메뉴 건너뛰기




Volumn 26, Issue 3, 2011, Pages 1434-1443

Flexible transmission network planning considering distributed generation impacts

Author keywords

Distributed generation; transmission planning

Indexed keywords

DISTRIBUTED GENERATION TECHNOLOGIES; GENERATION EXPANSION; GENERATION TECHNOLOGIES; MARKET ENVIRONMENT; MARKET VARIABLES; MULTI-OBJECTIVE OPTIMIZATION MODELS; PLANNING OBJECTIVES; POWER INDUSTRY; SIMULATION-BASED METHOD; SYSTEM LOADS; TRANSMISSION EXPANSION; TRANSMISSION EXPANSION PLANNING; TRANSMISSION NETWORK EXPANSION; TRANSMISSION NETWORK PLANNING; TRANSMISSION PLANNING;

EID: 79960892121     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2089994     Document Type: Article
Times cited : (92)

References (33)
  • 1
    • 13844314456 scopus 로고    scopus 로고
    • A fuzzy branch and bound-based transmission system expansion planning for the highest satisfaction level of the decision maker
    • Feb
    • J. Choi, A. A. El-Keib, and T. Tran, "A fuzzy branch and bound-based transmission system expansion planning for the highest satisfaction level of the decision maker," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 474-484, Feb. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.1 , pp. 474-484
    • Choi, J.1    El-Keib, A.A.2    Tran, T.3
  • 4
    • 0028532431 scopus 로고
    • Application of computer software in transmission expansion planning using variable load structure
    • R. S. Chanda and P. K. Bhattacharjee, "Application of computer software in transmission expansion planning using variable load structure," Elect. Power Syst. Research, no. 31, pp. 13-20, 1994.
    • (1994) Elect. Power Syst. Research , Issue.31 , pp. 13-20
    • Chanda, R.S.1    Bhattacharjee, P.K.2
  • 5
    • 0015640477 scopus 로고
    • Transmission planning using discrete dynamic optimization
    • Jul
    • Y. P. Dusonchet and A. H. El-Abiad, "Transmission planning using discrete dynamic optimization," IEEE Trans. Power App. Syst., vol. PAS-92, pp. 1358-1371, Jul. 1973.
    • (1973) IEEE Trans. Power App. Syst. , vol.PAS-92 , pp. 1358-1371
    • Dusonchet, Y.P.1    El-Abiad, A.H.2
  • 6
    • 0024611546 scopus 로고
    • New transmission planning model
    • Feb
    • H. K. Youssef and R. Hackam, "New transmission planning model," IEEE Trans. Power Syst., vol. 4, no. 1, pp. 9-18, Feb. 1989.
    • (1989) IEEE Trans. Power Syst. , vol.4 , Issue.1 , pp. 9-18
    • Youssef, H.K.1    Hackam, R.2
  • 7
    • 0035425561 scopus 로고    scopus 로고
    • A mixed integer disjunctive model for transmission network expansion
    • DOI 10.1109/59.932295, PII S0885895001060801
    • L. Bahiense, G. C. Oliveira, M. Pereira, and S. Granville, "A mixed integer disjunctive model for transmission network expansion," IEEE Trans. Power Syst., vol. 16, no. 3, pp. 560-565, Aug. 2001. (Pubitemid 32680757)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.3 , pp. 560-565
    • Bahiense, L.1    Oliveira, G.C.2    Pereira, M.3    Granville, S.4
  • 8
    • 0037843031 scopus 로고    scopus 로고
    • Classification of publications and models on transmission expansion planning
    • May
    • G. Latorre, R. D. Cruz, J. M. Areiza, and A. Villegas, "Classification of publications and models on transmission expansion planning," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 938-946, May 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.2 , pp. 938-946
    • Latorre, G.1    Cruz, R.D.2    Areiza, J.M.3    Villegas, A.4
  • 9
    • 0034242059 scopus 로고    scopus 로고
    • Transmission network expansion planning under an improved genetic algorithm
    • Aug
    • E. L. da Silva, H. A. Gil, and J. M. Areiza, "Transmission network expansion planning under an improved genetic algorithm," IEEE Trans. Power Syst., vol. 15, no. 3, pp. 1168-1175, Aug. 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.3 , pp. 1168-1175
