메뉴 건너뛰기




Volumn 8, Issue 1, 2013, Pages 17-28

On the short period production planning in industrial plants: A real case study

Author keywords

Discrete event simulation; Dispatching rules; Gas; Genetic algorithms; SO scheduling: shop order scheduling

Indexed keywords

ANT COLONY OPTIMIZATION; COMPUTATIONAL EFFICIENCY; DISCRETE EVENT SIMULATION; ENTERPRISE RESOURCE PLANNING; GALLIUM; GENETIC ALGORITHMS; INDUSTRIAL RESEARCH; MANUFACTURE; PLANNING; PRODUCTION CONTROL; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 84880652197     PISSN: 17402123     EISSN: 17402131     Source Type: Journal    
DOI: 10.1504/IJSPM.2013.055189     Document Type: Article
Times cited : (25)

References (62)
  • 1
    • 0020141868 scopus 로고
    • Validation, verification and testing of computer software
    • Adrion, W.R., Branstad, M.A. and Cherniavsky, J.C. (1982) 'Validation, verification and testing of computer software', Computing Surveys, Vol. 14, No. 2, pp. 159-192.
    • (1982) Computing Surveys , vol.14 , Issue.2 , pp. 159-192
    • Adrion, W.R.1    Branstad, M.A.2    Cherniavsky, J.C.3
  • 2
    • 60749101234 scopus 로고    scopus 로고
    • Simulation optimization for industrial scheduling using hybrid genetic representation
    • Miami, FL
    • Andersson, M., Ng, A.H.C. and Grimm, H. (2008) 'Simulation optimization for industrial scheduling using hybrid genetic representation', Proceedings of 2008 Winter Simulation Conference, Miami, FL, pp. 2004-2011.
    • (2008) Proceedings of 2008 Winter Simulation Conference , pp. 2004-2011
    • Andersson, M.1    Ng, A.H.C.2    Grimm, H.3
  • 3
    • 0035090747 scopus 로고    scopus 로고
    • An improvement of the standard Genetic Algorithm fighting premature convergence in continuous optimization
    • Andre, J., Siarry, P. and Dognon, T. (2001) 'An improvement of the standard Genetic Algorithm fighting premature convergence in continuous optimization', Advances in Engineering Software, Vol. 32, No. 1, pp. 49-60.
    • (2001) Advances in Engineering Software , vol.32 , Issue.1 , pp. 49-60
    • Andre, J.1    Siarry, P.2    Dognon, T.3
  • 5
    • 0031331432 scopus 로고    scopus 로고
    • Verification, validation and accreditation of simulation models
    • Andradóttir, S., Healy, K.J., Withers, D.H. and Nelson, B.L., Atlanta, GA
    • Balci, O. (1997) 'Verification, validation and accreditation of simulation models', Proceedings of the Winter Simulation Conference, Andradóttir, S., Healy, K.J., Withers, D.H. and Nelson, B.L., Atlanta, GA, pp. 135-141.
    • (1997) Proceedings of the Winter Simulation Conference , pp. 135-141
    • Balci, O.1
  • 6
    • 0002574341 scopus 로고    scopus 로고
    • Verification, validation and testing
    • J. Banks, Wiley Interscience, New York
    • Balci, O. (1998) 'Verification, validation and testing', The Handbook of Simulation, J. Banks, Wiley Interscience, New York, pp. 335-393.
    • (1998) The Handbook of Simulation , pp. 335-393
    • Balci, O.1
  • 7
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective Ant Colony Optimization approach to optimize production and maintenance scheduling
    • Berrichi, A., Yalaoui, F., Amodeo, L. and Mezghiche, M. (2010) 'Bi-objective Ant Colony Optimization approach to optimize production and maintenance scheduling', Computers and Operations Research, Vol. 37, No. 9, pp. 1584-1596.
    • (2010) Computers and Operations Research , vol.37 , Issue.9 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 8
    • 18744404504 scopus 로고    scopus 로고
    • An Ant Colony Optimization algorithm for shop scheduling problem
    • Blum, C. and Sampels, M. (2004) 'An Ant Colony Optimization algorithm for shop scheduling problem', Journal of Mathematical Modelling and Algorithms, Vol. 3, No. 3, pp. 285-308.
