메뉴 건너뛰기




Volumn 66, Issue 5-8, 2013, Pages 663-677

A dynamic modeling to measure lean performance within lean attributes

Author keywords

Dynamic scheduling; Fuzzy logic; Lean attributes; Lean manufacturing; Lean performance

Indexed keywords

DECISION MAKERS; DYNAMIC SCHEDULING; FUZZY MEMBERSHIP FUNCTION; INNOVATIVE APPROACHES; LEAN ATTRIBUTES; LEAN MANUFACTURING; LEAN PERFORMANCE; LEAN PRACTICES;

EID: 84880569874     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4356-0     Document Type: Article
Times cited : (57)

References (67)
  • 3
    • 15344346506 scopus 로고    scopus 로고
    • A complete cellular manufacturing system design methodology based on axiomatic design principles
    • 10.1016/j.cie.2004.12.006
    • Kulaka O, Durmusoglua MB, Tufekci S (2005) A complete cellular manufacturing system design methodology based on axiomatic design principles. Comput Ind Eng 48:765-787
    • (2005) Comput Ind Eng , vol.48 , pp. 765-787
    • Kulaka, O.1    Durmusoglua, M.B.2    Tufekci, S.3
  • 4
    • 80052845542 scopus 로고    scopus 로고
    • A group AHP-based tool to evaluate effective factors toward leanness in automotive industries
    • doi: 10.3923/jas.20ll
    • Anvari AR, Mojahed M, Zulkifli N, Yusuff RM, Ismail Y, Hojjati SMH (2011) A group AHP-based tool to evaluate effective factors toward leanness in automotive industries. J Appl Sci. doi: 10.3923/jas.20ll
    • (2011) J Appl Sci.
    • Anvari, A.R.1    Mojahed, M.2    Zulkifli, N.3    Yusuff, R.M.4    Ismail, Y.5    Smh, H.6
  • 5
    • 84880571238 scopus 로고    scopus 로고
    • A proposed dynamic model for a lean roadmap
    • Anvari AR, Zulkifli N, Yusuff RM, Ismail, Y, Hojjati SMH (2011) A proposed dynamic model for a lean roadmap, Afr J Bus Manag 5(16): 6727-6737, Available online at http://www.academicjournals.org/AJBM
    • (2011) Afr J Bus Manag , vol.5 , Issue.16 , pp. 6727-6737
    • Anvari, A.R.1    Zulkifli, N.2    Yusuff, R.M.3    Ismail, Y.4    Smh, H.5
  • 6
    • 77949489584 scopus 로고    scopus 로고
    • A genetic approach to two-phase optimization of dynamic supply chain scheduling
    • 10.1016/j.cie.2009.01.010
    • Yimer AD, Demirli K (2010) A genetic approach to two-phase optimization of dynamic supply chain scheduling. Comput Ind Eng 58:411-422
    • (2010) Comput Ind Eng , vol.58 , pp. 411-422
    • Yimer, A.D.1    Demirli, K.2
  • 7
    • 43449105121 scopus 로고    scopus 로고
    • Optimal manufacturing-remanufacturing policies in a lean production environment
    • 10.1016/j.cie.2007.12.009
    • Rubio S, Corominas A (2008) Optimal manufacturing-remanufacturing policies in a lean production environment. Comput Ind Eng 55:234-242
    • (2008) Comput Ind Eng , vol.55 , pp. 234-242
    • Rubio, S.1    Corominas, A.2
  • 8
    • 80053198873 scopus 로고    scopus 로고
    • The operations-time chart: A graphical tool to evaluate the performance of production systems - From batch-and-queue to lean manufacturing
    • Cuatrecasas-Arbos L, Fortuny-Santos J, Vintro-Sanchez C (2011) The operations-time chart: a graphical tool to evaluate the performance of production systems - from batch-and-queue to lean manufacturing. Comput Ind Eng 61:661-675
