-
1
-
-
0020141868
-
Validation, verification and testing of computer software
-
Adrion, W.R., Branstad, M.A. and Cherniavsky, J.C. (1982) 'Validation, verification and testing of computer software', Computing Surveys, Vol. 14, No. 2, pp. 159-192.
-
(1982)
Computing Surveys
, vol.14
, Issue.2
, pp. 159-192
-
-
Adrion, W.R.1
Branstad, M.A.2
Cherniavsky, J.C.3
-
2
-
-
60749101234
-
Simulation optimization for industrial scheduling using hybrid genetic representation
-
Miami, FL
-
Andersson, M., Ng, A.H.C. and Grimm, H. (2008) 'Simulation optimization for industrial scheduling using hybrid genetic representation', Proceedings of 2008 Winter Simulation Conference, Miami, FL, pp. 2004-2011.
-
(2008)
Proceedings of 2008 Winter Simulation Conference
, pp. 2004-2011
-
-
Andersson, M.1
Ng, A.H.C.2
Grimm, H.3
-
3
-
-
0035090747
-
An improvement of the standard Genetic Algorithm fighting premature convergence in continuous optimization
-
Andre, J., Siarry, P. and Dognon, T. (2001) 'An improvement of the standard Genetic Algorithm fighting premature convergence in continuous optimization', Advances in Engineering Software, Vol. 32, No. 1, pp. 49-60.
-
(2001)
Advances in Engineering Software
, vol.32
, Issue.1
, pp. 49-60
-
-
Andre, J.1
Siarry, P.2
Dognon, T.3
-
4
-
-
33646916025
-
Multi-objective Genetic Algorithms: A way to improve the convergence rate
-
Augusto, O.B., Rabeau, S., Dépincé, P. H. and Bennis, F. (2006) 'Multi-objective Genetic Algorithms: a way to improve the convergence rate', Engineering Applications of Artificial Intelligence, Vol. 19, No. 5, pp. 501-510.
-
(2006)
Engineering Applications of Artificial Intelligence
, vol.19
, Issue.5
, pp. 501-510
-
-
Augusto, O.B.1
Rabeau, S.2
Dépincé, P.H.3
Bennis, F.4
-
5
-
-
0031331432
-
Verification, validation and accreditation of simulation models
-
Andradóttir, S., Healy, K.J., Withers, D.H. and Nelson, B.L., Atlanta, GA
-
Balci, O. (1997) 'Verification, validation and accreditation of simulation models', Proceedings of the Winter Simulation Conference, Andradóttir, S., Healy, K.J., Withers, D.H. and Nelson, B.L., Atlanta, GA, pp. 135-141.
-
(1997)
Proceedings of the Winter Simulation Conference
, pp. 135-141
-
-
Balci, O.1
-
6
-
-
0002574341
-
Verification, validation and testing
-
J. Banks, Wiley Interscience, New York
-
Balci, O. (1998) 'Verification, validation and testing', The Handbook of Simulation, J. Banks, Wiley Interscience, New York, pp. 335-393.
-
(1998)
The Handbook of Simulation
, pp. 335-393
-
-
Balci, O.1
-
7
-
-
75449112582
-
Bi-objective Ant Colony Optimization approach to optimize production and maintenance scheduling
-
Berrichi, A., Yalaoui, F., Amodeo, L. and Mezghiche, M. (2010) 'Bi-objective Ant Colony Optimization approach to optimize production and maintenance scheduling', Computers and Operations Research, Vol. 37, No. 9, pp. 1584-1596.
-
(2010)
Computers and Operations Research
, vol.37
, Issue.9
, pp. 1584-1596
-
-
Berrichi, A.1
Yalaoui, F.2
Amodeo, L.3
Mezghiche, M.4
-
8
-
-
18744404504
-
An Ant Colony Optimization algorithm for shop scheduling problem
-
Blum, C. and Sampels, M. (2004) 'An Ant Colony Optimization algorithm for shop scheduling problem', Journal of Mathematical Modelling and Algorithms, Vol. 3, No. 3, pp. 285-308.
