-
1
-
-
4043084055
-
Congestion-driven transmission expansion in competitive power markets
-
Shrestha, G.B., Fonseka, P.A.J.: 'Congestion-driven transmission expansion in competitive power markets', IEEE Trans. Power Syst., 2004, 19, (3), pp. 1658-1665
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.3
, pp. 1658-1665
-
-
Shrestha, G.B.1
Fonseka, P.A.J.2
-
2
-
-
33747619411
-
Network planning in unbundled power systems
-
Buygi, M.O., Shanechi, H.M., Balzer, G., Shahidehpour, M., Pariz, N.: 'Network planning in unbundled power systems', IEEE Trans. Power Syst., 2006, 21, (3), pp. 1379-1387
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.3
, pp. 1379-1387
-
-
Buygi, M.O.1
Shanechi, H.M.2
Balzer, G.3
Shahidehpour, M.4
Pariz, N.5
-
3
-
-
79960918103
-
A multi-objective framework for dynamic transmission expansion planning in competitive electricity market
-
Foroud, A.A., Abdoos, A.A., Keypour, R., Amirahmadi, M.: 'A multi-objective framework for dynamic transmission expansion planning in competitive electricity market', Int. J. Electr. Power Energy Syst., 2010, 32, (8), pp. 861-872
-
(2010)
Int. J. Electr. Power Energy Syst.
, vol.32
, Issue.8
, pp. 861-872
-
-
Foroud, A.A.1
Abdoos, A.A.2
Keypour, R.3
Amirahmadi, M.4
-
4
-
-
0037292318
-
A new strategy for transmission expansion in competitive electricity markets
-
Fang, R., Hill, D.J.: 'A new strategy for transmission expansion in competitive electricity markets', IEEE Trans. Power Syst., 2003, 18, (1), pp. 374-380
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.1
, pp. 374-380
-
-
Fang, R.1
Hill, D.J.2
-
5
-
-
8644271634
-
Transmission planning in deregulated environments
-
Buygi, M.O., Shanechi, H.M., Shahidehpour, M.: 'Transmission planning in deregulated environments', Int. J Eng., 2002, 15, (3), pp. 249-256
-
(2002)
Int. J Eng.
, vol.15
, Issue.3
, pp. 249-256
-
-
Buygi, M.O.1
Shanechi, H.M.2
Shahidehpour, M.3
-
6
-
-
70350772691
-
Transmission expansion planning from past to future
-
(PSCE'06). 2006
-
Lee, C.W., Ng, S.K.K., Zhong, J., Wu, F.F.: 'Transmission expansion planning from past to future'. IEEE PES, Power Systems Conf. and Exposition, 2006, (PSCE'06). 2006
-
(2006)
IEEE PES, Power Systems Conf. and Exposition
-
-
Lee, C.W.1
Ng, S.K.K.2
Zhong, J.3
Wu, F.F.4
-
7
-
-
0037843031
-
Classification of publications and models on transmission expansion planning
-
Latorre, G., Cruz, R.D., Areiza, J.M., Villegas, A.: 'Classification of publications and models on transmission expansion planning', IEEE Trans. Power Syst., 2003, 18, (2), pp. 938-946
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.2
, pp. 938-946
-
-
Latorre, G.1
Cruz, R.D.2
Areiza, J.M.3
Villegas, A.4
-
8
-
-
77953327756
-
Distribution system state estimation through Gaussian mixture model of the load as pseudo-measurement
-
Singh, R., Pal, B.C., Jabr, R.A.: 'Distribution system state estimation through Gaussian mixture model of the load as pseudo-measurement', IET Proc. Gener. Transm. Distrib., 2010, 4, (1), pp. 50-59
-
(2010)
IET Proc. Gener. Transm. Distrib.