    • (2011) Comput Ind Eng , vol.61 , pp. 661-675
    • Cuatrecasas-Arbos, L.1    Fortuny-Santos, J.2    Vintro-Sanchez, C.3
  • 9
    • 54349104675 scopus 로고    scopus 로고
    • A leanness measure of manufacturing systems for quantifying impacts of lean initiatives
    • 10.1080/00207540802230058
    • Wan H-D, Chen FF (2008) A leanness measure of manufacturing systems for quantifying impacts of lean initiatives. Int J Prod Res 46(23):6567-6584
    • (2008) Int J Prod Res , vol.46 , Issue.23 , pp. 6567-6584
    • Wan, H.-D.1    Chen, F.F.2
  • 10
    • 65249125901 scopus 로고    scopus 로고
    • Relationship building, lean strategy and firm performance: An exploratory study in the automotive supplier industry
    • 10.1080/00207540701429942
    • Jayram J, Vickery S, Droge C (2008) Relationship building, lean strategy and firm performance: an exploratory study in the automotive supplier industry. Int J Prod Res 46(20):5633-5649
    • (2008) Int J Prod Res , vol.46 , Issue.20 , pp. 5633-5649
    • Jayram, J.1    Vickery, S.2    Droge, C.3
  • 11
    • 84875013477 scopus 로고    scopus 로고
    • A study on total quality management and lean manufacturing: Through lean thinking approach
    • Anvari AR, Ismail Y, Hojjati SMH (2011) A study on total quality management and lean manufacturing: through lean thinking approach. World Appl Sci J 12(9):1585-1596
    • (2011) World Appl Sci J , vol.12 , Issue.9 , pp. 1585-1596
    • Anvari, A.R.1    Ismail, Y.2    Hojjati, S.M.H.3
  • 12
    • 84986064418 scopus 로고    scopus 로고
    • A paradigm for benchmarking Lean initiatives for quality improvement
    • 10.1108/14635770010298584
    • Comm CL, Mathaisel DFX (2000) A paradigm for benchmarking Lean initiatives for quality improvement. Benchmark Int J 7(2):118-127
    • (2000) Benchmark Int J , vol.7 , Issue.2 , pp. 118-127
    • Comm, C.L.1    Mathaisel, D.F.X.2
  • 14
    • 0034694501 scopus 로고    scopus 로고
    • Lean, agile or leagile? Matching your supply chain to the marketplace
    • 10.1080/00207540050204920
    • Mason-Jones R, Naylor B, Towill DR (2000) Lean, agile or leagile? Matching your supply chain to the marketplace. Int J Prod Res 38(17):4061-4070
    • (2000) Int J Prod Res , vol.38 , Issue.17 , pp. 4061-4070
    • Mason-Jones, R.1    Naylor, B.2    Towill, D.R.3
  • 15
    • 79952606248 scopus 로고    scopus 로고
    • On leanness, agility and leagile supply chains
    • 10.1016/j.ijpe.2010.04.045
    • Naim MM, Gosling J (2011) On leanness, agility and leagile supply chains. Int J Prod Econ 131(1):342-354
    • (2011) Int J Prod Econ , vol.131 , Issue.1 , pp. 342-354
    • Naim, M.M.1    Gosling, J.2
  • 16
    • 0043263143 scopus 로고    scopus 로고
    • Lean supply: The design and cost reduction dimensions
    • 10.1016/S0969-7012(01)00004-1
    • McIvor R (2001) Lean supply: the design and cost reduction dimensions. Eur J Purch Supply Manag 7:227-242
    • (2001) Eur J Purch Supply Manag , vol.7 , pp. 227-242
    • McIvor, R.1
  • 17
    • 0036190151 scopus 로고    scopus 로고
    • A model for evaluating the degree of leanness of manufacturing: Firms