-
(2004)
Journal of Mathematical Modelling and Algorithms
, vol.3
, Issue.3
, pp. 285-308
-
-
Blum, C.1
Sampels, M.2
-
9
-
-
0033293924
-
Genetic algorithms and simulation for supporting layout reengineering of automotive component production facilities
-
Bruzzone, A.G., Giribone, P. and Vio, F. (1999) 'Genetic algorithms and simulation for supporting layout reengineering of automotive component production facilities', International Journal of Flexible Automation and Integrated Manufacturing, Vol. 7, No. 3, pp. 379-391.
-
(1999)
International Journal of Flexible Automation and Integrated Manufacturing
, vol.7
, Issue.3
, pp. 379-391
-
-
Bruzzone, A.G.1
Giribone, P.2
Vio, F.3
-
11
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part i representation
-
Cheng, R., Gen, M. and Tsujimura, Y. (1996) 'A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part I representation', Computers & Industrial Engineering, Vol. 30, No. 4, pp. 983-997.
-
(1996)
Computers & Industrial Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
12
-
-
0032599591
-
A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part II hybrid genetic search strategies
-
Cheng, R., Gen, M. and Tsujimura, Y. (1999) 'A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part II hybrid genetic search strategies', Computers & Industrial Engineering, Vol. 37, Nos. 1-2, pp. 51-55.
-
(1999)
Computers & Industrial Engineering
, vol.37
, Issue.1-2
, pp. 51-55
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
13
-
-
0035360038
-
Dynamic scheduling of manufacturing job shops using Genetic Algorithms
-
Chryssolouris, G. and Subramaniam, V. (2001) 'Dynamic scheduling of manufacturing job shops using Genetic Algorithms', Journal of Intelligent Manufacturing, Vol. 12, No. 3, pp. 281-293.
-
(2001)
Journal of Intelligent Manufacturing
, vol.12
, Issue.3
, pp. 281-293
-
-
Chryssolouris, G.1
Subramaniam, V.2
-
14
-
-
84871315573
-
Shop Orders scheduling: Dispatching rules and Genetic Algorithms based approaches
-
Campora S. Giovanni (CS), Italy, 17-19 September
-
Cimino, A., Longo, F., Mirabelli, G. and Papoff, E. (2008) 'Shop Orders scheduling: dispatching rules and Genetic Algorithms based approaches', Proceedings of the European Modeling & Simulation Symposium, Campora S. Giovanni (CS), Italy, 17-19 September, pp. 817-823.
-
(2008)
Proceedings of the European Modeling & Simulation Symposium
, pp. 817-823
-
-
Cimino, A.1
Longo, F.2
Mirabelli, G.3
Papoff, E.4
-
15
-
-
55349114754
-
Inventory policies analysis under demand patterns and lead times constraints in a real supply chain
-
De Sensi, G., Longo, F. and Mirabelli, G. (2008) 'Inventory policies analysis under demand patterns and lead times constraints in a real supply chain', International Journal of Production Research, Vol. 46, No. 24, pp. 6997-7016.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.24
, pp. 6997-7016
-
-
De Sensi, G.1
Longo, F.2
Mirabelli, G.3
-
16
-
-
27644543634
-
Ant Colony Optimization theory: A survey
-
Dorigo, M. and Blum, C. (2005) 'Ant Colony Optimization theory: a survey', Theoretical Computer Science, Vol. 344, Nos. 2-3, pp. 243-278.
-
(2005)
Theoretical Computer Science
, vol.344
, Issue.2-3
, pp. 243-278
-
-
Dorigo, M.1
Blum, C.2
-
20
-
-
84857214813
-
Optimization of genetic operators for scheduling problems
-
Ferrolho, A. and Crisóstomo, M. (2007) 'Optimization of genetic operators for scheduling problems', Journal of Advanced Computational Intelligence and Intelligent Informatics, Vol. 11, No. 9 pp. 1092-1098.
