메뉴 건너뛰기




Volumn 10, Issue 3, 2013, Pages 318-327

Unsupervised Artificial Neural Networks (ANNs) for intelligent pheromone up gradation. Further evolution of neural augmented ant colony optimization (NaACO)

Author keywords

Neural augmented ant colony optimization (NaACO); Pheromone update; Unsupervised Artificial Neural Networks (ANN)

Indexed keywords


EID: 84880280744     PISSN: 10978135     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (4)

References (34)
  • 2
    • 67650725536 scopus 로고    scopus 로고
    • Nonstandard Work in Japan and Korea-the Origin of Wage Differentials
    • March 1
    • Ahn, Joyup. "Nonstandard Work in Japan and Korea-the Origin of Wage Differentials". In Nonstandard Work-Draft, March 1, 2006.
    • (2006) Nonstandard Work-Draft
    • Ahn, J.1
  • 3
    • 0345671714 scopus 로고    scopus 로고
    • Ant colony optimization for FOP shop scheduling: A case study on different pheromone representations
    • D B Fogel, M A ElSharkawi, X Yao, G Greenwood, H Iba, P Marrow, M Shackleton (eds), Piscataway, NJ, IEEE Press
    • Blum C, Sampels M 2002 Ant colony optimization for FOP shop scheduling: A case study on different pheromone representations. Proceedings of the 2002 Congress on Evolutionary Computation (CEC-02), D B Fogel, M A ElSharkawi, X Yao, G Greenwood, H Iba, P Marrow, M Shackleton (eds), Piscataway, NJ, IEEE Press, pp.1558-1563.
    • (2002) Proceedings of the 2002 Congress On Evolutionary Computation (CEC-02) , pp. 1558-1563
    • Blum, C.1    Sampels, M.2
  • 4
    • 84947905083 scopus 로고    scopus 로고
    • Ant colony optimization for the total weighted tardiness problem
    • M Schoenauer, K Deb, G Rudolph, X Yao, E Lutton, J J Merelo, H P Schwefel (eds), Berlin, Springer-Verlag
    • Den Besten M L, Stutzle T, Dorigo M 2000 Ant colony optimization for the total weighted tardiness problem. Proceedings of PPSN-VI, Sixth International Conference on Parallel Problem Solving from Nature, M Schoenauer, K Deb, G Rudolph, X Yao, E Lutton, J J Merelo, H P Schwefel (eds), Berlin, Springer-Verlag, pp. 611-620.
    • (2000) Proceedings of PPSN-VI, Sixth International Conference On Parallel Problem Solving From Nature , pp. 611-620
    • Den, B.M.L.1    Stutzle, T.2    Dorigo, M.3
  • 8
    • 0002983810 scopus 로고
    • Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I
    • Fisher M L 1973 Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I. Operations Research, 21(5): 1114-1127.
    • (1973) Operations Research , vol.21 , Issue.5 , pp. 1114-1127
    • Fisher, M.L.1
  • 11
    • 34250608222 scopus 로고
    • La reconstruction du nid et les coordinations interindividuelles lles chez
    • Grasse P P 1959 La reconstruction du nid et les coordinations interindividuelles lles chez. bellicositermes natalensis et cubitermes sp, 6: 41-81
    • (1959) Bellicositermes Natalensis Et Cubitermes Sp , vol.6 , pp. 41-81
    • Grasse, P.P.1
  • 12
    • 0021835689 scopus 로고
    • Neural computation of decisions in optimization problems
    • Hopfield J, Tank D W 1985 Neural computation of decisions in optimization problems. Biological Cybernetics, 52.
    • (1985) Biological Cybernetics , vol.52
    • Hopfield, J.1    Tank, D.W.2
  • 13
    • 1942473649 scopus 로고    scopus 로고
    • Minimizing total tardiness for the worker assignment scheduling problem in identical parallel-machine models
    • Hu P-C 2004. Minimizing total tardiness for the worker assignment scheduling problem in identical parallel-machine models. International Journal of Advanced Manufacturing Technology, 23(5-6): 383-388.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.23 , Issue.5-6 , pp. 383-388
    • Hu, P.-C.1
  • 14
    • 18144417504 scopus 로고    scopus 로고
    • Minimizing total flow time for the worker assignment scheduling problem in the identical parallel-machine model
    • Hu P-C 2005 Minimizing total flow time for the worker assignment scheduling problem in the identical parallel-machine model. International Journal of Advanced Manufacturing Technology, 25(9-10): 1046-1052.
    • (2005) International Journal of Advanced Manufacturing Technology , vol.25 , Issue.9-10 , pp. 1046-1052
    • Hu, P.-C.1
  • 15
    • 33745726702 scopus 로고    scopus 로고
    • Further study of minimizing total flow time for the worker assignment scheduling problem in the identical parallel machine models
    • Hu P-C 2006 Further study of minimizing total flow time for the worker assignment scheduling problem in the identical parallel machine models. International Journal of Advanced Manufacturing Technology, 29(7-8): 753-757
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.7-8 , pp. 753-757
    • Hu, P.-C.1
  • 16
    • 33744535196 scopus 로고    scopus 로고