    • 10.1108/09576060210415437
    • Soriano-Meier H, Forrester PL (2002) A model for evaluating the degree of leanness of manufacturing: firms. Int J Integr Manuf Syst 13:104-109
    • (2002) Int J Integr Manuf Syst , vol.13 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.L.2
  • 18
    • 79957485734 scopus 로고    scopus 로고
    • Fuzzy logic based leanness assessment and its decision support system
    • 10.1080/00207543.2010.492408
    • Vinodh S, Balaji SR (2011) Fuzzy logic based leanness assessment and its decision support system. Int J Prod Res 49(13):4027-4041
    • (2011) Int J Prod Res , vol.49 , Issue.13 , pp. 4027-4041
    • Vinodh, S.1    Balaji, S.R.2
  • 19
    • 78649476496 scopus 로고    scopus 로고
    • Leanness assessment using multi-grade fuzzy approach
    • 10.1080/00207540903471494
    • Vinodh S, Chintha SK (2011) Leanness assessment using multi-grade fuzzy approach. Int J Prod Res 49(2):431-445
    • (2011) Int J Prod Res , vol.49 , Issue.2 , pp. 431-445
    • Vinodh, S.1    Chintha, S.K.2
  • 20
    • 78650616330 scopus 로고    scopus 로고
    • Application of fuzzy QFD for enabling leanness in a manufacturing organisation
    • 10.1080/00207540903568729
    • Vinodh S, Chintha SK (2011) Application of fuzzy QFD for enabling leanness in a manufacturing organisation. Int J Prod Res 49(6):1627-1644
    • (2011) Int J Prod Res , vol.49 , Issue.6 , pp. 1627-1644
    • Vinodh, S.1    Chintha, S.K.2
  • 21
    • 84861660001 scopus 로고    scopus 로고
    • Thirty criteria based leanness assessment using fuzzy logic approach
    • doi: 10.1007/s00170-011-3658-y
    • Vinodh S, Vimal KEK (2011) Thirty criteria based leanness assessment using fuzzy logic approach. Int J Adv Manuf Technol. doi: 10.1007/s00170-011- 3658-y
    • (2011) Int J Adv Manuf Technol.
    • Vinodh, S.1    Kek, V.2
  • 22
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of Lean production
    • Shah R, Ward PT (2007) Defining and developing measures of Lean production. J Oper Manag 25(4):21
    • (2007) J Oper Manag , vol.25 , Issue.4 , pp. 21
    • Shah, R.1    Ward, P.T.2
  • 23
    • 84880572778 scopus 로고    scopus 로고
    • RFID opportunity analysis for leaner manufacturing
    • Brintrupa A, Ranasingheb D, McFarlanea D (2010) RFID opportunity analysis for leaner manufacturing. Int J Prod Res 47(18):5237-5243
    • (2010) Int J Prod Res , vol.47 , Issue.18 , pp. 5237-5243
    • Brintrupa, A.1    Ranasingheb, D.2    McFarlanea, D.3
  • 25
    • 84931560829 scopus 로고    scopus 로고
    • The strategic role of lean production in SOE's development
    • Sun S (2011) The strategic role of lean production in SOE's development. Int J Bus Manag 6(2):160-168
    • (2011) Int J Bus Manag , vol.6 , Issue.2 , pp. 160-168
    • Sun, S.1
  • 27
    • 79953727831 scopus 로고    scopus 로고
    • Extracting leanness criteria by employing the concept of balanced scorecard
    • doi: 10.1016/j.eswa.2011.02.095
    • Seyedhosseini SM, Taleghani AE, Bakhsha A, Partovi S (2011) Extracting leanness criteria by employing the concept of balanced scorecard. Expert Syst Appl. doi: 10.1016/j.eswa.2011.02.095
    • (2011) Expert Syst Appl.