-
(2007)
Journal of Advanced Computational Intelligence and Intelligent Informatics
, vol.11
, Issue.9
, pp. 1092-1098
-
-
Ferrolho, A.1
Crisóstomo, M.2
-
21
-
-
79955656034
-
A simulation-based scheduling system for real-time optimization and decision making
-
Frantzen, M., Ng, A.H.C. and Moore, P. (2011) 'A simulation-based scheduling system for real-time optimization and decision making', Robotics and Computer-Integrated Manufacturing, Vol. 27, No. 4, pp. 696-705.
-
(2011)
Robotics and Computer-Integrated Manufacturing
, vol.27
, Issue.4
, pp. 696-705
-
-
Frantzen, M.1
Ng, A.H.C.2
Moore, P.3
-
22
-
-
0032599597
-
Genetic Algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence
-
Ghedjati, F. (1999) 'Genetic Algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence', Computers & Industrial Engineering, Vol. 37, Nos. 1-2, pp. 39-42.
-
(1999)
Computers & Industrial Engineering
, vol.37
, Issue.1-2
, pp. 39-42
-
-
Ghedjati, F.1
-
23
-
-
0002536833
-
Simulation for analysis of scheduling rules for a Flexible Manufacturing System
-
Goyal, S.K., Mehta, K., Kodali, R. and Deshmukh, S.G. (1995) 'Simulation for analysis of scheduling rules for a Flexible Manufacturing System', Integrated Manufacturing Systems, Vol. 6, No. 5, pp. 21-26.
-
(1995)
Integrated Manufacturing Systems
, vol.6
, Issue.5
, pp. 21-26
-
-
Goyal, S.K.1
Mehta, K.2
Kodali, R.3
Deshmukh, S.G.4
-
24
-
-
0037121184
-
Scheduling continuous casting of aluminum using a multiple objective Ant Colony Optimization metaheuristic
-
Gravel, M., Price, W.L. and Gagné, C. (2002) 'Scheduling continuous casting of aluminum using a multiple objective Ant Colony Optimization metaheuristic', European Journal of Operational Research, Vol. 143, No. 1, pp. 218-229.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.1
, pp. 218-229
-
-
Gravel, M.1
Price, W.L.2
Gagné, C.3
-
25
-
-
0035309164
-
Neural network and Genetic Algorithm-based hybrid approach to expanded job-shop scheduling
-
Haibin, Y. and Wei, L. (2001) 'Neural network and Genetic Algorithm-based hybrid approach to expanded job-shop scheduling', Computers & Industrial Engineering, Vol. 39, Nos. 3-4, pp. 337-356.
-
(2001)
Computers & Industrial Engineering
, vol.39
, Issue.3-4
, pp. 337-356
-
-
Haibin, Y.1
Wei, L.2
-
26
-
-
42449111726
-
Customer order scheduling problem: A comparative metaheuristics study
-
Hazir, O., Günalay, Y. and Erel, E. (2008) 'Customer order scheduling problem: a comparative metaheuristics study', The International Journal of Advanced Manufacturing Technology, Vol. 37, Nos. 5-6, pp. 589-598.
-
(2008)
The International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.5-6
, pp. 589-598
-
-
Hazir, O.1
Günalay, Y.2
Erel, E.3
-
27
-
-
0014089683
-
Validation problems in games and simulations with special reference to models of international politics
-
3 May
-
Hermann, C.F. (1967) 'Validation Problems in Games and Simulations with Special Reference to Models of International Politics', Behavioral Science, Vol. 12, 3 May, pp. 216-231.
-
(1967)
Behavioral Science
, vol.12
, pp. 216-231
-
-
Hermann, C.F.1
-
28
-
-
33747140357
-
Dispatching rules for production scheduling in the capital goods industry
-
Hicks, C. and Pupong, P. (2006) 'Dispatching rules for production scheduling in the capital goods industry', International Journal of Production Economics, Vol. 104, No. 1, pp. 154-163.