, vol.4
, Issue.1
, pp. 50-59
-
-
Singh, R.1
Pal, B.C.2
Jabr, R.A.3
-
9
-
-
76649139141
-
Statistical representation of distribution system loads using Gaussian mixture model
-
Singh, R., Pal, B.C., Jabr, R.A.: 'Statistical representation of distribution system loads using Gaussian mixture model', IEEE Trans. Power Syst., 2010, 25, (1), pp. 29-37
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.1
, pp. 29-37
-
-
Singh, R.1
Pal, B.C.2
Jabr, R.A.3
-
10
-
-
77954834157
-
Intermittent wind generation in optimal power flow dispatching
-
Jabr, R.A., Pal, B.C.: 'Intermittent wind generation in optimal power flow dispatching', IET Proc. Gener. Transm. Distrib., 2009, 3, (1), pp. 66-74
-
(2009)
IET Proc. Gener. Transm. Distrib.
, vol.3
, Issue.1
, pp. 66-74
-
-
Jabr, R.A.1
Pal, B.C.2
-
11
-
-
36348946425
-
A metaheuristic to solve the transmission expansion planning
-
Romero, R., Rider, M.J., Silva, I.d.J.: 'A metaheuristic to solve the transmission expansion planning', IEEE Trans. Power Syst., 2007, 22, (4), pp. 2289-2291
-
(2007)
IEEE Trans. Power Syst.
, vol.22
, Issue.4
, pp. 2289-2291
-
-
Romero, R.1
Rider, M.J.2
Silva, I.d.J.3
-
12
-
-
77954156364
-
Harmony search algorithm for transmission network expansion planning
-
Verma, A., Panigrahi, B.K., Bijwe, P.R.: 'Harmony search algorithm for transmission network expansion planning', IET Proc. Gener. Transm. Distrib., 2010, 4, (6), pp. 663-673
-
(2010)
IET Proc. Gener. Transm. Distrib.
, vol.4
, Issue.6
, pp. 663-673
-
-
Verma, A.1
Panigrahi, B.K.2
Bijwe, P.R.3
-
13
-
-
0142071752
-
Analysis of heuristic algorithms for the transportation model in static and multistage planning in network expansion systems
-
Romero, R., Rocha, C., Mantovani, M., Mantovani, J.R.S.: 'Analysis of heuristic algorithms for the transportation model in static and multistage planning in network expansion systems', IEE Proc. Gener. Transm. Distrib., 2003, 150, (5), pp. 521-526
-
(2003)
IEE Proc. Gener. Transm. Distrib.
, vol.150
, Issue.5
, pp. 521-526
-
-
Romero, R.1
Rocha, C.2
Mantovani, M.3
Mantovani, J.R.S.4
-
14
-
-
34547759758
-
Multi-voltage approach to long-term network expansion planning
-
Seifi, H., Sepasian, M.S., Haghighat, H., Foroud, A.A., Yousefi, G.R., Rae, S.: 'Multi-voltage approach to long-term network expansion planning', IET Proc. Gener. Transm. Distrib., 2007, 1, (5), pp. 826-835
-
(2007)
IET Proc. Gener. Transm. Distrib.
, vol.1
, Issue.5
, pp. 826-835
-
-
Seifi, H.1
Sepasian, M.S.2
Haghighat, H.3
Foroud, A.A.4
Yousefi, G.R.5
Rae, S.6
-
15
-
-
63449084578
-
Differential evolution algorithm for static and multistage transmission expansion planning
-
Sum-Im, T., Taylor, G.A., Irving, M.R., Song, Y.H.: 'Differential evolution algorithm for static and multistage transmission expansion planning', IET Proc. Gener. Transm. Distrib., 2009, 3, (4), pp. 365-384
-
(2009)
IET Proc. Gener. Transm. Distrib.
, vol.3
, Issue.4
, pp. 365-384
-
-
Sum-Im, T.1
Taylor, G.A.2
Irving, M.R.3
Song, Y.H.4
-
16
-
-
79951541576
-
Performance comparison of metaheuristics to solve the multi-stage transmission expansion planning problem
-
Leite da Silva, A.M., Rezende, L.S., Honório, L.M., Manso, L.A.F.: 'Performance comparison of metaheuristics to solve the multi-stage transmission expansion planning problem', IET Proc. Gener. Transm. Distrib., 2011, 5, (3), pp. 360-367
-
(2011)
IET Proc. Gener. Transm. Distrib.
