Symp.
    • Al-Awami, A.T.1    El-Sharkawi, M.A.2
  • 28
    • 79959567613 scopus 로고    scopus 로고
    • Increased wind revenue and system security by trading wind power in energy and regulation reserve markets
    • Jul
    • J. Liang, S. Grijalva, and R. G. Harley, "Increased wind revenue and system security by trading wind power in energy and regulation reserve markets," IEEE Trans. Sustain. Energy, vol. 2, no. 3, pp. 340-347, Jul. 2011.
    • (2011) IEEE Trans. Sustain. Energy , vol.2 , Issue.3 , pp. 340-347
    • Liang, J.1    Grijalva, S.2    Harley, R.G.3
  • 29
    • 0031270139 scopus 로고    scopus 로고
    • Bb-objective power dispatch using fuzzy satisfaction-maximizing decision approach
    • C.-M. Huang, H.-T. Yang, and C.-L. Huang, "Bi-objective power dispatch using fuzzy satisfaction-maximizing decision approach," IEEE Trans. Power Syst., vol. 12, no. 4, pp. 1715-1721, Nov. 1997. (Pubitemid 127771566)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.4 , pp. 1715-1721
    • Huang, C.-M.1    Yang, H.-T.2    Huang, C.-L.3
  • 32
    • 79960894189 scopus 로고    scopus 로고
    • Unit commitment with volatile node injections by using interval optimization
    • Aug
    • Y. Wang, Q. Xia, and C. Kang, "Unit commitment with volatile node injections by using interval optimization," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1705-1713, Aug. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.3 , pp. 1705-1713
    • Wang, Y.1    Xia, Q.2    Kang, C.3
  • 33
    • 49249095955 scopus 로고    scopus 로고
    • Security-constrained unit commitment with volatile wind power generation
    • Aug
    • J. Wang, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with volatile wind power generation," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1319-1327, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1319-1327
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.