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.1
, pp. 154-163
-
-
Hicks, C.1
Pupong, P.2
-
29
-
-
0031246589
-
Design of efficient job shop scheduling rules
-
Holthaus, O. (1997) 'Design of efficient job shop scheduling rules', Computers and Industrial Engineering, Vol. 33, Nos.1-2, pp. 249-252.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.1-2
, pp. 249-252
-
-
Holthaus, O.1
-
30
-
-
0030782894
-
Efficient dispatching rules for scheduling in a job shop
-
Holthaus, O. and Rajendran, C. (1997) 'Efficient dispatching rules for scheduling in a job shop', International Journal of Production Economics, Vol. 48, No. 1, pp. 87-105.
-
(1997)
International Journal of Production Economics
, vol.48
, Issue.1
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
31
-
-
0039574090
-
Task scheduling for flexible manufacturing systems based on genetic algorithms
-
Hou, E.S.H. and Li, H.Y. (1991) 'Task scheduling for Flexible Manufacturing Systems based on Genetic Algorithms', IEEE International Conference on Systems, Man and Cybernetics 1991, Proceedings of the Decision Aiding for Complex Systems Conference, Vol. 1, pp. 397-402.
-
(1991)
IEEE International Conference on Systems, Man and Cybernetics 1991, Proceedings of the Decision Aiding for Complex Systems Conference
, vol.1
, pp. 397-402
-
-
Hou, E.S.H.1
Li, H.Y.2
-
32
-
-
3543134241
-
The sensitivity of rule combinations for scheduling in a hybrid job shop
-
Huq, F. and Huq, Z. (1995) 'The sensitivity of rule combinations for scheduling in a hybrid job shop', International Journal of Operations and Production Management, Vol. 15, No. 3, pp. 59-75.
-
(1995)
International Journal of Operations and Production Management
, vol.15
, Issue.3
, pp. 59-75
-
-
Huq, F.1
Huq, Z.2
-
33
-
-
33644668514
-
Hybrid approach to production scheduling using Genetic Algorithm and simulation
-
Jeong, S.J., Lim, S.J. and Kim, K.S. (2006) 'Hybrid approach to production scheduling using Genetic Algorithm and simulation', The International Journal of Advanced Manufacturing Technology, Vol. 28, Nos. 1-2, pp. 129-136.
-
(2006)
The International Journal of Advanced Manufacturing Technology
, vol.28
, Issue.1-2
, pp. 129-136
-
-
Jeong, S.J.1
Lim, S.J.2
Kim, K.S.3
-
34
-
-
0031176650
-
Supporting production planning by production process simulation
-
Johtela, T., Smed, J., Johnsson, M., Lehtinen, R. and Nevailainen, O. (1997) 'Supporting production planning by production process simulation', Computer Integrated Manufacturing Systems, Vol. 10, No. 3, pp. 193-203.
-
(1997)
Computer Integrated Manufacturing Systems
, vol.10
, Issue.3
, pp. 193-203
-
-
Johtela, T.1
Smed, J.2
Johnsson, M.3
Lehtinen, R.4
Nevailainen, O.5
-
35
-
-
34548692311
-
A comparison of dispatching rules and Genetic Algorithms for job shop schedules of standard hydraulic cylinders
-
Kim, I., Watada, J. and Shigaki, T. (2007) 'A comparison of dispatching rules and Genetic Algorithms for job shop schedules of standard hydraulic cylinders', Soft Computing, Vol. 12, p. 121.
-
(2007)
Soft Computing
, vol.12
, pp. 121
-
-
Kim, I.1
Watada, J.2
Shigaki, T.3
-
36
-
-
33947593937
-
Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine Flexible Manufacturing Systems
-
Kumar, S.N. and Sridharanb, R. (2007) 'Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine Flexible Manufacturing Systems', Robotics and Computer-Integrated Manufacturing, Vol. 23, No. 4, pp. 361-370.
