메뉴 건너뛰기




Volumn 32, Issue , 2013, Pages 39-48

Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem

Author keywords

Aircraft sequencing problem; Greedy algorithms; Metaheuristics; Sequence dependent separation times; Total weighted tardiness

Indexed keywords

AIRCRAFT; AIRPORT; ALGORITHM; HEURISTICS; OPTIMIZATION;

EID: 84880355468     PISSN: 09696997     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jairtraman.2013.06.001     Document Type: Article
Times cited : (100)

References (40)
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: a computer method of sequencing operations for assembly lines
    • Arcus A.L. COMSOAL: a computer method of sequencing operations for assembly lines. International Journal of Production Research 1966, 4:259-277.
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 3
  • 5
    • 78651429336 scopus 로고    scopus 로고
    • Algorithms for scheduling runway operations under constrained position shifting
    • Balakrishnan H., Chandran B. Algorithms for scheduling runway operations under constrained position shifting. Operations Research 2010, 58(6):1650-1665.
    • (2010) Operations Research , vol.58 , Issue.6 , pp. 1650-1665
    • Balakrishnan, H.1    Chandran, B.2
  • 10
    • 3142716780 scopus 로고    scopus 로고
    • Genetic algorithms for solving the aircraft-sequencing problem: the introduction of departures into the dynamic model
    • Capri S., Ignaccolo M. Genetic algorithms for solving the aircraft-sequencing problem: the introduction of departures into the dynamic model. Journal of Air Transport Management 2004, 10:345-351.
    • (2004) Journal of Air Transport Management , vol.10 , pp. 345-351
    • Capri, S.1    Ignaccolo, M.2
  • 11
    • 70349277164 scopus 로고    scopus 로고
    • Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints
    • Chen J.F. Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints. International Journal of Advanced Manufacturing Technologies 2009, 44:1204-1212.
    • (2009) International Journal of Advanced Manufacturing Technologies , vol.44 , pp. 1204-1212
    • Chen, J.F.1
  • 12
    • 77956227173 scopus 로고    scopus 로고
    • Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    • Damodaran P., Gallego M.C. Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times. International Journal of Advanced Manufacturing Technologies 2010, 49:1119-1128.
    • (2010) International Journal of Advanced Manufacturing Technologies , vol.49 , pp. 1119-1128
    • Damodaran, P.1    Gallego, M.C.2
  • 13
    • 0024874811 scopus 로고
    • The dynamic scheduling of aircraft in high density terminal areas
    • Dear R.G., Sherif Y.S. The dynamic scheduling of aircraft in high density terminal areas. Microelectrons Reliability 1989, 29:743-749.
    • (1989) Microelectrons Reliability , vol.29 , pp. 743-749
    • Dear, R.G.1    Sherif, Y.S.2
  • 14
    • 0001469168 scopus 로고
    • An algorithm for computer assisted sequencing and scheduling of terminal area operations
    • Dear R.G., Sherif Y.S. An algorithm for computer assisted sequencing and scheduling of terminal area operations. Transportation Research 1991, 25A:29-139.
    • (1991) Transportation Research , vol.25 A , pp. 29-139
    • Dear, R.G.1    Sherif, Y.S.2
  • 20
    • 0346461743 scopus 로고    scopus 로고
    • Genetic search methods in air traffic control
    • Hansen J.V. Genetic search methods in air traffic control. Computers & Operations Research 2004, 31:445-459.
    • (2004) Computers & Operations Research , vol.31 , pp. 445-459
    • Hansen, J.V.1
  • 21
    • 18144368528 scopus 로고    scopus 로고
    • Genetic algorithm based on receding horizon control for arrival sequencing and scheduling
    • Hu X.B., Chen W.H. Genetic algorithm based on receding horizon control for arrival sequencing and scheduling. Engineering Applications of Artificial Intelligence 2005, 18:633-642.
    • (2005) Engineering Applications of Artificial Intelligence , vol.18 , pp. 633-642
    • Hu, X.B.1    Chen, W.H.2
  • 24
    • 70349743955 scopus 로고    scopus 로고
    • The single-machine total tardiness scheduling problem: review and extensions
    • Koulamas C. The single-machine total tardiness scheduling problem: review and extensions. European Journal of Operational Research 2010, 202:1-7.