    • Seyedhosseini, S.M.1    Taleghani, A.E.2    Bakhsha, A.3    Partovi, S.4
  • 30
    • 77958011613 scopus 로고    scopus 로고
    • Developing a lean design for Six Sigma through supply chain methodology
    • 10.1504/IJPQM.2010.035891
    • Lee M-C, Chang T (2010) Developing a lean design for Six Sigma through supply chain methodology. Int J Product Qual Manag 6(4):407-434
    • (2010) Int J Product Qual Manag , vol.6 , Issue.4 , pp. 407-434
    • Lee, M.-C.1    Chang, T.2
  • 32
    • 77953755982 scopus 로고    scopus 로고
    • "The lean value principle in military aerospace product development" the Lean Aerospace Initiative
    • Slack RA (1999) "The lean value principle in military aerospace product development" The Lean Aerospace Initiative. Report Series, RP99-01-16
    • (1999) Report Series, RP99-01-16
    • Slack, R.A.1
  • 33
    • 0036449680 scopus 로고    scopus 로고
    • TPM: Situations and procedures for a soft introduction in Italian factories
    • 10.1108/09544780210447456
    • Ferrari E, Pareschi A, Persona A, Regattieri A (2002) TPM: situations and procedures for a soft introduction in Italian factories. TQM Mag 14:350-359
    • (2002) TQM Mag , vol.14 , pp. 350-359
    • Ferrari, E.1    Pareschi, A.2    Persona, A.3    Regattieri, A.4
  • 34
    • 3342927933 scopus 로고    scopus 로고
    • Biotechnology - Better than lean manufacturing and information technology
    • Vinas T (2004) Biotechnology - better than lean manufacturing and information technology. Ind Week 253:30-39
    • (2004) Ind Week , vol.253 , pp. 30-39
    • Vinas, T.1
  • 36
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the Lean and agile manufacturing paradigms
    • 10.1016/S0925-5273(98)00223-0
    • Naylor BJ, Naim MM, Berry D (1999) Leagility: integrating the Lean and agile manufacturing paradigms. Int J Prod Econ 62:107-118
    • (1999) Int J Prod Econ , vol.62 , pp. 107-118
    • Naylor, B.J.1    Naim, M.M.2    Berry, D.3
  • 37
    • 79251615534 scopus 로고    scopus 로고
    • A strategy for assessing costs of implementing new practices in the child welfare system: Adapting the English cost calculator in the United States
    • 10.1007/s10488-010-0318-8
    • Chamberlain P, Snowden LR, Padgett C, Saldana L, Roles J, Holmes L, Ward H, Soper J, Reid J, Sverk J (2011) A strategy for assessing costs of implementing new practices in the child welfare system: adapting the English cost calculator in the United States. Adm Policy Ment Health 38:24-31
    • (2011) Adm Policy Ment Health , vol.38 , pp. 24-31
    • Chamberlain, P.1    Snowden, L.R.2    Padgett, C.3    Saldana, L.4    Roles, J.5    Holmes, L.6    Ward, H.7    Soper, J.8    Reid, J.9    Sverk, J.10
  • 38
    • 70449561153 scopus 로고    scopus 로고
    • Scheduling job shop problems with sequence-dependent setup times
    • 1198.90198 10.1080/00207540802165817
    • Naderi B, Zandieh M, Fatemi-Ghomi SMT (2009) Scheduling job shop problems with sequence-dependent setup times. Int J Prod Res 47(21):5959-5976
    • (2009) Int J Prod Res , vol.47 , Issue.21 , pp. 5959-5976
    • Naderi, B.1    Zandieh, M.2    Fatemi-Ghomi, S.M.T.3
  • 40
    • 34547808744 scopus 로고    scopus 로고
    • Measuring the impact of Lean tools on the cost-time investment of a product using cost-time profiles