    • Further study of minimizing total tardiness for the worker assignment scheduling problem in the identical parallel machine model
    • Hu P-C 2006 Further study of minimizing total tardiness for the worker assignment scheduling problem in the identical parallel machine model. International Journal of Advanced Manufacturing Technology, 29: 165-169.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , pp. 165-169
    • Hu, P.-C.1
  • 17
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimization combined with taboo search for the job shop scheduling problem
    • Huang K, Liao C 2008 Ant colony optimization combined with taboo search for the job shop scheduling problem. Computers and Operations Research, 35: 1030-1046.
    • (2008) Computers and Operations Research , vol.35 , pp. 1030-1046
    • Huang, K.1    Liao, C.2
  • 19
    • 84856254457 scopus 로고    scopus 로고
    • An Evolving Neural Network Using an Ant Colony Algorithm for a Permeability Estimation of the Reservoir
    • Irani R, Nasimi R 2012 An Evolving Neural Network Using an Ant Colony Algorithm for a Permeability Estimation of the Reservoir. Petroleum science and Technology, 30(4): 375-384
    • (2012) Petroleum Science and Technology , vol.30 , Issue.4 , pp. 375-384
    • Irani, R.1    Nasimi, R.2
  • 20
    • 79951775233 scopus 로고    scopus 로고
    • Experimental investigations of forces and torque in conventional and ultrasonically-assisted drilling of cortical bone
    • March, DOI: 10.1016/j.medengphy.2010.10.003
    • K. Alam, A.V. Mitrofanov, V.V. Silberschmidt, 2010 Experimental investigations of forces and torque in conventional and ultrasonically-assisted drilling of cortical bone. In Medical Engineering & Physics - March 2011 (Vol. 33, Issue 2, Pages 234-239, DOI: 10.1016/j.medengphy.2010.10.003)
    • (2010) Medical Engineering & Physics , vol.33 , Issue.2 , pp. 234-239
    • Alam, K.1    Mitrofanov, A.V.2    Silberschmidt, V.V.3
  • 22
    • 38549084686 scopus 로고    scopus 로고
    • Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries
    • Mathirajan M, Chandru V, Sivakumar A I 2007 Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries. Sādhanā, 32(5): 479-500
    • (2007) Sādhanā , vol.32 , Issue.5 , pp. 479-500
    • Mathirajan, M.1    Chandru, V.2    Sivakumar, A.I.3
  • 24
    • 77955545111 scopus 로고    scopus 로고
    • A hybrid evolutionary algorithm for distribution feeder reconfiguration
    • Niknam T, Khorshidi R, Firouzi B B 2010 A hybrid evolutionary algorithm for distribution feeder reconfiguration. Sādhanā 35(2): 139-162
    • (2010) Sādhanā , vol.35 , Issue.2 , pp. 139-162
    • Niknam, T.1    Khorshidi, R.2    Firouzi, B.B.3
  • 27
    • 84880307390 scopus 로고    scopus 로고
    • An Efficient Ant Colony Optimization Algorithm for Multiobjective Flow Shop Scheduling Problem
    • Engi
    • Rabanimotlagh, Ahmad. An Efficient Ant Colony Optimization Algorithm for Multiobjective Flow Shop Scheduling Problem. In World Academy of Science, Engi.
    • World Academy of Science
    • Rabanimotlagh, A.1
  • 28
    • 11244300486 scopus 로고    scopus 로고
    • Ant-colony algorithms for permutation flowshop scheduling to mini-mize makespan/total flowtime of jobs
    • Rajendra C, Ziegler H 2003 Ant-colony algorithms for permutation flowshop scheduling to mini-mize makespan/total flowtime of jobs. European journal of Operational Reseacrh
    • (2003) European Journal of Operational Reseacrh
    • Rajendra, C.1    Ziegler, H.2
  • 29
    • 34247624966 scopus 로고    scopus 로고
    • Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimization method
    • Rossi A, Dini G 2007 Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimization method. Robotics and Computer-Integrated Manufacturing, 23(5): 503-516.
    • (2007) Robotics and Computer-Integrated Manufacturing , vol.23 , Issue.5 , pp. 503-516
    • Rossi, A.1    Dini, G.2
  • 31
    • 1342276428 scopus 로고
    • Identification of the optimal control policy for the Markov decision process by bavk propagation
    • C H Dagli, S R Kumara, Y C Shin (eds), New York, ASME
    • Sastri T, Malave C O 1991 Identification of the optimal control policy for the Markov decision process by bavk propagation. Intelligent Engineering Systems Through Artificial Neural Network, C H Dagli, S R Kumara, Y C Shin (eds), New York, ASME, pp. 873-881.
    • (1991) Intelligent Engineering Systems Through Artificial Neural Network , pp. 873-881
    • Sastri, T.1    Malave, C.O.2
  • 32
    • 0034171939 scopus 로고    scopus 로고
    • Parameter estimation using compensatory neural networks
    • Sinha M, Kalra P K, Kumar K 2000 Parameter estimation using compensatory neural networks. Sādhanā 25(2): 193-203.
    • (2000) Sādhanā , vol.25 , Issue.2 , pp. 193-203
    • Sinha, M.1    Kalra, P.K.2    Kumar, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.