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.4
, pp. 361-370
-
-
Kumar, S.N.1
Sridharanb, R.2
-
37
-
-
0032484447
-
Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
-
Li, Y., Ip, W.H. and Wang, D.W. (1998) 'Genetic algorithm approach to earliness and tardiness production scheduling and planning problem', International Journal of Production Economics, Vol. 54, No. 1, pp. 65-76.
-
(1998)
International Journal of Production Economics
, vol.54
, Issue.1
, pp. 65-76
-
-
Li, Y.1
Ip, W.H.2
Wang, D.W.3
-
38
-
-
0032183949
-
Dispatching rules for stochastic finite capacity scheduling
-
Liu, K.C. (1998) 'Dispatching rules for stochastic finite capacity scheduling', Computers and Industrial Engineering, Vol. 35, No. 1, pp. 113-116.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1
, pp. 113-116
-
-
Liu, K.C.1
-
39
-
-
38849130019
-
An advanced supply chain management tool based on Modeling & Simulation
-
Longo, F. and Mirabelli, G. (2008) 'An advanced supply chain management tool based on Modeling & Simulation', Computers & Industrial Engineering, Vol. 54-3, pp. 570-588.
-
(2008)
Computers & Industrial Engineering
, vol.54
, Issue.3
, pp. 570-588
-
-
Longo, F.1
Mirabelli, G.2
-
40
-
-
43549120956
-
Cape applications in special glass manufacturing
-
Lviv, Ukraine
-
Longo, F., Mirabelli, G. and Papoff, E. (2003) 'Cape applications in special glass manufacturing', Proceedings of Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications, Lviv, Ukraine, pp. 385-389.
-
(2003)
Proceedings of Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications
, pp. 385-389
-
-
Longo, F.1
Mirabelli, G.2
Papoff, E.3
-
41
-
-
49749102940
-
Material flow analysis and plant lay-out optimization of a manufacturing system
-
Longo, F., Mirabelli, G. and Papoff, E. (2006) 'Material flow analysis and plant lay-out optimization of a manufacturing system', International Journal of Computing, Vol. 5, No. 1, pp. 107-116.
-
(2006)
International Journal of Computing
, vol.5
, Issue.1
, pp. 107-116
-
-
Longo, F.1
Mirabelli, G.2
Papoff, E.3
-
42
-
-
0036672003
-
Ant Colony Optimization for resource-constrained project scheduling
-
Merkle, D., Middendorf, M. and Schmeck, H. (2002) 'Ant Colony Optimization for resource-constrained project scheduling', IEEE Transactions on Evolutionary Computation, Vol. 6, No. 4, pp. 333-346.
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
43
-
-
0030242329
-
Study of the behaviour of flexible production systems using neural nets
-
Mosca, R., Giribone, P. and Bruzzone, A.G. (1996) 'Study of the behaviour of flexible production systems using neural nets', International Journal of Production & Control, Vol. 7, No. 5, pp. 462-470.
-
(1996)
International Journal of Production & Control
, vol.7
, Issue.5
, pp. 462-470
-
-
Mosca, R.1
Giribone, P.2
Bruzzone, A.G.3
-
44
-
-
72449178613
-
Simulation modeling and analysis for production scheduling using realtime dispatching rules: A case study in canned fruit industry
-
Parthanadeea, P. and Buddhakulsomsirib, J. (2010) 'Simulation modeling and analysis for production scheduling using realtime dispatching rules: a case study in canned fruit industry', Computers and Electronics in Agriculture, Vol. 70, No. 1, pp. 245-255.
-
(2010)
Computers and Electronics in Agriculture
, vol.70
, Issue.1
, pp. 245-255
-
-
Parthanadeea, P.1
Buddhakulsomsirib, J.2
-
45
-
-
4344694303
-
Optimization of logistic and manufacturing systems through simulation: A colored petri net-based methodology
-
Piera, M.A., Narciso, M., Guasch, A. and Riera, D. (2004). 'Optimization of logistic and manufacturing systems through simulation: a colored petri net-based methodology', Simulation, Vol. 80, No. 3, pp. 121-129.