    • 10.1016/j.rcim.2007.02.013 10.1016/j.rcim.2007.02.013
    • Rivera L, Chen F (2007) Measuring the impact of Lean tools on the cost-time investment of a product using cost-time profiles. Robot Comput Integr Manuf 23(6):684-689. doi: 10.1016/j.rcim.2007.02.013
    • (2007) Robot Comput Integr Manuf , vol.23 , Issue.6 , pp. 684-689
    • Rivera, L.1    Chen, F.2
  • 41
    • 78751625703 scopus 로고    scopus 로고
    • Value management in the South African manufacturing industry: Exploratory findings
    • 10.1108/00251741111094419 10.1108/00251741111094419
    • Bowen P, Cattell K, Jay I (2011) Value management in the South African manufacturing industry: exploratory findings. Manag Decis 49(1):6-28. doi: 10.1108/00251741111094419
    • (2011) Manag Decis , vol.49 , Issue.1 , pp. 6-28
    • Bowen, P.1    Cattell, K.2    Jay, I.3
  • 45
    • 3543108498 scopus 로고    scopus 로고
    • The seven value stream mapping tools
    • 10.1108/01443579710157989
    • Hines P, Rich N (1997) The seven value stream mapping tools. Int J Oper Prod Manag 17(1):46-64
    • (1997) Int J Oper Prod Manag , vol.17 , Issue.1 , pp. 46-64
    • Hines, P.1    Rich, N.2
  • 49
    • 33747370919 scopus 로고    scopus 로고
    • A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies
    • 10.1016/j.ijpe.2005.10.004
    • Herron C, Braiden P (2006) A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies. Int J Prod Econ Elsevier Publisher 104(1):143-153
    • (2006) Int J Prod Econ Elsevier Publisher , vol.104 , Issue.1 , pp. 143-153
    • Herron, C.1    Braiden, P.2
  • 51
    • 0037063831 scopus 로고    scopus 로고
    • Agility evaluation of mass customization product manufacturing
    • 10.1016/S0924-0136(02)00674-X
    • Yang SL, Li TF (2002) Agility evaluation of mass customization product manufacturing. J Mater Process Technol 129(1-3):640-644
    • (2002) J Mater Process Technol , vol.129 , Issue.1-3 , pp. 640-644
    • Yang, S.L.1    Li, T.F.2
  • 53
    • 0026896675 scopus 로고
    • Linguistic decision making models
    • 10.1002/int.4550070507
    • Delgado M, Verdegay JL, Vila V (1993) Linguistic decision making models. Int J Intell Syst 7(5):479-492
    • (1993) Int J Intell Syst , vol.7 , Issue.5 , pp. 479-492
    • Delgado, M.1    Verdegay, J.L.2    Vila, V.3
  • 54
    • 32644470629 scopus 로고    scopus 로고
    • Lean tool selection in a die casting unit: A fuzzy-based decision support heuristic
    • 10.1080/00207540500272980
    • Singh RK, Kumar S, Choudhuri AK, Tiwari MK (2006) Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic. Int J Prod Res 44(7):1399-1429
    • (2006) Int J Prod Res , vol.44 , Issue.7 , pp. 1399-1429
    • Singh, R.K.1    Kumar, S.2    Choudhuri, A.K.3    Tiwari, M.K.4
  • 55
    • 34248666540 scopus 로고
    • Fuzzy sets
    • doi: 10.1016/S0019-9958(65)90241-X, 10.1016/S0019-9958(65)90241-X
    • Zadeh L A (1965) Fuzzy sets. Information and Control 8(3): 338-353. doi: 10.1016/S0019-9958(65)90241-X, 10.1016/S0019-9958(65)90241-X
    • (1965) Information and Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 56
    • 0020843799 scopus 로고
    • Fuzzy logic as a basis for the management of uncertainly in expert systems
    • 727205 0553.68049 10.1016/S0165-0114(83)80081-5
    • Zadeh LA (1983) Fuzzy logic as a basis for the management of uncertainly in expert systems. Fuzzy Set Syst 11:199-227