    • (2004) Journal of Mathematical Modelling and Algorithms , vol.3 , Issue.3 , pp. 285-308
    • Blum, C.1    Sampels, M.2
  • 9
    • 0033293924 scopus 로고    scopus 로고
    • Genetic algorithms and simulation for supporting layout reengineering of automotive component production facilities
    • Bruzzone, A.G., Giribone, P. and Vio, F. (1999) 'Genetic algorithms and simulation for supporting layout reengineering of automotive component production facilities', International Journal of Flexible Automation and Integrated Manufacturing, Vol. 7, No. 3, pp. 379-391.
    • (1999) International Journal of Flexible Automation and Integrated Manufacturing , vol.7 , Issue.3 , pp. 379-391
    • Bruzzone, A.G.1    Giribone, P.2    Vio, F.3
  • 11
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part i representation
    • Cheng, R., Gen, M. and Tsujimura, Y. (1996) 'A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part I representation', Computers & Industrial Engineering, Vol. 30, No. 4, pp. 983-997.
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.4 , pp. 983-997
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 12
    • 0032599591 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part II hybrid genetic search strategies
    • Cheng, R., Gen, M. and Tsujimura, Y. (1999) 'A tutorial survey of job-shop scheduling problems using Genetic Algorithms: Part II hybrid genetic search strategies', Computers & Industrial Engineering, Vol. 37, Nos. 1-2, pp. 51-55.
    • (1999) Computers & Industrial Engineering , vol.37 , Issue.1-2 , pp. 51-55
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 13
    • 0035360038 scopus 로고    scopus 로고
    • Dynamic scheduling of manufacturing job shops using Genetic Algorithms
    • Chryssolouris, G. and Subramaniam, V. (2001) 'Dynamic scheduling of manufacturing job shops using Genetic Algorithms', Journal of Intelligent Manufacturing, Vol. 12, No. 3, pp. 281-293.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , Issue.3 , pp. 281-293
    • Chryssolouris, G.1    Subramaniam, V.2
  • 14
    • 84871315573 scopus 로고    scopus 로고
    • Shop Orders scheduling: Dispatching rules and Genetic Algorithms based approaches
    • Campora S. Giovanni (CS), Italy, 17-19 September
    • Cimino, A., Longo, F., Mirabelli, G. and Papoff, E. (2008) 'Shop Orders scheduling: dispatching rules and Genetic Algorithms based approaches', Proceedings of the European Modeling & Simulation Symposium, Campora S. Giovanni (CS), Italy, 17-19 September, pp. 817-823.
    • (2008) Proceedings of the European Modeling & Simulation Symposium , pp. 817-823
    • Cimino, A.1    Longo, F.2    Mirabelli, G.3    Papoff, E.4
  • 15
    • 55349114754 scopus 로고    scopus 로고
    • Inventory policies analysis under demand patterns and lead times constraints in a real supply chain
    • De Sensi, G., Longo, F. and Mirabelli, G. (2008) 'Inventory policies analysis under demand patterns and lead times constraints in a real supply chain', International Journal of Production Research, Vol. 46, No. 24, pp. 6997-7016.
    • (2008) International Journal of Production Research , vol.46 , Issue.24 , pp. 6997-7016
    • De Sensi, G.1    Longo, F.2    Mirabelli, G.3
  • 16
    • 27644543634 scopus 로고    scopus 로고
    • Ant Colony Optimization theory: A survey
    • Dorigo, M. and Blum, C. (2005) 'Ant Colony Optimization theory: a survey', Theoretical Computer Science, Vol. 344, Nos. 2-3, pp. 243-278.
    • (2005) Theoretical Computer Science , vol.344 , Issue.2-3 , pp. 243-278
    • Dorigo, M.1    Blum, C.2
  • 21
    • 79955656034 scopus 로고    scopus 로고
    • A simulation-based scheduling system for real-time optimization and decision making
    • Frantzen, M., Ng, A.H.C. and Moore, P. (2011) 'A simulation-based scheduling system for real-time optimization and decision making', Robotics and Computer-Integrated Manufacturing, Vol. 27, No. 4, pp. 696-705.