, vol.5
, Issue.3
, pp. 360-367
-
-
Leite da Silva, A.M.1
Rezende, L.S.2
Honório, L.M.3
Manso, L.A.F.4
-
17
-
-
79960053671
-
Efficient method for ac transmission network expansion planning
-
Rahmani, M., Rashidinejad, M., Carreno, E.M., Romero, R.: 'Efficient method for ac transmission network expansion planning', Electr. Power Syst. Res., 2010, 80, (9), pp. 1056-1064
-
(2010)
Electr. Power Syst. Res.
, vol.80
, Issue.9
, pp. 1056-1064
-
-
Rahmani, M.1
Rashidinejad, M.2
Carreno, E.M.3
Romero, R.4
-
18
-
-
9244247321
-
Market-based transmission expansion planning
-
Buygi, M.O., Balzer, G., Shanechi, H.M., Shahidehpour, M.: 'Market-based transmission expansion planning', IEEE Trans. Power Syst., 2004, 19, (4), pp. 2060-2067
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.4
, pp. 2060-2067
-
-
Buygi, M.O.1
Balzer, G.2
Shanechi, H.M.3
Shahidehpour, M.4
-
19
-
-
60149085905
-
Flexible transmission expansion planning with uncertainties in an electricity market
-
Jun Hua, Z., Zhao Yang, D., Lindsay, P., Kit Po, W.: 'Flexible transmission expansion planning with uncertainties in an electricity market', IEEE Trans. Power Syst., 2009, 24, (1), pp. 479-488
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.1
, pp. 479-488
-
-
Jun Hua, Z.1
Zhao Yang, D.2
Lindsay, P.3
Kit Po, W.4
-
20
-
-
79960892121
-
Flexible transmission network planning considering distributed generation impacts
-
Jun Hua, Z., Foster, J., Zhao Yang, D., Kit Po, W.: 'Flexible transmission network planning considering distributed generation impacts', IEEE Trans. Power Syst., 2011, 26, (3), pp. 1434-1443
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.3
, pp. 1434-1443
-
-
Jun Hua, Z.1
Foster, J.2
Zhao Yang, D.3
Kit Po, W.4
-
21
-
-
43849088797
-
Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations
-
Jirutitijaroen, P., Singh, C.: 'Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations', IEEE Trans. Power Syst., 2008, 23, (2), pp. 504-513
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.2
, pp. 504-513
-
-
Jirutitijaroen, P.1
Singh, C.2
-
23
-
-
0042526113
-
Transmission expansion planning: a mixed-integer Lp approach
-
Alguacil, N., Motto, A.L., Conejo, A.J.: 'Transmission expansion planning: a mixed-integer Lp approach', IEEE Trans. Power Syst., 2003, 18, (3), pp. 1070-1077
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.3
, pp. 1070-1077
-
-
Alguacil, N.1
Motto, A.L.2
Conejo, A.J.3
-
24
-
-
39749087653
-
Transmission expansion planning in electricity markets
-
de la Torre, S., Conejo, A.J., Contreras, J.: 'Transmission expansion planning in electricity markets', IEEE Trans. Power Syst., 2008, 23, (1), pp. 238-248
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.1
, pp. 238-248
-
-
de la Torre, S.1
Conejo, A.J.2
Contreras, J.3
-
25
-
-
0035425561
-
A mixed integer disjunctive model for transmission network expansion
-
Bahiense, L., Oliveira, G.C., Pereira, M., Granville, S.: 'A mixed integer disjunctive model for transmission network expansion', IEEE Trans. Power Syst., 2001, 16, (3), pp. 560-565
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.3
, pp. 560-565
-
-
Bahiense, L.1
Oliveira, G.C.2
Pereira, M.3
Granville, S.4
-
26
-
-
0036127316
-
Test systems and mathematical models for transmission network expansion planning
-
Romero, R., Monticelli, A., Garcia, A., Haffner, S.: 'Test systems and mathematical models for transmission network expansion planning', IEE Proc. Gener. Transm. Distrib., 2002, 149, (1), pp. 27-36
-
(2002)
IEE Proc. Gener. Transm. Distrib.