    • (1983) Fuzzy Set Syst , vol.11 , pp. 199-227
    • Zadeh, L.A.1
  • 59
    • 0040333649 scopus 로고    scopus 로고
    • New approaches for the comparison of L-R fuzzy numbers: A theoretical and operational analysis
    • 1809388 0972.03055 10.1016/S0165-0114(98)00425-4
    • Matarazzo B, Munda G (2001) New approaches for the comparison of L-R fuzzy numbers: a theoretical and operational analysis. Fuzzy Set Syst 118:407-418
    • (2001) Fuzzy Set Syst , vol.118 , pp. 407-418
    • Matarazzo, B.1    Munda, G.2
  • 60
    • 0033901620 scopus 로고    scopus 로고
    • Fuzzy critical path method based on signed distance ranking of fuzzy numbers
    • 10.1109/3468.823483
    • Yao JS, Lin FT (2000) Fuzzy critical path method based on signed distance ranking of fuzzy numbers. IEEE Trans Syst Man Cybern Syst Hum 30:76-82
    • (2000) IEEE Trans Syst Man Cybern Syst Hum , vol.30 , pp. 76-82
    • Yao, J.S.1    Lin, F.T.2
  • 61
    • 0000903516 scopus 로고    scopus 로고
    • Ranking fuzzy numbers based on decomposition principle and signed distance
    • 1788399 1179.62031 10.1016/S0165-0114(98)00122-5
    • Yao JS, Wu K (2000) Ranking fuzzy numbers based on decomposition principle and signed distance. Fuzzy Set Syst 116:275-288
    • (2000) Fuzzy Set Syst , vol.116 , pp. 275-288
    • Yao, J.S.1    Wu, K.2
  • 62
    • 33646938828 scopus 로고    scopus 로고
    • Ranking of fuzzy numbers by sign distance
    • 2247406 05078113 10.1016/j.ins.2005.03.013
    • Abbasbandy S, Asady B (2006) Ranking of fuzzy numbers by sign distance. Inf Sci 176:2405-2416
    • (2006) Inf Sci , vol.176 , pp. 2405-2416
    • Abbasbandy, S.1    Asady, B.2
  • 63
    • 34250208827 scopus 로고    scopus 로고
    • Ranking fuzzy numbers by distance minimization, applied mathematical
    • 1211.03069 10.1016/j.apm.2006.10.018
    • Asady B, Zendehnam A (2007) Ranking fuzzy numbers by distance minimization, applied mathematical. Appl Math Model 31(11):2589-2598
    • (2007) Appl Math Model , vol.31 , Issue.11 , pp. 2589-2598
    • Asady, B.1    Zendehnam, A.2
  • 64
    • 0037119853 scopus 로고    scopus 로고
    • Comparison of fuzzy numbers using a fuzzy distance measure
    • 10.1016/S0165-0114(01)00195-6
    • Tran L, Duckein L (2002) Comparison of fuzzy numbers using a fuzzy distance measure. Fuzzy Set Syst 35:331-341
    • (2002) Fuzzy Set Syst , vol.35 , pp. 331-341
    • Tran, L.1    Duckein, L.2
  • 65
    • 64549157689 scopus 로고    scopus 로고
    • Ranking L-R fuzzy number based on deviation degree
    • 2552850 1166.90349 10.1016/j.ins.2008.08.017
    • Wang Z-X, Liu Y-J, Fan Z-P, Feng B (2009) Ranking L-R fuzzy number based on deviation degree. Inf Sci 179:2070-2077
    • (2009) Inf Sci , vol.179 , pp. 2070-2077
    • Wang, Z.-X.1    Liu, Y.-J.2    Fan, Z.-P.3    Feng, B.4
  • 66
    • 33746185651 scopus 로고    scopus 로고
    • Ranking fuzzy number based on lexicographic screening procedure
    • 10.1142/S0219622005001696
    • Wang ML, Wang HF, Lung LC (2005) Ranking fuzzy number based on lexicographic screening procedure. Int J Inf Technol Decis Mak 4:663-678
    • (2005) Int J Inf Technol Decis Mak , vol.4 , pp. 663-678
    • Wang, M.L.1    Wang, H.F.2    Lung, L.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.