    • Da Silva, E.L.1    Gil, H.A.2    Areiza, J.M.3
  • 10
    • 0031076597 scopus 로고    scopus 로고
    • Parallel simulated annealing applied to long term transmission network expansion planning
    • R. A. Gallego, A. B. Alves, A. Monticelli, and R. Romero, "Parallel simulated annealing applied to long term transmission network expansion planning," IEEE Trans. Power Syst., vol. 12, no. 1, pp. 181-188, Feb. 1997. (Pubitemid 127771359)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.1 , pp. 181-188
    • Gallego, R.A.1    Alves, A.B.2    Monticelli, A.3    Romero, R.4
  • 11
    • 60149085905 scopus 로고    scopus 로고
    • Flexible transmission expansion planning with uncertainties in an electricity market
    • Feb
    • J. H. Zhao, Z. Y. Dong, P. Lindsay, and K. P. Wong, "Flexible transmission expansion planning with uncertainties in an electricity market," IEEE Trans. Power Syst., vol. 24, no. 1, pp. 479-488, Feb. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.1 , pp. 479-488
    • Zhao, J.H.1    Dong, Z.Y.2    Lindsay, P.3    Wong, K.P.4
  • 12
    • 0035248248 scopus 로고    scopus 로고
    • Transmission network expansion planning under a Tabu Search approach
    • DOI 10.1109/59.910782, PII S0885895001023070
    • E. L. da Silva, J. M. Areiza, G. C. de Oliveira, and S. Binato, "Transmission network expansion planning under a tabu search approach," IEEE Trans. Power Syst., vol. 16, no. 1, pp. 62-68, Feb. 2001. (Pubitemid 32297470)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.1 , pp. 62-68
    • Da Silva, E.L.1    Areiza Ortiz, J.M.2    De Oliveira, G.C.3    Binato, S.4
  • 13
    • 0032141958 scopus 로고    scopus 로고
    • Probabilistic choice vs. risk analysis - conflicts and synthesis in power system planning
    • V. Miranda and L. M. Proenca, "Probabilistic choice vs. risk analysisconflicts and synthesis in power system planning," IEEE Trans. Power Syst., vol. 13, no. 3, pp. 1038-1043, Aug. 1998. (Pubitemid 128748975)
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.3 , pp. 1038-1043
    • Miranda, V.1
  • 14
    • 0037292318 scopus 로고    scopus 로고
    • A new strategy for transmission expansion in competitive electricity markets
    • Feb
    • R. Fang and D. J. Hill, "A new strategy for transmission expansion in competitive electricity markets," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 374-380, Feb. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.1 , pp. 374-380
    • Fang, R.1    Hill, D.J.2
  • 15
    • 43849088797 scopus 로고    scopus 로고
    • Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations
    • DOI 10.1109/TPWRS.2008.919422
    • P. Jirutitijaroen and C. Singh, "Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations," IEEE Trans Power Syst., vol. 23, no. 2, pp. 504-513, May 2008. (Pubitemid 351695829)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 504-513
    • Jirutitijaroen, P.1    Singh, C.2
  • 16
    • 62849124984 scopus 로고    scopus 로고
    • Distributed generation: An empirical analysis of primary motivators
    • May
    • S. Carley, "Distributed generation: An empirical analysis of primary motivators," Energy Policy, vol. 37, pp. 1648-1659, May 2009.
    • (2009) Energy Policy , vol.37 , pp. 1648-1659
    • Carley, S.1
  • 17
    • 0036534828 scopus 로고    scopus 로고
    • Network integration of distributed power generation
    • DOI 10.1016/S0378-7753(01)01031-X, PII S037877530101031X
    • P. Dondi, D. Bayoumi, C. Haederli, D. Julian, and M. Suter, "Network integration of distributed power generation," J. Power Sources, vol. 106, pp. 1-9, 2002. (Pubitemid 34295504)
    • (2002) Journal of Power Sources , vol.106 , Issue.1-2 , pp. 1-9
    • Dondi, P.1    Bayoumi, D.2    Haederli, C.3    Julian, D.4    Suter, M.5
  • 19