, vol.149
, Issue.1
, pp. 27-36
-
-
Romero, R.1
Monticelli, A.2
Garcia, A.3
Haffner, S.4
-
27
-
-
80054906305
-
A strategy to solve the multistage transmission expansion planning problem
-
Vinasco, G., Rider, M.J., Romero, R.: 'A strategy to solve the multistage transmission expansion planning problem', IEEE Trans. Power Syst., 2011, 26, (4), pp. 2574-2576
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.4
, pp. 2574-2576
-
-
Vinasco, G.1
Rider, M.J.2
Romero, R.3
-
28
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-Ii
-
Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: 'A fast and elitist multiobjective genetic algorithm: NSGA-Ii', IEEE Trans. Evol. Comput., 2002, 6, (2), pp. 182-197
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
29
-
-
67349261557
-
A multi-objective framework for transmission expansion planning in deregulated environments
-
Maghouli, P., Hosseini, S.H., Buygi, M.O., Shahidehpour, M.: 'A multi-objective framework for transmission expansion planning in deregulated environments', IEEE Trans. Power Syst., 2009, 24, (2), pp. 1051-1061
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 1051-1061
-
-
Maghouli, P.1
Hosseini, S.H.2
Buygi, M.O.3
Shahidehpour, M.4
-
30
-
-
0003404231
-
-
Brooks/Cole-Thomson Learning, Pacific Grove, CA, 2003, 2nd edn.
-
Fourer, R., Gay, D.M., Kernighan, B.W.: 'A Modeling Language for Mathematical Programming' (Brooks/Cole-Thomson Learning, Pacific Grove, CA, 2003, 2nd edn.)
-
A Modeling Language for Mathematical Programming
-
-
Fourer, R.1
Gay, D.M.2
Kernighan, B.W.3
-
31
-
-
0018544097
-
IEEE reliability test system
-
Subcommittee, P.M.: 'IEEE reliability test system', IEEE Trans. Power Appar. Syst., 1979, PAS-98, (6), pp. 2047-2054
-
(1979)
IEEE Trans. Power Appar. Syst.
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
Subcommittee, P.M.1
-
32
-
-
0001035849
-
Branch and bound algorithm for transmission system expansion planning using a transportation model
-
Haffner, S., Monticelli, A., Garcia, A., Mantovani, J., Romero, R.: 'Branch and bound algorithm for transmission system expansion planning using a transportation model', IEE Proc. Gener. Transm. Distrib., 2002, 147, (3), pp. 149-156
-
(2002)
IEE Proc. Gener. Transm. Distrib.
, vol.147
, Issue.3
, pp. 149-156
-
-
Haffner, S.1
Monticelli, A.2
Garcia, A.3
Mantovani, J.4
Romero, R.5
-
33
-
-
0032118050
-
Weighted-norm approach for multiobjective var planning
-
Chen, Y.L.: 'Weighted-norm approach for multiobjective var planning', IEE Proc. Gener. Transm. Distrib., 1998, 145, (4), pp. 369-374
-
(1998)
IEE Proc. Gener. Transm. Distrib.
, vol.145
, Issue.4
, pp. 369-374
-
-
Chen, Y.L.1
-
34
-
-
44349194109
-
Analysis of the cost per kilowatt hour to store electricity
-
Poonpun, P., Jewell, W.T.: 'Analysis of the cost per kilowatt hour to store electricity', IEEE Trans. Energy Convers., 2008, 23, (2), pp. 529-534
-
(2008)
IEEE Trans. Energy Convers.
, vol.23
, Issue.2
, pp. 529-534
-
-
Poonpun, P.1
Jewell, W.T.2
-
35
-
-
33847689868
-
Transmission network expansion planning considering uncertainness in demand
-
Silva, I.D.J., Rider, M.J., Romero, R., Murari, C.A.: 'Transmission network expansion planning considering uncertainness in demand', IEEE Trans. Power Syst., 2006, 21, (4), pp. 1565-1573
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.4
, pp. 1565-1573
-
-
Silva, I.D.J.1
Rider, M.J.2
Romero, R.3
Murari, C.A.4
|