-
(2004)
Simulation
, vol.80
, Issue.3
, pp. 121-129
-
-
Piera, M.A.1
Narciso, M.2
Guasch, A.3
Riera, D.4
-
47
-
-
0027228843
-
Intelligent scheduling for flexible manufacturing systems
-
Rabelol, L., Yih, Y., Jones, A. and Tsail, J-S. (1993) 'Intelligent scheduling for Flexible Manufacturing Systems', Proceedings IEEE International Conference on Robotics and Automation, Vol. 3, pp. 810-815.
-
(1993)
Proceedings IEEE International Conference on Robotics and Automation
, vol.3
, pp. 810-815
-
-
Rabelol, L.1
Yih, Y.2
Jones, A.3
Tsail, J.-S.4
-
48
-
-
1642559633
-
Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
-
Rajendran, C. and Ziegler, H. (2004) 'Ant-Colony Algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs', European Journal of Operational Research, Vol. 155, No. 2, pp. 426-438.
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.2
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
49
-
-
0035546054
-
An integrated production planning and scheduling system for hybrid flowshop organizations
-
Riane, F., Artiba, A. and Iassinovski, S. (2001) 'An integrated production planning and scheduling system for hybrid flowshop organizations', International Journal of Production Economics, Vol. 74, Nos. 1-3, pp. 33-48.
-
(2001)
International Journal of Production Economics
, vol.74
, Issue.1-3
, pp. 33-48
-
-
Riane, F.1
Artiba, A.2
Iassinovski, S.3
-
50
-
-
0032000897
-
A study of scheduling rules of Flexible Manufacturing Systems: A simulation approach
-
Sabuncuoglu, I. (1998) 'A study of scheduling rules of Flexible Manufacturing Systems: a simulation approach', International Journal of Production Research, Vol. 36, No. 2, pp. 527-546.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 527-546
-
-
Sabuncuoglu, I.1
-
51
-
-
0032592176
-
An efficient Genetic Algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy Due Date
-
Sakawa, M. and Mori, T. (1999) 'An efficient Genetic Algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy Due Date', Computers & Industrial Engineering, Vol. 36, No. 2, pp. 325-341.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.2
, pp. 325-341
-
-
Sakawa, M.1
Mori, T.2
-
52
-
-
0142185333
-
A multi-objective genetic algorithm for scheduling a Flexible Manufacturing System
-
Sankar, S.S., Ponnanbalam, S.G. and Rajendran, C. (2003) 'A multi-objective genetic algorithm for scheduling a Flexible Manufacturing System', International Journal in Advanced Manufacturing Technologies, Vol. 22, No. 1, pp. 229-236.
-
(2003)
International Journal in Advanced Manufacturing Technologies
, vol.22
, Issue.1
, pp. 229-236
-
-
Sankar, S.S.1
Ponnanbalam, S.G.2
Rajendran, C.3
-
53
-
-
6344253119
-
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total Completion Time
-
Shyu, S.J., Lin, B.M.T. and Yin, P. Y. (2004) 'Application of Ant Colony Optimization for no-wait flowshop scheduling problem to minimize the total Completion Time', Computers & Industrial Engineering, Vol. 47, Nos. 2-3, pp. 181-193.
-
(2004)
Computers & Industrial Engineering
, vol.47
, Issue.2-3
, pp. 181-193
-
-
Shyu, S.J.1
Lin, B.M.T.2
Yin, P.Y.3
-
54
-
-
43549119353
-
Rescheduling and optimization of logistic processes using GA and ACO
-
Silva, C.A., Sousa, J.M.C. and Runkler, T.A. (2008) 'Rescheduling and optimization of logistic processes using GA and ACO', Engineering Applications of Artificial Intelligence, Vol. 21, No. 3, pp. 343-352.