    • 31344440800 scopus 로고    scopus 로고
    • Small distributed generation versus centralised supply: A social cost-benefit analysis in the residential and service sectors
    • DOI 10.1016/j.enpol.2004.08.008, PII S0301421504002484
    • F. Gulli, "Small distributed generation versus centralised supply: A social cost-benefit analysis in the residential and service sectors," Energy Policy, vol. 34, no. 7, pp. 804-832, 2006. (Pubitemid 43141629)
    • (2006) Energy Policy , vol.34 , Issue.7 , pp. 804-832
    • Gulli, F.1
  • 21
    • 42249088057 scopus 로고    scopus 로고
    • Multistage model for distribution expansion planning with distributed generation
    • Apr
    • S. Haffner, L. F.A. Pereira, L. A. Pereira, and L. S. Barreto, "Multistage model for distribution expansion planning with distributed generation," IEEE Trans. Power Del., vol. 23, no. 2, pp. 915-929, Apr. 2008.
    • (2008) IEEE Trans. Power Del. , vol.23 , Issue.2 , pp. 915-929
    • Haffner, S.1    Pereira, L.F.A.2    Pereira, L.A.3    Barreto, L.S.4
  • 22
    • 46149087290 scopus 로고    scopus 로고
    • Impact of distributed generation on reliability evaluation of radial distribution systems under network constraints
    • A. C. Neto, M. G. da Silva, and A. B. Rodrigues, "Impact of distributed generation on reliability evaluation of radial distribution systems under network constraints," in Proc. PMAPS Conf., 2006.
    • (2006) Proc. PMAPS Conf.
    • Neto, A.C.1    Da Silva, M.G.2    Rodrigues, A.B.3
  • 23
    • 32144445579 scopus 로고    scopus 로고
    • Impact of DG placement on reliability and efficiency with time-varying loads
    • DOI 10.1109/TPWRS.2005.860943
    • D. Zhu, R. P. Broadwater, K.-S. Tam, R. Seguin, and H. Asgeirsson, "Impact of DG placement on reliability and efficiency with time-varying loads," IEEE Trans. Power Syst., vol. 21, no. 1, pp. 419-427, Feb. 2006. (Pubitemid 43204742)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.1 , pp. 419-427
    • Zhu, D.1    Broadwater, R.P.2    Tam, K.-S.3    Seguin, R.4    Asgeirsson, H.5
  • 24
    • 33947655421 scopus 로고    scopus 로고
    • Impacts of wind power on thermal generation unit commitment and dispatch
    • DOI 10.1109/TEC.2006.889616, Special Issue on Wind Power
    • B. C. Ummels, M. Gibescu, E. Pelgrum, W. L. Kling, and A. J. Brand, "Impacts of wind power on thermal generation unit commitment and dispatch," IEEE Trans Power Convers., vol. 22, no. 1, pp. 44-51, Mar. 2007. (Pubitemid 46487475)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 44-51
    • Ummels, B.C.1    Gibescu, M.2    Pelgrum, E.3    Kling, W.L.4    Brand, A.J.5
  • 27
    • 0001240715 scopus 로고
    • Importance sampling for stochastic simulations
    • P. W. Glynn and D. L. Iglehart, "Importance sampling for stochastic simulations," Manage. Sci., vol. 35, no. 11, pp. 1367-1392, 1989.
    • (1989) Manage. Sci. , vol.35 , Issue.11 , pp. 1367-1392
    • Glynn, P.W.1    Iglehart, D.L.2
  • 28
    • 70349554482 scopus 로고    scopus 로고
    • Adoptability of grid computing in power systems analysis, operations and control
    • Oct
    • M. Ali, Z. Y. Dong, and P. Zhang, "Adoptability of grid computing in power systems analysis, operations and control," IET Gen., Transm., Distrib., vol. 3, no. 10, pp. 949-959, Oct. 2009.
    • (2009) IET Gen., Transm., Distrib. , vol.3 , Issue.10 , pp. 949-959
    • Ali, M.1    Dong, Z.Y.2    Zhang, P.3
  • 31
    • 77954169124 scopus 로고    scopus 로고
    • Draft Report Prepared for the Inter-Regional Planning Committee, ACIL Tasman Pty Ltd
    • Fuel Resources, New Entry and Generation Costs in the NEM, Draft Report Prepared for the Inter-Regional Planning Committee, ACIL Tasman Pty Ltd., 2009.
    • (2009) Fuel Resources, New Entry and Generation Costs in the NEM


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.