    • (2011) Robotics and Computer-Integrated Manufacturing , vol.27 , Issue.4 , pp. 696-705
    • Frantzen, M.1    Ng, A.H.C.2    Moore, P.3
  • 22
    • 0032599597 scopus 로고    scopus 로고
    • Genetic Algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence
    • Ghedjati, F. (1999) 'Genetic Algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence', Computers & Industrial Engineering, Vol. 37, Nos. 1-2, pp. 39-42.
    • (1999) Computers & Industrial Engineering , vol.37 , Issue.1-2 , pp. 39-42
    • Ghedjati, F.1
  • 23
    • 0002536833 scopus 로고
    • Simulation for analysis of scheduling rules for a Flexible Manufacturing System
    • Goyal, S.K., Mehta, K., Kodali, R. and Deshmukh, S.G. (1995) 'Simulation for analysis of scheduling rules for a Flexible Manufacturing System', Integrated Manufacturing Systems, Vol. 6, No. 5, pp. 21-26.
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.5 , pp. 21-26
    • Goyal, S.K.1    Mehta, K.2    Kodali, R.3    Deshmukh, S.G.4
  • 24
    • 0037121184 scopus 로고    scopus 로고
    • Scheduling continuous casting of aluminum using a multiple objective Ant Colony Optimization metaheuristic
    • Gravel, M., Price, W.L. and Gagné, C. (2002) 'Scheduling continuous casting of aluminum using a multiple objective Ant Colony Optimization metaheuristic', European Journal of Operational Research, Vol. 143, No. 1, pp. 218-229.
    • (2002) European Journal of Operational Research , vol.143 , Issue.1 , pp. 218-229
    • Gravel, M.1    Price, W.L.2    Gagné, C.3
  • 25
    • 0035309164 scopus 로고    scopus 로고
    • Neural network and Genetic Algorithm-based hybrid approach to expanded job-shop scheduling
    • Haibin, Y. and Wei, L. (2001) 'Neural network and Genetic Algorithm-based hybrid approach to expanded job-shop scheduling', Computers & Industrial Engineering, Vol. 39, Nos. 3-4, pp. 337-356.
    • (2001) Computers & Industrial Engineering , vol.39 , Issue.3-4 , pp. 337-356
    • Haibin, Y.1    Wei, L.2
  • 27
    • 0014089683 scopus 로고
    • Validation problems in games and simulations with special reference to models of international politics
    • 3 May
    • Hermann, C.F. (1967) 'Validation Problems in Games and Simulations with Special Reference to Models of International Politics', Behavioral Science, Vol. 12, 3 May, pp. 216-231.
    • (1967) Behavioral Science , vol.12 , pp. 216-231
    • Hermann, C.F.1
  • 28
    • 33747140357 scopus 로고    scopus 로고
    • Dispatching rules for production scheduling in the capital goods industry
    • Hicks, C. and Pupong, P. (2006) 'Dispatching rules for production scheduling in the capital goods industry', International Journal of Production Economics, Vol. 104, No. 1, pp. 154-163.
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 154-163
    • Hicks, C.1    Pupong, P.2
  • 29
    • 0031246589 scopus 로고    scopus 로고
    • Design of efficient job shop scheduling rules
    • Holthaus, O. (1997) 'Design of efficient job shop scheduling rules', Computers and Industrial Engineering, Vol. 33, Nos.1-2, pp. 249-252.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.1-2 , pp. 249-252
    • Holthaus, O.1
  • 30
  • 32
    • 3543134241 scopus 로고
    • The sensitivity of rule combinations for scheduling in a hybrid job shop
    • Huq, F. and Huq, Z. (1995) 'The sensitivity of rule combinations for scheduling in a hybrid job shop', International Journal of Operations and Production Management, Vol. 15, No. 3, pp. 59-75.
    • (1995) International Journal of Operations and Production Management , vol.15 , Issue.3 , pp. 59-75
    • Huq, F.1    Huq, Z.2
  • 35
    • 34548692311 scopus 로고    scopus 로고
    • A comparison of dispatching rules and Genetic Algorithms for job shop schedules of standard hydraulic cylinders
    • Kim, I., Watada, J. and Shigaki, T. (2007) 'A comparison of dispatching rules and Genetic Algorithms for job shop schedules of standard hydraulic cylinders', Soft Computing, Vol. 12, p. 121.