-
(2008)
Engineering Applications of Artificial Intelligence
, vol.21
, Issue.3
, pp. 343-352
-
-
Silva, C.A.1
Sousa, J.M.C.2
Runkler, T.A.3
-
55
-
-
0001225037
-
A multipass simulation-based, real-time Scheduling and shop floor control system
-
Son, Y.J., Rodríguez-Rivera, H. and Wysk, R.A. (1999) 'A multipass simulation-based, real-time Scheduling and shop floor control system', Transactions of the Society for Computer Simulation International -Modeling and Simulation in Manufacturing, Vol. 16, No. 4, pp. 159-172.
-
(1999)
Transactions of the Society for Computer Simulation International -Modeling and Simulation in Manufacturing
, vol.16
, Issue.4
, pp. 159-172
-
-
Son, Y.J.1
Rodríguez-Rivera, H.2
Wysk, R.A.3
-
56
-
-
0002755938
-
Scheduling optimization using Genetic Algorithms
-
Davis, L. (Ed.): Van Nostrand Reinhold, New York
-
Syswerda, G. (1991) 'Scheduling optimization using Genetic Algorithms', Davis, L. (Ed.): Handbook of Genetic Algorithms, Van Nostrand Reinhold, New York, pp. 332-349.
-
(1991)
Handbook of Genetic Algorithms
, pp. 332-349
-
-
Syswerda, G.1
-
57
-
-
57049118551
-
Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
-
Vinod, V. and Sridharan, R. (2009) 'Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times', International Journal of Production Research, Vol. 47, No. 6 , pp. 1425-1447.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.6
, pp. 1425-1447
-
-
Vinod, V.1
Sridharan, R.2
-
58
-
-
78649318482
-
Simulation modeling and analysis of Due-Date assignment methods and scheduling decision rules in a dynamic job shop production system
-
Vinod, V. and Sridharan, R. (2011) 'Simulation modeling and analysis of Due-Date assignment methods and scheduling decision rules in a dynamic job shop production system', International Journal of Production Economics, Vol. 129, No. 1, pp. 127-146.
-
(2011)
International Journal of Production Economics
, vol.129
, Issue.1
, pp. 127-146
-
-
Vinod, V.1
Sridharan, R.2
-
59
-
-
0035324670
-
An effective hybrid optimization strategy for job-shop scheduling problems
-
Wang, L. and Zheng, D. (2001) 'An effective hybrid optimization strategy for job-shop scheduling problems', Computers & Operations Research, Vol. 28, No. 6, pp. 585-596.
-
(2001)
Computers & Operations Research
, vol.28
, Issue.6
, pp. 585-596
-
-
Wang, L.1
Zheng, D.2
-
60
-
-
0029190021
-
A Genetic Algorithm with multi-step crossover for job-shop scheduling problems
-
Sheffield, UK
-
Yamada, T. and Nakano, R. (1995) 'A Genetic Algorithm with multi-step crossover for job-shop scheduling problems', GALESIA 1995: Proceedings of the International Conference on Genetic Algorithms in Engineering Systems: Innovations and Applications, Sheffield, UK, pp. 146-151.
-
(1995)
GALESIA 1995: Proceedings of the International Conference on Genetic Algorithms in Engineering Systems: Innovations and Applications
, pp. 146-151
-
-
Yamada, T.1
Nakano, R.2
-
61
-
-
0036721680
-
Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems
-
Yun, Y.S. (2002) 'Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems', Computers & Industrial Engineering, Vol. 43, No. 3, pp. 623-644.
-
(2002)
Computers & Industrial Engineering
, vol.43
, Issue.3
, pp. 623-644
-
-
Yun, Y.S.1
-
62
-
-
0035399781
-
The hybrid heuristic genetic algorithm for job shop scheduling
-
Zhou, H., Feng, Y. and Han, L. (2001) 'The hybrid heuristic genetic algorithm for job shop scheduling', Computers and Industrial Engineering, Vol. 40, pp. 191-200.
-
(2001)
Computers and Industrial Engineering
, vol.40
, pp. 191-200
-
-
Zhou, H.1
Feng, Y.2
Han, L.3
|