    • (2010) European Journal of Operational Research , vol.202 , pp. 1-7
    • Koulamas, C.1
  • 25
    • 2842528625 scopus 로고
    • Heuristic procedure for the single machine problem to minimize maximum lateness
    • Larson R.E., Dessouky M.I. Heuristic procedure for the single machine problem to minimize maximum lateness. AIIE Transactions 1978, 10:176-183.
    • (1978) AIIE Transactions , vol.10 , pp. 176-183
    • Larson, R.E.1    Dessouky, M.I.2
  • 27
    • 0000482108 scopus 로고    scopus 로고
    • Theory and methodology: scheduling jobs on parallel machines with sequence-dependent setup times
    • Lee Y.H., Pinedo M. Theory and methodology: scheduling jobs on parallel machines with sequence-dependent setup times. European Journal of Operational Research 1997, 100:464-474.
    • (1997) European Journal of Operational Research , vol.100 , pp. 464-474
    • Lee, Y.H.1    Pinedo, M.2
  • 28
    • 79952897919 scopus 로고    scopus 로고
    • Agenetic local search algorithm with a threshold accepting mechanism for solving with a threshold accepting mechanism for solving the runway dependent aircraft landing problem
    • Liu Y.H. Agenetic local search algorithm with a threshold accepting mechanism for solving with a threshold accepting mechanism for solving the runway dependent aircraft landing problem. Optimization Letters 2010, 5:229-245.
    • (2010) Optimization Letters , vol.5 , pp. 229-245
    • Liu, Y.H.1
  • 31
    • 13844256873 scopus 로고    scopus 로고
    • Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    • Mönch L., Balasubramanian H., Fowler J.W., Pfund M.E. Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computers & Operations Research 2005, 32:2731-2750.
    • (2005) Computers & Operations Research , vol.32 , pp. 2731-2750
    • Mönch, L.1    Balasubramanian, H.2    Fowler, J.W.3    Pfund, M.E.4
  • 35
    • 28244491662 scopus 로고    scopus 로고
    • Scatter search and bionomic algorithms for the aircraft landing problem
    • Pinol H., Beasley J.E. Scatter search and bionomic algorithms for the aircraft landing problem. European Journal of Operational Research 2006, 171:439-462.
    • (2006) European Journal of Operational Research , vol.171 , pp. 439-462
    • Pinol, H.1    Beasley, J.E.2
  • 36
    • 0019089428 scopus 로고
    • Dynamic programming approach for sequencing group of identified jobs
    • Psaraftis H.N. Dynamic programming approach for sequencing group of identified jobs. Operations Research 1980, 28:1347-1359.
    • (1980) Operations Research , vol.28 , pp. 1347-1359
    • Psaraftis, H.N.1
  • 38
    • 0026890350 scopus 로고
    • An integrated simulation and dynamic programming approach for determining optimal runway exit locations
    • Sherali H.D., Hobeika A.G., Trani A.A., Kim B.J. An integrated simulation and dynamic programming approach for determining optimal runway exit locations. Management Science 1992, 38:1049-1062.
    • (1992) Management Science , vol.38 , pp. 1049-1062
    • Sherali, H.D.1    Hobeika, A.G.2    Trani, A.A.3    Kim, B.J.4
  • 39
    • 85059020399 scopus 로고    scopus 로고
    • Manuscript, Grado Department of Industrial and Systems Engineering (0118). Virginia Polytechnic Institute and State University, 250 Durham Hall, Blacksburg, VA 24061.
    • Sherali, H.D., Ghoniem, A., Baik, H., Trani, A.A., 2010. A combined arrival-departure aircraft sequencing problem. Manuscript, Grado Department of Industrial and Systems Engineering (0118). Virginia Polytechnic Institute and State University, 250 Durham Hall, Blacksburg, VA 24061.
    • (2010) A combined arrival-departure aircraft sequencing problem
    • Sherali, H.D.1    Ghoniem, A.2    Baik, H.3    Trani, A.A.4
  • 40
    • 2842564834 scopus 로고    scopus 로고
    • Real-time scheduling of multimedia data retrieval to minimize buffer requirement
    • Tsai W.J., Lee S.Y. Real-time scheduling of multimedia data retrieval to minimize buffer requirement. ACM SIGOPS Operating Systems Review 1996, 30:67-80.
    • (1996) ACM SIGOPS Operating Systems Review , vol.30 , pp. 67-80
    • Tsai, W.J.1    Lee, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.