    • (2007) Soft Computing , vol.12 , pp. 121
    • Kim, I.1    Watada, J.2    Shigaki, T.3
  • 36
    • 33947593937 scopus 로고    scopus 로고
    • Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine Flexible Manufacturing Systems
    • Kumar, S.N. and Sridharanb, R. (2007) 'Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine Flexible Manufacturing Systems', Robotics and Computer-Integrated Manufacturing, Vol. 23, No. 4, pp. 361-370.
    • (2007) Robotics and Computer-Integrated Manufacturing , vol.23 , Issue.4 , pp. 361-370
    • Kumar, S.N.1    Sridharanb, R.2
  • 37
    • 0032484447 scopus 로고    scopus 로고
    • Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
    • Li, Y., Ip, W.H. and Wang, D.W. (1998) 'Genetic algorithm approach to earliness and tardiness production scheduling and planning problem', International Journal of Production Economics, Vol. 54, No. 1, pp. 65-76.
    • (1998) International Journal of Production Economics , vol.54 , Issue.1 , pp. 65-76
    • Li, Y.1    Ip, W.H.2    Wang, D.W.3
  • 38
    • 0032183949 scopus 로고    scopus 로고
    • Dispatching rules for stochastic finite capacity scheduling
    • Liu, K.C. (1998) 'Dispatching rules for stochastic finite capacity scheduling', Computers and Industrial Engineering, Vol. 35, No. 1, pp. 113-116.
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.1 , pp. 113-116
    • Liu, K.C.1
  • 39
    • 38849130019 scopus 로고    scopus 로고
    • An advanced supply chain management tool based on Modeling & Simulation
    • Longo, F. and Mirabelli, G. (2008) 'An advanced supply chain management tool based on Modeling & Simulation', Computers & Industrial Engineering, Vol. 54-3, pp. 570-588.
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.3 , pp. 570-588
    • Longo, F.1    Mirabelli, G.2
  • 41
    • 49749102940 scopus 로고    scopus 로고
    • Material flow analysis and plant lay-out optimization of a manufacturing system
    • Longo, F., Mirabelli, G. and Papoff, E. (2006) 'Material flow analysis and plant lay-out optimization of a manufacturing system', International Journal of Computing, Vol. 5, No. 1, pp. 107-116.
    • (2006) International Journal of Computing , vol.5 , Issue.1 , pp. 107-116
    • Longo, F.1    Mirabelli, G.2    Papoff, E.3
  • 43
    • 0030242329 scopus 로고    scopus 로고
    • Study of the behaviour of flexible production systems using neural nets
    • Mosca, R., Giribone, P. and Bruzzone, A.G. (1996) 'Study of the behaviour of flexible production systems using neural nets', International Journal of Production & Control, Vol. 7, No. 5, pp. 462-470.
    • (1996) International Journal of Production & Control , vol.7 , Issue.5 , pp. 462-470
    • Mosca, R.1    Giribone, P.2    Bruzzone, A.G.3
  • 44
    • 72449178613 scopus 로고    scopus 로고
    • Simulation modeling and analysis for production scheduling using realtime dispatching rules: A case study in canned fruit industry
    • Parthanadeea, P. and Buddhakulsomsirib, J. (2010) 'Simulation modeling and analysis for production scheduling using realtime dispatching rules: a case study in canned fruit industry', Computers and Electronics in Agriculture, Vol. 70, No. 1, pp. 245-255.
    • (2010) Computers and Electronics in Agriculture , vol.70 , Issue.1 , pp. 245-255
    • Parthanadeea, P.1    Buddhakulsomsirib, J.2
  • 45
    • 4344694303 scopus 로고    scopus 로고
    • Optimization of logistic and manufacturing systems through simulation: A colored petri net-based methodology
    • Piera, M.A., Narciso, M., Guasch, A. and Riera, D. (2004). 'Optimization of logistic and manufacturing systems through simulation: a colored petri net-based methodology', Simulation, Vol. 80, No. 3, pp. 121-129.
    • (2004) Simulation , vol.80 , Issue.3 , pp. 121-129
    • Piera, M.A.1    Narciso, M.2    Guasch, A.3    Riera, D.4
  • 48
    • 1642559633 scopus 로고    scopus 로고
    • Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
    • Rajendran, C. and Ziegler, H. (2004) 'Ant-Colony Algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs', European Journal of Operational Research, Vol. 155, No. 2, pp. 426-438.
    • (2004) European Journal of Operational Research , vol.155 , Issue.2 , pp. 426-438
    • Rajendran, C.1    Ziegler, H.2
  • 49
    • 0035546054 scopus 로고    scopus 로고
    • An integrated production planning and scheduling system for hybrid flowshop organizations
    • Riane, F., Artiba, A. and Iassinovski, S. (2001) 'An integrated production planning and scheduling system for hybrid flowshop organizations', International Journal of Production Economics, Vol. 74, Nos. 1-3, pp. 33-48.
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 33-48
    • Riane, F.1    Artiba, A.2    Iassinovski, S.3
  • 50
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of Flexible Manufacturing Systems: A simulation approach
    • Sabuncuoglu, I. (1998) 'A study of scheduling rules of Flexible Manufacturing Systems: a simulation approach', International Journal of Production Research, Vol. 36, No. 2, pp. 527-546.
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 51
    • 0032592176 scopus 로고    scopus 로고
    • An efficient Genetic Algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy Due Date
    • Sakawa, M. and Mori, T. (1999) 'An efficient Genetic Algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy Due Date', Computers & Industrial Engineering, Vol. 36, No. 2, pp. 325-341.
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.2 , pp. 325-341
    • Sakawa, M.1    Mori, T.2
  • 53
    • 6344253119 scopus 로고    scopus 로고
    • Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total Completion Time
    • Shyu, S.J., Lin, B.M.T. and Yin, P. Y. (2004) 'Application of Ant Colony Optimization for no-wait flowshop scheduling problem to minimize the total Completion Time', Computers & Industrial Engineering, Vol. 47, Nos. 2-3, pp. 181-193.
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.2-3 , pp. 181-193
    • Shyu, S.J.1    Lin, B.M.T.2    Yin, P.Y.3
  • 56
    • 0002755938 scopus 로고
    • Scheduling optimization using Genetic Algorithms
    • Davis, L. (Ed.): Van Nostrand Reinhold, New York
    • Syswerda, G. (1991) 'Scheduling optimization using Genetic Algorithms', Davis, L. (Ed.): Handbook of Genetic Algorithms, Van Nostrand Reinhold, New York, pp. 332-349.
    • (1991) Handbook of Genetic Algorithms , pp. 332-349
    • Syswerda, G.1
  • 57
    • 57049118551 scopus 로고    scopus 로고
    • Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
    • Vinod, V. and Sridharan, R. (2009) 'Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times', International Journal of Production Research, Vol. 47, No. 6 , pp. 1425-1447.
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1425-1447
    • Vinod, V.1    Sridharan, R.2
  • 58
    • 78649318482 scopus 로고    scopus 로고
    • Simulation modeling and analysis of Due-Date assignment methods and scheduling decision rules in a dynamic job shop production system
    • Vinod, V. and Sridharan, R. (2011) 'Simulation modeling and analysis of Due-Date assignment methods and scheduling decision rules in a dynamic job shop production system', International Journal of Production Economics, Vol. 129, No. 1, pp. 127-146.
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 127-146
    • Vinod, V.1    Sridharan, R.2
  • 59
    • 0035324670 scopus 로고    scopus 로고
    • An effective hybrid optimization strategy for job-shop scheduling problems
    • Wang, L. and Zheng, D. (2001) 'An effective hybrid optimization strategy for job-shop scheduling problems', Computers & Operations Research, Vol. 28, No. 6, pp. 585-596.
    • (2001) Computers & Operations Research , vol.28 , Issue.6 , pp. 585-596
    • Wang, L.1    Zheng, D.2
  • 61
    • 0036721680 scopus 로고    scopus 로고
    • Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems
    • Yun, Y.S. (2002) 'Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems', Computers & Industrial Engineering, Vol. 43, No. 3, pp. 623-644.
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.3 , pp. 623-644
    • Yun, Y.S.1
  • 62
    • 0035399781 scopus 로고    scopus 로고
    • The hybrid heuristic genetic algorithm for job shop scheduling
    • Zhou, H., Feng, Y. and Han, L. (2001) 'The hybrid heuristic genetic algorithm for job shop scheduling', Computers and Industrial Engineering, Vol. 40, pp. 191-200.
    • (2001) Computers and Industrial Engineering , vol.40 , pp. 191-200
    • Zhou, H.1    Feng, Y.2    Han, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.